Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Enmore ยท Inner West Balcony & strata remedial builders in Enmore.

Remedial building for Enmore terraces, shop-top buildings and walk-up blocks: rising damp, cracks, brickwork, roof leaks and balcony repairs.

  • Free inspection in Enmore
  • Itemised written quote
  • Class 2 and strata experience
  • Licensed builder 384697C
  • DBP registered BUP4254812
  • Photos and records for your strata
Talk directly with the builder0415 840 500

Free inspection in Enmore

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Inspection in Enmore
DBP
Registered for Class 2 work
$20M
Public liability insurance cover
Remedial building in Enmore

Narrow terraces and busy shop-tops.

Enmore has narrow Victorian terraces and cottages, shop-top buildings along Enmore Road and small walk-up apartment blocks.

Tight sites limit airflow and access, so damp is a common problem in older homes, and courtyards with poor drainage can make it worse. Shop-tops often need work on parapets, rear walls and awnings.

Common problems we fix in Enmore

  • Rising damp in narrow homes
  • Poorly drained courtyards
  • Parapet and awning repairs
  • Old mortar and fretting bricks
  • Walk-up balcony leaks
Heritage brick facade remedial works by METCON
EnmoreInner West

Enmore at a glance

RegionInner West
CouncilInner West Council
Building classClass 2 apartments, strata and homes
InspectionFree, usually within a few days

Parts of Enmore are heritage conservation areas, so visible changes to terraces and shop-tops may need council approval.

Remedial services in Enmore

One builder for the whole problem.

Leaking balconies cause concrete cancer, failed render lets water into walls. We fix the cause and the damage, so you deal with one licensed builder.

Why METCON

Strata remedial work, done once.

We work to your engineer's or consultant's specification, photograph every hold point and hand over the records your strata committee, insurer and future buyers will ask for. For Class 2 buildings we handle the DBP Act requirements with your design practitioner.

You deal directly with the builder, from the first inspection in Enmore to the final flood test and handover.

Principal Contractor
Meteora Constructions Pty Ltd
Builder Licence384697C
DBP RegistrationBUP4254812
Demolition LicenceAD214430
Public Liability$20M
ServicingEnmore and Inner West
ABN 89 151 074 421
What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from strata buildings and homeowners.

I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Helpful guides

Know more before you start.

Plain-language guides for owners and strata committees.

Enmore FAQ

Remedial building in Enmore: questions.

Straight answers from the builder. Anything else, just call.

Why does my Enmore courtyard make my walls damp?

Paved courtyards can direct water against walls and bridge the damp course. Better falls, drainage and lowering paving where possible often help as much as treating the wall itself.

Do you do balcony repairs and waterproofing in Enmore?

Yes. We repair and re-waterproof balconies, terraces, podiums and wet areas on Enmore apartment buildings and homes, and repair concrete cancer and balustrades at the same time where needed.

Are you registered for Class 2 apartment work in Enmore?

Yes. METCON is a licensed builder (384697C) and a registered building practitioner under the Design and Building Practitioners Act (BUP4254812), so we can carry out remedial work on Class 2 apartment buildings.

Do remedial works in Enmore need council approval?

Many repairs are maintenance and do not, but some works can. Parts of Enmore are heritage conservation areas, so visible changes to terraces and shop-tops may need council approval. The council is Inner West Council. We check what applies before quoting.

How much do remedial repairs cost in Enmore?

It depends on what is under the tiles or render, access and the size of the job. We inspect, test where needed and give an itemised quote, with rates for anything hidden.

Nearby areas

Also servicing near Enmore.

We work right across Inner West and the rest of Sydney. See all service areas.

Leaking balcony or concrete cancer in Enmore?

Free inspection and a straight answer from a licensed, DBP registered Sydney builder.

Call now Free Quote