External concrete stairs and landings in apartment buildings get rain, foot traffic and little maintenance. Over time, steel close to the surface rusts, nosings crack and pieces break away. Because everyone uses them, they are a safety priority.
Common problems
- Spalling edges and nosings, where steel is close to the surface.
- Rust stains and cracks along treads and landings.
- Loose or rusted handrail fixings.
- Cracks where stairs meet walls or landings.
- Slippery or worn surfaces.
- Water ponding on landings.

Why stairs deteriorate
Stair nosings and edges often have thin concrete cover. Water and salt reach the steel, which rusts and pushes concrete off. See concrete cancer signs and carbonation vs chloride.
Safety first
Damaged stairs are a trip and fall risk. Mark hazards, remove loose pieces, and arrange repairs promptly. In strata buildings, common stairs are usually the owners corporation's responsibility.
How they are repaired
- Inspect, and get engineering input where damage is extensive.
- Break out damaged concrete around the steel.
- Clean and treat or replace corroded steel.
- Rebuild nosings and edges with repair mortar, using formwork.
- Fix handrail fixings and seal cracks.
- Apply a protective coating and slip-resistant finish where suitable.
See concrete patching.
Keeping access open
Stairs are often an exit path. Works may need to be staged one side or one flight at a time, with temporary access and signage, and fire exits kept clear.
How the repair helps
Repairs remove a trip hazard, protect the steel and improve how the building looks and feels. They are often a quick job with an immediate safety benefit.
Concrete stair repairs
We repair concrete stairs, landings and walkways on apartment and commercial buildings. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Why are our concrete stair edges breaking off?
Usually because steel near the surface is rusting and expanding, pushing the concrete off. It is a form of concrete cancer.
Can concrete stairs be repaired without replacing them?
Usually, yes. Damaged areas are broken out, steel treated and edges rebuilt with repair mortar.
Can residents use stairs during repairs?
Often, with staging and temporary access. Fire exits must be kept available.