Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Rising Damp ยท Sydney Rising damp, treated at the cause.

Bubbling paint, crumbling render and a white salty tide mark at the base of the walls. We find why moisture is rising, install a new damp proof course and repair the damaged walls properly.

  • Rising damp treatment
  • Damp proof course injection
  • Salt damp render repairs
  • Sub-floor ventilation
  • Terraces and heritage homes
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
What is rising damp

Ground moisture climbing the walls.

Rising damp happens when moisture from the ground is drawn up through brick, stone or mortar by capillary action. In a healthy wall a damp proof course (DPC) stops it near the base. When the DPC has failed, been bridged or was never installed, moisture keeps climbing.

It is especially common in Sydney's older terraces and cottages, where original DPCs were often slate or bitumen that has deteriorated, and where later paving, garden beds or render have been built up over the DPC line. As the water evaporates it leaves salts behind, which crystallise and break down plaster, render and even the masonry itself.

Treating rising damp properly means fixing the cause and then repairing the damage. That usually involves lowering bridging ground levels, improving drainage and sub-floor ventilation, injecting a new chemical DPC, and replacing salt-contaminated render and plaster with a breathable, salt-resistant system.

METCON inspecting damp and salt damage to heritage sandstone walls
DBPRegistered builder
Is this you?

Six signs of rising damp

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

A tide mark on the walls

A horizontal band of staining or salt, usually up to about a metre above floor level.

Bubbling or flaking paint

Paint lifting at the base of internal and external walls.

Crumbling render or plaster

Salt damage breaks down the surface until it powders or falls away.

White salt deposits

Fluffy white efflorescence on brickwork, stone and plaster.

Musty smell and mould

Persistent damp smell in rooms with affected walls, often worse in winter.

Rotting skirting boards

Timber in contact with damp walls swelling, staining or rotting.

Tide marks or crumbling render? Send us photos of the affected walls and outside ground levels and we will give you an initial view.

What we do

Rising damp repairs, start to finish.

An injected DPC alone will not fix a wall if the ground is still bridging it or the old salt-laden render stays on. We fix the whole problem.

01

Diagnosis

Moisture readings and inspection to confirm rising damp, not a leak, condensation or a plumbing fault that looks the same.

02

Damp Proof Course Injection

A chemical DPC injected into the mortar course to create a new barrier against rising moisture.

03

Salt-Damaged Render Repairs

Remove contaminated render and plaster and replace it with a breathable, salt-resistant system.

04

Ground Level & Drainage

Lower paths and garden beds that bridge the DPC, and fix drainage directing water at the walls.

05

Sub-Floor Ventilation

Clear or add vents so the sub-floor can dry out and stay dry.

06

Heritage Masonry Repairs

Replace fretting bricks and sandstone and repoint with lime-based mortars suited to older walls.

Recent work

Rising Damp projects.

A selection of recent rising damp projects across Sydney.

View all projects
Our process

Dry walls. Lasting repairs.

Every rising damp job follows the same five steps, from diagnosis to handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

Walls that dry out and stay dry.

Before and after moisture readings, photos, product data and a clear record of what was done, useful for insurers and when you sell.

Why choose METCON

Sydney's rising damp builders.

Rising damp is often misdiagnosed and over-sold. We confirm the cause first and fix it with the right combination of treatments for your walls.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

Constatine and his team were outstanding from start to finish. They responded quickly, arrived on time for the quote, and once awarded the project, completed everything on schedule. The property was built in 1880 and presented a very difficult scope of work, but the team handled it expertly. We received regular updates, excellent advice, and the quality of workmanship was exceptional. They were also extremely tidy throughout the process. I could not recommend METCON highly enough.
MMatthew Enmore
We have been undertaking a considerable repair and restoration of our 1850 residence in Darlinghurst. Constatine and his team completed outstanding work, all at a very competitive price. Every deadline was met with no increase to the original quote. Their knowledge, gathered over many years, and their incredible eye for detail significantly improved the final outcome beyond what was originally proposed. I rate them very highly and would recommend them wholeheartedly.
NDNicholas Davie Darlinghurst
Constatine and his team were always extremely friendly and easy to deal with, which made the entire process smooth from the very beginning. We were absolutely thrilled with the final outcome. They took great pride in their work, constantly suggesting ways to improve the result and offering cost-effective alternatives. They went above and beyond, even helping us with our own DIY improvements once they had finished the job. We can highly recommend Constatine and his team.
HGHenry Greenacre Bronte
Rising Damp FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

What is remedial building?

Remedial building is the repair of defects, damage and deterioration in existing buildings, such as concrete cancer, leaking balconies, failed waterproofing, rising damp and cracked facades. The aim is to fix the underlying cause and restore the building's performance, not just its appearance.

Do I need a DBP registered builder for strata remedial work?

For Class 2 apartment buildings in NSW, remedial work is regulated under the Design and Building Practitioners Act 2020. METCON holds DBP General Unrestricted registration (BUP4254812), so we can carry out that work and lodge the required declarations.

How much does remedial building work cost?

It depends entirely on the defect, its extent, access and the specification. A small concrete cancer patch is very different from a whole-building balcony programme. We inspect for free and provide an itemised written quote so you can see exactly where the money goes.

Is remedial work covered by warranty?

Residential building work in NSW carries statutory warranties under the Home Building Act 1989: six years for major defects and two years for other defects. We provide full documentation at handover.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Rising damp treatment across Sydney.

Terraces and older homes in the Inner West, Eastern Suburbs, inner city and lower North Shore are where we see it most.

Let's get started

Send us photos of the walls.

Photos of the affected walls inside and the ground levels outside are enough for an initial view. We will book an inspection to confirm.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote