Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Concrete Repairs ยท Sydney Cracked, spalling or failing concrete? Repaired properly.

Cracked slabs, spalling edges, exposed reinforcement, broken steps and failing structural concrete. We work out why the concrete failed and repair it with the right method, from crack injection to full recasting.

  • Concrete repair services
  • Concrete crack repairs
  • Spalling concrete repair
  • Structural concrete repair
  • Class 2 strata (DBP registered)
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Why concrete fails

Every crack has a cause.

Concrete cracks for different reasons: shrinkage as it cures, ground movement under slabs and footings, overloading, and corrosion of the steel inside it. A shrinkage crack in a driveway and a crack caused by corroding reinforcement in a balcony need completely different repairs.

Spalling, where pieces of concrete break away from the surface, is usually caused by corroding steel. As steel rusts it expands and pushes the concrete off. In Sydney this is especially common in coastal suburbs and older apartment buildings, and is often called concrete cancer.

The right repair depends on the cause. Fine non-structural cracks may only need sealing. Structural cracks may need epoxy injection or stitching. Spalling needs the damaged concrete removed, the steel treated and the section rebuilt.

Spalled concrete with exposed reinforcement before repair
DBPRegistered builder
Is this you?

Concrete problems we repair

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Cracked slabs and floors

Cracks in house slabs, garage floors and driveways, including cracks that are widening.

Spalling concrete

Pieces breaking off slab edges, balconies, columns and soffits.

Exposed, rusting steel

Reinforcement visible where cover concrete has fallen away.

Rust stains

Brown streaks from cracks, usually a sign of corroding steel inside.

Uneven or sinking slabs

Slabs that have dropped or tilted from ground movement.

Damaged steps and edges

Broken stair nosings, kerbs and slab edges.

Not sure if a crack is structural? Send us a photo with a coin or tape measure next to it.

Repair methods

The right repair for the concrete.

We match the repair method to the cause, and bring in an engineer for structural repairs.

01

Crack Sealing

Flexible sealants and routing for non-structural cracks to keep water out.

02

Epoxy Crack Injection

Low-viscosity epoxy injected into structural cracks to bond the concrete back together.

03

Spalling & Concrete Cancer Repair

Break-out to sound concrete, steel treatment and reinstatement with repair mortars.

04

Recasting Sections

Formwork and new concrete for larger damaged areas, to the engineer's design.

05

Slab & Step Repairs

Repairs to slab edges, stairs, kerbs and garage floors.

06

Protective Coatings

Anti-carbonation coatings and sealers to slow future deterioration.

Recent work

Concrete Repairs projects.

A selection of recent concrete repairs projects across Sydney.

View all projects
Our process

Diagnosed, then repaired.

Every concrete repair follows the same five steps, from diagnosis to documented handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

Repairs that last, with the records to prove it.

Photos, product data and engineer sign-off where required, so owners, strata committees and insurers can see what was done.

Why choose METCON

Sydney concrete repair contractors.

Concrete repairs fail when the cause is ignored or the damaged concrete is not fully removed. We fix the cause and repair to specification.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Concrete Repairs FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Can cracked concrete be repaired?

Yes. Non-structural cracks can be sealed, structural cracks can be bonded with epoxy injection, and spalled areas can be broken out and rebuilt. The right method depends on why the concrete cracked.

What causes concrete spalling?

Usually corrosion of the steel reinforcement. Rusting steel expands and pushes the concrete off, which is why spalling is often called concrete cancer.

Do concrete repairs need an engineer?

Structural repairs to slabs, beams, columns and balconies should be specified by an engineer. Small non-structural repairs often do not need one.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

GuideMagnesite Floors in Sydney Apartments: Problems and RepairsRead the guide GuideAnti-Carbonation Coatings and Silane Sealers for ConcreteRead the guide GuideConcrete Cancer in Suspended Driveways and Garage SlabsRead the guide GuideCar Park Traffic Deck Coatings: Waterproofing Strata Car ParksRead the guide GuideConcrete Cancer in Houses: Garages, Balconies and SlabsRead the guide GuideFixing Cracks in Concrete Slabs and Floors: What Actually WorksRead the guide GuideWhat Is Concrete Spalling? Causes and How to Fix ItRead the guide GuideCrack Injection for Leaking Concrete: Epoxy vs PolyurethaneRead the guide GuideConcrete Patching: When a Patch Works and When It FailsRead the guide GuideBasement Leaking? Causes and Basement Leak RepairsRead the guide GuideConcrete Cancer Signs: 8 Warnings Not to IgnoreRead the guide GuideSpalling Concrete Stairs and Landings: Repairs for StrataRead the guide GuideCar Park Expansion Joint Repairs: Stopping Leaks and DamageRead the guide GuideBasement Leak Repair Cost in Sydney: What Affects the PriceRead the guide GuideConcrete Cancer on One Balcony: Repair OptionsRead the guide GuideStructural Concrete Repair: Columns, Beams and SlabsRead the guide GuideDriveway and Ramp Repairs at Apartment BuildingsRead the guide GuideHidden Damage Found During Strata Remedial WorksRead the guide GuidePost-Tensioned Slabs in Apartment Buildings: Drill With CareRead the guide GuideEV Chargers in Apartment Car Parks: The Building WorksRead the guide GuidePaving and Path Repairs on Strata Common PropertyRead the guide
Where we work

Concrete repairs across Sydney.

Homes, strata buildings, carparks and commercial buildings across Sydney and surrounding NSW.

Let's get started

Send us photos of the concrete.

A few photos of the cracking or spalling, with something for scale, is enough for an initial view.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote