Storm damage, burst pipes, leaks, fallen trees and impact damage. Insurers want to know what caused the damage, what needs repairing and what it will cost. We inspect, report on the cause, scope the repairs and price them at a fixed price, with the photos to back it up.
Most building insurance policies cover sudden events like storms, bursting pipes and impact, but exclude wear and tear, gradual leaks, poor maintenance and defective building work. That means the first question an insurer asks is what caused the damage and when. A clear, reasoned builder's report on cause is often the difference between a claim being accepted or declined.
The second question is what the repair will cost. Insurers and their assessors compare quotes, and a quote that lumps everything together or misses hidden damage leads to underpayment and arguments later. We scope the repair properly, including what is likely behind linings, and price each item so the assessor can see exactly what is included.
For strata buildings, damage often crosses lot and common property boundaries, and the strata policy, the lot owner's contents policy and the cause all matter. We set out where the damage is, where it came from and which work belongs to which area, so the strata manager and the insurer can sort out responsibility.

If any of these sound familiar, it is worth a call. We will tell you which report or quotation will help, and confirm a fixed fee before we start.
Roof damage, water entry, fallen trees or damaged walls, fences and balconies after a storm.
Ceilings, walls and floors damaged by a burst pipe, overflow or roof leak.
The insurer says the damage is wear and tear or a gradual leak, and you disagree.
You have been asked to provide a builder's report or repair quote to support the claim.
Damage affecting common property and several lots, with questions over who pays.
A vehicle, fallen tree or other impact has damaged the structure.
Is the building unsafe or still letting water in? Call us now. We can make it safe first and report on it at the same time.
Everything an insurer, assessor or strata manager needs to make a decision, in one document.
What caused the damage and our reasons, including signs of a sudden event or a longer-term problem.
Temporary protection and make safe work when the building is open to the weather or unsafe.
Every damaged area, room by room, with photos and moisture readings where water is involved.
What needs replacing and what can be repaired, including hidden damage we can reasonably expect.
An itemised repair price the insurer or assessor can compare item by item.
A reasoned response when a claim is declined or underpaid, for internal review or AFCA.
The faster the damage is documented, the stronger the claim. We move quickly after storms and leaks.
Tell us what the report is for and send the contract, plans, photos, correspondence and any Tribunal directions. We confirm the scope, timing and a fixed fee in writing before we attend.
We inspect, measure and photograph every item, take moisture readings and carry out non-destructive checks where they help. Each item is numbered and located.
Each item is assessed against the contract, the approved plans, the National Construction Code, Australian Standards and the manufacturer's instructions, and we identify the cause, not just the symptom.
You receive a written report with our opinion and reasons for each item, the scope of work to fix it and an itemised, fixed-price costing that shows how every figure was calculated.
We answer questions, prepare supplementary reports if new information comes to light, and attend an expert conclave, joint report or hearing when directed, with those fees agreed in advance.
Insurers decide claims on cause and cost. A clear builder's report with photos, readings and an itemised quote gives you the best chance of a fair outcome.
We repair storm and water damage, leaks and structural damage across Sydney, so our scopes are complete and our prices are real.
We have built and repaired buildings in Sydney for over 40 years, so our scopes are buildable and our costs come from what the work really takes.
Builder licence 384697C and DBP General Unrestricted registration BUP4254812, including Class 2 apartment buildings.
Reports follow the structure NCAT and the courts expect: instructions, facts and assumptions, reasons for each opinion and the code of conduct acknowledgement.
You know the cost of the inspection and report before we attend. No hourly meter running in the background.
Every item is scoped and priced separately, with preliminaries, access, waste, supervision, margin and GST shown, so the numbers stand up to scrutiny.
Dated photos, measurements, readings and references to the relevant standards for every item, laid out so a member or judge can follow it.
Real reviews from METCON clients.
I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
Excellent communication throughout. Constatine and his team were able to assist us immediately on an urgent government project, improved the plans we already had, and provided multiple options to suit our needs. Highly recommended.
Straight answers. Anything else, just ask.
Insurers make their own decisions, but a clear builder's report on cause, with photos and readings, and an itemised repair quote gives them what they need to assess the claim properly.
Often, yes. We can inspect and give a reasoned opinion on the cause and timing of the damage, which you can use to ask the insurer to review its decision.
Yes. Where a building is unsafe or open to the weather, we can carry out make safe work and document the damage at the same time.
It depends on the size of the property, the number of items and what the report is for. We confirm a fixed fee in writing before we attend, based on your documents and a short call, so there are no surprises.
Tell us your deadline when you first call. We schedule inspections around Tribunal and court timetables and agree a delivery date upfront. Urgent matters are often possible, but more notice always gives a better report.
Most disputes need more than one document: a defect report, a costing, a Scott Schedule and sometimes a hearing. We can prepare them all from one inspection.
Back to Inspections & ReportsPlain-language guides from our team on the questions we are asked most.
Houses and apartment buildings across Sydney and surrounding NSW.
Send photos, your claim number if you have one and any insurer correspondence. We will tell you what report you need and the fee.