Balcony and terrace waterproofing, concrete and sandstone repairs and structural remediation for Vaucluse homes and apartment buildings exposed to the harbour and ocean.
Vaucluse is mostly large homes, with a smaller number of apartment buildings, many with harbour or ocean views and wide balconies, terraces and pool decks.
Exposure on both sides of the peninsula, sandstone sites and complex, older structures mean remedial work here often combines waterproofing, concrete repairs and careful structural work. One of our 5-star reviews comes from a Vaucluse client with complex sandstone foundations.

Vaucluse has heritage-listed properties and conservation areas, so changes to some homes and buildings need council approval.
Leaking balconies cause concrete cancer, failed render lets water into walls. We fix the cause and the damage, so you deal with one licensed builder.
We work to your engineer's or consultant's specification, photograph every hold point and hand over the records your strata committee, insurer and future buyers will ask for. For Class 2 buildings we handle the DBP Act requirements with your design practitioner.
You deal directly with the builder, from the first inspection in Vaucluse to the final flood test and handover.
Real reviews from strata buildings and homeowners.
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
Plain-language guides for owners and strata committees.
Straight answers from the builder. Anything else, just call.
Yes. These are some of the most common leaks we fix: we strip the finish, repair the slab or substrate, re-waterproof with proper upturns and outlets, flood test and re-finish.
Yes. We repair and re-waterproof balconies, terraces, podiums and wet areas on Vaucluse apartment buildings and homes, and repair concrete cancer and balustrades at the same time where needed.
Yes. METCON is a licensed builder (384697C) and a registered building practitioner under the Design and Building Practitioners Act (BUP4254812), so we can carry out remedial work on Class 2 apartment buildings.
Many repairs are maintenance and do not, but some works can. Vaucluse has heritage-listed properties and conservation areas, so changes to some homes and buildings need council approval. The council is Woollahra Municipal Council. We check what applies before quoting.
It depends on what is under the tiles or render, access and the size of the job. We inspect, test where needed and give an itemised quote, with rates for anything hidden.
We work right across Eastern Suburbs and the rest of Sydney. See all service areas.
Free inspection and a straight answer from a licensed, DBP registered Sydney builder.