Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Structural Crack Repairs ยท Sydney Cracks in your walls? Find the cause first.

Cracks in brickwork, render, plaster and slabs can be cosmetic or a sign of structural movement. We diagnose why the building is cracking, fix the cause, then repair the cracks so they stay closed.

  • Wall crack repairs
  • Structural crack repair
  • Brick crack stitching
  • Lintel replacement
  • Underpinning
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Why buildings crack

The crack is the symptom.

Much of Sydney is built on reactive clay that swells when wet and shrinks when dry. Footings move with it, and walls crack. Leaking pipes, poor drainage and large trees make that movement worse.

Other common causes are corroding steel lintels over windows and doors, failed wall ties in cavity brickwork, overloaded or altered structures, and long walls without movement joints.

Filling a crack without fixing the cause means it reopens. We work out what is moving and why, involve an engineer where the cracking is structural, and then repair with the method that suits the wall.

New steel lintel installed over an opening in brickwork
DBPRegistered builder
Is this you?

When a crack needs attention

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Wider than a few millimetres

Cracks you can fit a coin into deserve an inspection.

Getting wider over time

Mark the ends and date them. Growth means the movement is ongoing.

Diagonal or stepped cracks

Especially from the corners of windows and doors.

Horizontal cracks

Can indicate wall tie failure or pressure on the wall.

Sticking doors and windows

Frames racking out of square as the structure moves.

Cracks in slabs and floors

Combined with uneven floors, often a footing issue.

Send us a photo of the crack with a tape measure beside it, and tell us if it has changed.

How we repair cracks

Repairs matched to the cause.

From a single cracked lintel to a whole house moving on clay, we fix the cause and the crack.

01

Helical Crack Stitching

Stainless steel bars bonded into the mortar joints to tie cracked brickwork back together.

02

Lintel Replacement

Corroded steel lintels over openings propped, removed and replaced.

03

Wall Tie Replacement

Retrofit ties to reconnect the outer skin of cavity brick walls.

04

Epoxy Injection

Structural bonding of cracked concrete slabs, beams and walls.

05

Drainage & Moisture Control

Fixing leaks and drainage that cause soil movement under footings.

06

Underpinning

Strengthening footings where the foundations themselves have moved.

Recent work

Crack Repairs projects.

A selection of recent crack repairs projects across Sydney.

View all projects
Our process

Diagnosed first. Repaired for good.

Every crack repair follows the same five steps, from diagnosis to documented handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

Fix the movement, then the crack.

Engineer involvement where needed, repairs matched to the wall, and finishes made good so you cannot see where the crack was.

Why choose METCON

Sydney structural crack repair specialists.

Cracks are one of the most misdiagnosed building problems. We investigate before we quote, so you pay for the repair that actually fixes it.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
We have been undertaking a considerable repair and restoration of our 1850 residence in Darlinghurst. Constatine and his team completed outstanding work, all at a very competitive price. Every deadline was met with no increase to the original quote. Their knowledge, gathered over many years, and their incredible eye for detail significantly improved the final outcome beyond what was originally proposed. I rate them very highly and would recommend them wholeheartedly.
NDNicholas Davie Darlinghurst
Constatine and his team were outstanding from start to finish. They responded quickly, arrived on time for the quote, and once awarded the project, completed everything on schedule. The property was built in 1880 and presented a very difficult scope of work, but the team handled it expertly. We received regular updates, excellent advice, and the quality of workmanship was exceptional. They were also extremely tidy throughout the process. I could not recommend METCON highly enough.
MMatthew Enmore
Crack Repairs FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Are cracks in walls serious?

Hairline cracks are often cosmetic. Cracks wider than a few millimetres, cracks that are growing, diagonal cracks from openings and horizontal cracks should be inspected.

How are structural cracks in brick walls fixed?

The cause is fixed first, such as drainage, a corroded lintel or failed wall ties. The wall is then repaired, usually with helical crack stitching and matched mortar.

Do I need underpinning?

Only if the footings themselves have moved and cannot support the building. Many cracking problems are solved by fixing drainage, leaks and lintels. An engineer confirms when underpinning is needed.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Crack repairs across Sydney.

Houses, terraces, apartments and commercial buildings across Sydney, particularly areas on reactive clay soils.

Let's get started

Send us photos of the crack.

A photo with a tape measure for scale, where the crack is, and whether it is getting worse is enough to start.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote