You filed your expert report. Weeks later, the builder's expert report arrives and says most of your defects are not defects, the rest are minor, and your costs are inflated. It feels like a setback. It is normal, and it can be answered.
Read it calmly, item by item
Put the two reports side by side. For each item, note whether the other expert:
- Agrees it is a defect.
- Agrees it is a defect but proposes a cheaper fix.
- Agrees the fix but says it costs less.
- Says it is not a defect at all.
- Does not deal with it.
You will usually find more agreement than the summary suggests.
Look for weaknesses
- Did their expert inspect, or rely on photos?
- Did they test anything, or just look?
- Did they refer to the plans, the contract and the relevant standards?
- Are their repairs patches that leave the cause in place?
- Are their rates realistic for a licensed builder doing the work in Sydney?
- Did they comply with the expert code and disclose their instructions?
The reply report
If the Tribunal or court allows it, your expert can prepare a reply, also called a supplementary report. It responds to the other expert item by item, accepts points that are right, and explains with reasons where the other expert is wrong. Accepting good points builds credibility.
The conclave usually narrows things
Experts who disagree on paper often agree on many items once they are on site together. Your expert should go into the conclave knowing which items matter most. See expert conclaves and joint reports.
Costs disputes
When the argument is about price rather than defects, a fixed-price quote from a builder willing to do the work at that price is strong evidence. See how rectification costs are assessed.
Peer review of the other side's report
We review opposing expert reports, prepare reply reports and update Scott Schedules. See NCAT expert reports and court expert witness. The fee is fixed and agreed in writing before the inspection, so you know the cost of the report before you commit. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.
This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.
Frequently asked questions
Can I ask a different expert to review the other side's report?
Yes, but evidence directions may limit how many experts you can rely on. Check with your lawyer or the Tribunal's directions.
Should my expert change their opinion if the other expert is right?
Yes. The expert's duty is to the Tribunal. Conceding a fair point makes the rest of the report more persuasive.
Do I need a reply report if there will be a conclave?
Not always. Sometimes the conclave and joint report do the job. Your expert and lawyer can advise.