From home renovations to multi-million dollar builds, one licensed Sydney team. You deal directly with the director, from first site visit to final handover.
Choose your project type. Same licensed team, same director on site, whatever the size.
From engineered retaining walls to full structural remediation, one licensed team handles the whole job. No subbing out the hard parts.
View all services
Most requested
Concrete sleeper, timber, sandstone, gabion and engineered systems. AS 4678 compliant and council-approved.
Explore service
Balconies, facades, carpark waterproofing and structural crack repair for owners corporations.
Explore service
Homes
Extensions, first floor additions, renovations, knock-down rebuilds and granny flats. Structural rigour at residential scale.
Explore service
Rock-filled steel mesh walls for slopes, driveways and landscaping. Durable, free-draining and engineered to suit.
Explore service
Concrete, formwork, steel fixing, underpinning and foundation repairs. Engineer-coordinated.
Explore service
Fitouts, refurbishments, base-build upgrades, office and warehouse works, delivered to programme.
Explore service
Licensed structural demolition, strip-outs, site clearing and excavation. Licence AD214430.
Explore serviceTell us about the job. We will visit the site, assess the scope and give you a straight answer, free of charge.
A family builder with the licences, insurance and engineering discipline to take on the jobs other builders avoid.
BUP4254812. Approved for all building classes with no project limitations.
Builder 384697C, Demolition AD214430, $20M public liability and iCare/HBCF cover.
Over 40 years across residential, commercial, strata and civil work. We understand load paths and concrete.
Compliance paperwork, engineering sign-offs, progress reports and transparent cost tracking.
You deal with the director and the tradespeople. One point of contact, clear accountability.
We visit your site and give you a straight answer on cost and timeline. No obligation.
Real reviews from homeowners, strata and builders. Read more reviews
I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
They handled the DA, the engineer, and the build. We didn't have to chase council once. Massive wall, done in under two weeks.
We're a strata block and needed a retaining wall replaced urgently. METCON moved fast, communicated well, and the residents are very happy.
Book a free site assessment. Straight answers on cost, scope and timeline.
METCON (Meteora Constructions Pty Ltd) is a Sydney-based construction company with over 40 years of hands-on building experience. We bring engineering discipline to every project: structural, remedial, residential and commercial. You deal directly with the director and the tradespeople.
We hold multi-discipline capability across structural, demolition, excavation and construction, providing single-source responsibility for the full scope of work.
I started building alongside my father in the 1970s. That is where I learned there are no shortcuts to quality construction. Every foundation, every pour, every steel connection. It either meets the specification or it does not.
When I founded METCON, I wanted a company that operates the same way I have always worked: correct engineering, clear communication, accountability at every stage. No project managers relaying messages. No ambiguity.
Whether it is a complex strata remediation programme or a residential extension, we bring the same discipline. The same documentation. The same commitment to getting it right from the very first time.
Five clear stages, no surprises. You know exactly what happens next and who is responsible.
We inspect the site, assess conditions and review engineering reports and council requirements before quoting.
A detailed quote with a clear scope of works, methodology and timeline. Every line item defined upfront.
We coordinate with structural engineers and prepare documentation, council applications and compliance submissions.
Experienced crew build to engineer specifications and Australian Standards, with progress documented at each milestone.
Final inspections, defect rectification, clean-up and formal handover with all compliance certificates.
One point of contact. Every project is run by the director and a dedicated site supervisor.
Every licence and registration we hold is public. Verify them yourself on the NSW Government register before you sign anything.
Strata · Apartments · Multi-residential · Commercial · Mixed-use
Verify our licence on the NSW Government register →"We visit the site, assess the scope, and give you a straight answer. No obligation, no runaround."
Con Hassiotis, Director