Building disputes that go to court turn on expert evidence. We prepare independent expert reports on defects, causation, workmanship, rectification scope and cost, and give evidence when called, under the expert witness code of conduct.
Larger building disputes, claims outside NCAT's jurisdiction and claims between builders, developers, owners corporations and subcontractors often end up in the NSW courts. In court, the rules on expert evidence are stricter. Expert reports in NSW courts must comply with the expert witness code of conduct in the Uniform Civil Procedure Rules, and a report that does not comply can be given less weight or ruled out.
The court expects an expert to be independent and to help the court, not to argue a side. Experts are often directed to meet, prepare a joint report setting out where they agree and disagree, and give evidence together in the witness box. A builder who understands how work is actually done holds up well in that setting.
We provide expert opinion on building defects, the cause of damage, whether work meets the contract, the National Construction Code and Australian Standards, what rectification is reasonable and what it costs. If an issue sits outside our field, such as structural engineering design or hydraulic design, we say so and work alongside the right specialist.

If any of these sound familiar, it is worth a call. We will tell you which report or quotation will help, and confirm a fixed fee before we start.
The amount in dispute is beyond what the Tribunal can award, or the claim is not a home building claim.
Defects, variations and delay disputes between developers, head contractors and subcontractors.
Owners corporation claims against a developer or builder for defects in common property.
Cracking, movement or water damage you say was caused by excavation or building next door.
Your solicitor has asked for an independent building expert to review the evidence.
The court has directed experts to confer and prepare a joint report.
Solicitors: send the letter of instruction and the brief, and we will confirm our availability, timing and a fixed fee for the report.
From an initial review of the merits to giving evidence concurrently with the other side's expert.
A short review of the documents and photos so you and your lawyer know the strengths and weaknesses early.
A full report answering the questions in the letter of instruction, with reasons and the code of conduct acknowledgement.
What caused the cracking, leak or failure, and whether it relates to the work in dispute.
A buildable scope and an itemised, fixed-price costing for the remedy we consider reasonable.
A reasoned review of the other side's expert report, item by item.
Conferring with other experts, joint reports and concurrent evidence when the court directs it.
Court timetables are strict. We agree the scope, fee and delivery date at the start and stick to them.
Tell us what the report is for and send the contract, plans, photos, correspondence and any Tribunal directions. We confirm the scope, timing and a fixed fee in writing before we attend.
We inspect, measure and photograph every item, take moisture readings and carry out non-destructive checks where they help. Each item is numbered and located.
Each item is assessed against the contract, the approved plans, the National Construction Code, Australian Standards and the manufacturer's instructions, and we identify the cause, not just the symptom.
You receive a written report with our opinion and reasons for each item, the scope of work to fix it and an itemised, fixed-price costing that shows how every figure was calculated.
We answer questions, prepare supplementary reports if new information comes to light, and attend an expert conclave, joint report or hearing when directed, with those fees agreed in advance.
We have built and repaired buildings for over 40 years. Our opinions are practical, reasoned and grounded in how work is actually done on site.
Licensed and DBP registered builders with decades of remedial, structural and residential work across Sydney.
We have built and repaired buildings in Sydney for over 40 years, so our scopes are buildable and our costs come from what the work really takes.
Builder licence 384697C and DBP General Unrestricted registration BUP4254812, including Class 2 apartment buildings.
Reports follow the structure NCAT and the courts expect: instructions, facts and assumptions, reasons for each opinion and the code of conduct acknowledgement.
You know the cost of the inspection and report before we attend. No hourly meter running in the background.
Every item is scoped and priced separately, with preliminaries, access, waste, supervision, margin and GST shown, so the numbers stand up to scrutiny.
Dated photos, measurements, readings and references to the relevant standards for every item, laid out so a member or judge can follow it.
Real reviews from METCON clients.
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
Straight answers. Anything else, just ask.
Expert witnesses in NSW courts must comply with the expert witness code of conduct in the Uniform Civil Procedure Rules 2005. The expert's overriding duty is to help the court impartially, and the report must acknowledge the code.
Yes. Most of our court work comes through solicitors. We work from a letter of instruction and the brief, and we agree scope, timing and fees in writing.
We say so in the report, as the code requires. For questions of structural engineering design, hydraulics or fire engineering, we can work alongside the right specialist.
Yes. When we act as an expert, our duty is to the Tribunal or court, not to the person who engaged us, and we say so in the report. We disclose any relationship with the parties and whether we have been asked to quote for the rectification work, as the expert code of conduct requires.
Yes, when the Tribunal or court directs it or you ask us to. Attendance, joint reports and conclaves are quoted separately and agreed in advance.
Most disputes need more than one document: a defect report, a costing, a Scott Schedule and sometimes a hearing. We can prepare them all from one inspection.
Back to Inspections & ReportsPlain-language guides from our team on the questions we are asked most.
Sites across Sydney and surrounding NSW, for owners, builders, developers, owners corporations and their lawyers.
Send the letter of instruction, key documents and your court timetable. We will confirm availability and a fixed fee.