Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Strata Remedial ยท Sydney Remedial works strata committees can trust.

Concrete cancer, leaking balconies, failed waterproofing, cracked facades and building defects in apartment buildings. We work with owners corporations, strata managers and engineers from report to handover.

  • Owners corporations
  • Strata managers
  • Class 2 buildings
  • DBP registered BUP4254812
  • Engineer specifications
  • Residents kept informed
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Strata remedial works

Built for committees, not just buildings.

Strata remedial work is as much about people as it is about concrete. Committees need clear scopes they can compare, prices that hold, a programme that respects residents, and documentation that stands up at the next AGM.

In NSW, remedial work on Class 2 apartment buildings is regulated under the Design and Building Practitioners Act 2020. METCON holds DBP General Unrestricted registration (BUP4254812), so we can carry out regulated remedial building work and lodge the required declarations.

We work to the remedial engineer's specification or help you engage one, price the scope line by line so the committee can see exactly what it is paying for, and keep residents informed with notices, access plans and clean, safe sites.

METCON team briefing a client on a remedial site
DBPRegistered builder
Is this you?

Six signs your building needs remedial works

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Balconies leaking into units

Stains, drips and complaints from lots below balconies or podiums.

Concrete falling from the building

Spalling from balcony edges, soffits or columns. A safety issue for residents and passers-by.

Water in the carpark

Leaks through podiums, planter boxes or basement walls.

Cracked or drummy render

Facade render cracking or sounding hollow across the building.

Defects in a newer building

Waterproofing, cladding or structural defects in a building still within warranty periods.

A remedial report with no builder

An engineer's report sitting on file with nobody to price and deliver it.

Have an engineer's report or defect list? Send it through and we will price it line by line.

What we deliver

Remedial works across the whole building.

One accountable builder for the full scope, instead of separate trades the committee has to coordinate.

01

Concrete Cancer

Balcony edges, carpark soffits, columns and beams repaired to the engineer's specification.

02

Balcony Remediation

Membranes, falls, drainage, tiling and balustrades for whole-building balcony programmes.

03

Podium & Roof Waterproofing

Membranes over carparks, common areas and roof slabs.

04

Facade & Render Repairs

Render, brickwork, lintels and protective coatings with managed access.

05

Defect Rectification

Rectifying defects identified by building inspectors, engineers or the NSW Building Commission.

06

Common Property Works

Stairs, paths, retaining walls, planters and landscaping repairs.

Recent work

Strata Remedial projects.

A selection of recent strata remedial projects across Sydney.

View all projects
Our process

Clear scope. Held price. Documented.

Every strata project follows the same five steps, from report to handover pack.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

Everything your committee needs to sign off.

Line-item quotes, programme, resident notices, progress photos, hold-point records, product data, engineer sign-off and DBP declarations where required.

Why choose METCON

Sydney's strata remedial builders.

We have repaired concrete cancer, balconies, waterproofing and facades for owners corporations across Sydney, including jobs other builders walked away from.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
We're a strata block and needed a retaining wall replaced urgently. METCON moved fast, communicated well, and the residents are very happy.
PSPriya Sharma North Sydney
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
Strata Remedial Builders FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Do I need a DBP registered builder for strata remedial work?

For Class 2 apartment buildings in NSW, remedial work is regulated under the Design and Building Practitioners Act 2020. METCON holds DBP General Unrestricted registration (BUP4254812), so we can carry out that work and lodge the required declarations.

Can you work from our engineer's report?

Yes. We regularly price and deliver remedial scopes written by independent engineers, and we can also help you engage one if you do not have a report yet.

Can residents stay in the building during works?

In almost all cases, yes. We plan access, staging, noise and safety around residents and issue notices before disruptive work.

How much does remedial building work cost?

It depends entirely on the defect, its extent, access and the specification. A small concrete cancer patch is very different from a whole-building balcony programme. We inspect for free and provide an itemised written quote so you can see exactly where the money goes.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

GuideWhole-of-Building Remedial Programs: Fixing Everything in One GoRead the guide GuideNSW Strata Defects Survey: What the Latest Findings Mean for OwnersRead the guide GuideOne Scaffold, Many Fixes: Bundling Facade, Window and Balcony WorkRead the guide GuideEarly Contractor Involvement in Strata Remedial ProjectsRead the guide GuideA Strata Manager's Guide to Running Remedial ProjectsRead the guide GuideCapital Works Fund Plans: Budgeting for Strata Remedial WorkRead the guide Guide1960s and 1970s Red Brick Apartment Blocks: Common RepairsRead the guide GuideBalcony Safety Inspections for Strata Buildings in NSWRead the guide GuideWhat Is a Class 2 Building? NSW Rules for Apartment WorkRead the guide GuideWhat Goes in a Remedial Scope of Works for Strata?Read the guide GuideHow to Tender Strata Remedial Works in NSWRead the guide GuideLiving in Your Building During Remedial Works: What to ExpectRead the guide GuideDoes Strata Insurance Cover Leaks and Water Damage?Read the guide GuideRepair or Redevelop? Options for an Ageing Strata BuildingRead the guide GuideFunding Strata Remedial Works: Levies, Instalments and LoansRead the guide GuideStrata Repairs and Access to Your Apartment: What to KnowRead the guide GuideStrata Won't Fix a Leak? Your Options as an NSW OwnerRead the guide GuideAsbestos in Remedial Works: Older Homes and Strata BuildingsRead the guide GuidePool Deck Leaks in Apartment Buildings: Causes and RepairsRead the guide GuideRemedial Builder Checklist for Strata Managing AgentsRead the guide GuideYour Building Needs Remedial Works: An Owner's GuideRead the guide GuideStrata Quotes in NSW: The Two-Quote Rule for Larger WorksRead the guide GuideStaging a Building-Wide Balcony Repair ProgramRead the guide GuideBalcony Repairs for Walk-Up Apartment BlocksRead the guide GuideBalcony Repairs in Occupied Apartments: What to ExpectRead the guide GuideSection 106: The Owners Corporation's Duty to RepairRead the guide GuideStrata Remedial Contracts: Lump Sum vs Schedule of RatesRead the guide GuideHow Much Contingency for Strata Remedial Works?Read the guide GuideRoof Replacement on Walk-Up Apartment Blocks in SydneyRead the guide GuideRetaining Wall Repairs in Strata BuildingsRead the guide GuideDriveway and Ramp Repairs at Apartment BuildingsRead the guide GuideRetention and Security in Strata Remedial ContractsRead the guide GuideHow to Brief a Remedial Engineer for a Strata BuildingRead the guide GuideRemedial Works Hours and Noise in Sydney Apartment BuildingsRead the guide GuidePre-Start Condition Surveys for Strata Remedial WorksRead the guide GuideRunning an Owners Information Session for Remedial WorksRead the guide GuideHidden Damage Found During Strata Remedial WorksRead the guide GuidePractical Completion and Handover of Strata Remedial WorksRead the guide GuideDamp Ground Floor Apartments: Causes and Strata RepairsRead the guide GuideSagging or Collapsed Ceilings in Apartments: What to DoRead the guide GuideLobby and Common Area Refurbishment for Strata BuildingsRead the guide GuideStormwater Drainage Problems in Apartment BuildingsRead the guide GuidePaving and Path Repairs on Strata Common PropertyRead the guide GuidePrioritising Strata Repairs From a Condition ReportRead the guide GuideNeighbour Access for Scaffold and Remedial Works in NSWRead the guide GuideWhy the Remedial Tender Price Differs From the EstimateRead the guide GuideCommon Problems in 1990s and 2000s Sydney Apartment BuildingsRead the guide GuideBoundary Walls and Fences in Strata Schemes: RepairsRead the guide GuideEV Chargers in Apartment Car Parks: The Building WorksRead the guide
Where we work

Strata remedial works across Sydney.

Apartment buildings across the Eastern Suburbs, lower North Shore, Inner West, inner city and beyond.

Let's get started

Send us your report.

An engineer's report, defect list or a few photos is enough for us to start. We will review it and come back with next steps.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote