When a homeowner finds water damage, the first call is often to the insurer. Sometimes the claim is paid. Often it is declined because the damage was gradual, or caused by wear and tear or poor workmanship.
General information only. Policies differ, so read your policy wording and product disclosure statement, and talk to your insurer or broker.
What is usually covered
Many home building policies cover sudden and unexpected damage from water, such as:
- A burst pipe or failed flexi hose.
- Storm damage, such as tiles blown off a roof.
- Resulting damage to ceilings, walls and floors.

What is often excluded
- Gradual leaks: a shower leaking slowly for months.
- Wear and tear: membranes, roofs and seals at the end of their life.
- Defective workmanship or design.
- Rising damp and mould from ongoing moisture.
- The cost of fixing the cause, even where resulting damage is covered.
Common examples
- Leaking shower: usually gradual, so often not covered. See leaking shower repairs.
- Burst pipe in the wall: often covered for resulting damage.
- Roof leaking after a storm: may be covered if the storm caused the damage, not if the roof was already failing. See storm damage repairs.
- Leaking balcony: usually a failed membrane, so often not covered.
New homes and renovations
If the leak is from recent building work, it may be a defect covered by statutory warranties or home building compensation cover. See time limits for claims.
What to do when you find a leak
- Stop the water and make it safe.
- Photograph everything, with dates.
- Notify your insurer promptly, because delay can affect a claim.
- Get the source investigated and a written report.
- Fix the cause, even if insurance declines.
Why fixing the cause matters
Insurers expect homes to be maintained. Fixing leaks early protects your home and avoids claims being declined for neglect. See the cost of delaying repairs.
Strata owners
See does strata insurance cover leaks.
Leak reports and repairs
We find the cause of leaks, provide written reports for insurers and fix the problem properly. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Does home insurance cover a leaking shower?
Usually not, because shower leaks tend to be gradual. Sudden events such as a burst pipe are more likely to be covered. Check your policy.
What does gradual damage mean in insurance?
Damage that happens slowly over time, such as a slow leak, rather than from a sudden event. Many policies exclude it.
Will insurance pay to fix a failed membrane?
Usually not. Membranes at the end of their life are wear and tear. Some resulting damage may be covered depending on the policy.
