Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Commercial Remedial ยท Sydney Commercial buildings, repaired while they keep trading.

Hotels, offices, retail, mixed-use and industrial buildings. We repair concrete, steel, waterproofing and facades with staged programmes, after-hours work and the documentation building owners and managers need.

  • Commercial building remedial
  • Hotels, offices & retail
  • Staged & after-hours works
  • Structural steel & concrete
  • DBP registered BUP4254812
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Commercial remedial building

Defects cost more when buildings are busy.

Commercial buildings carry more people, more load and more risk than houses. When concrete spalls over a footpath, a facade leaks into a tenancy or steel corrodes in a plant room, the cost is not only the repair. It is lost trade, unhappy tenants and liability.

Commercial remedial work needs a builder who can plan around operations. That means staging work floor by floor, working after hours where needed, managing hoardings, traffic and public safety, and keeping owners, managers and tenants informed.

We deliver from an engineer's scope or help you get one, price it line by line, and hand over a documented record of every repair for your asset register and insurers.

Floor propped during commercial structural remedial works
DBPRegistered builder
Is this you?

Common commercial defects

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Spalling over public areas

Concrete cancer on awnings, soffits and slab edges above footpaths, entries and carparks.

Corroded structural steel

Beams, lintels and columns losing section, often found during refurbishments.

Roof and podium leaks

Water through roofs, podiums and planters into tenancies, plant rooms and carparks.

Facade deterioration

Cracked render, fretting brickwork and failed joints letting water into the building envelope.

Carpark deterioration

Cracked slabs, leaking joints and spalling columns in basement and multi-level carparks.

Fire and compliance upgrades

Structural and remedial works needed to support a change of use or compliance upgrade.

Facing a tenancy leak, a defect notice or a pre-purchase report? Send it to us for an itemised response.

Commercial remedial services

Remedial work for commercial buildings.

Hotels, offices, retail, education, mixed-use and industrial buildings across Sydney and NSW.

01

Concrete Cancer Repairs

Slabs, beams, columns, awnings and carparks, with propping and staged work so the building stays open.

02

Structural Steel & Beams

Corroded beams and lintels replaced, new openings formed and structures strengthened to engineering.

03

Roof, Podium & Planter Waterproofing

Membranes replaced and drainage fixed at the source of tenancy and carpark leaks.

04

Facade Repairs

Render, brickwork, sealant joints and cladding repairs to make the envelope weathertight again.

05

Defect Rectification

Itemised rectification of defects from building reports, insurer reports and defect notices.

06

Refurbishment Structural Works

Strip-outs, wall removal, new openings and slab work ahead of fit-outs and change of use.

Recent work

Commercial Remedial projects.

A selection of recent commercial remedial projects across Sydney.

View all projects
Our process

Planned around your building.

Every commercial remedial job follows the same five steps, from diagnosis to documented handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

Repairs your tenants barely notice.

Staged programmes, after-hours work, hoardings and public safety managed by us, with clear notices before disruptive work.

Why choose METCON

Commercial remedial builders Sydney.

We have delivered major remedial and structural works on operating commercial buildings, including a 200-opening structural overhaul of a heritage hotel.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

Excellent communication throughout. Constatine and his team were able to assist us immediately on an urgent government project, improved the plans we already had, and provided multiple options to suit our needs. Highly recommended.
MMish Annandale
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
KLKaren Lawson Bondi Junction
Commercial Remedial FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Can you work after hours on a trading building?

Yes. We regularly stage commercial remedial works floor by floor and after hours so tenants, guests and customers are disrupted as little as possible.

Can you price from our engineer's or building report?

Yes. We price remedial scopes from engineers, building consultants and insurers line by line, and can help you engage an engineer if you do not have a report yet.

Do you handle hoardings, traffic and public safety?

Yes. Where work is above footpaths or roads we arrange hoardings, traffic control and the permits that go with them.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

GuideRemedial Works in Mixed-Use Buildings: Shops Below, Apartments AboveRead the guide GuideEntry Canopy and Awning Repairs for Apartment BuildingsRead the guide GuideRemedial Works in Hotels: Repairing While You Keep TradingRead the guide GuideHotel Bathroom Leaks: Fixing Waterproofing Room by RoomRead the guide GuideRestoring Heritage Hotels and Pubs: Remedial Works Done RightRead the guide GuidePlanned Maintenance for Hotels: Catch Remedial Issues EarlyRead the guide GuideCar Park Traffic Deck Coatings: Waterproofing Strata Car ParksRead the guide GuideCommercial Building Remedial Works: A Guide for Owners and ManagersRead the guide GuideCommercial Property Maintenance: Plan Remedial Works Before EmergenciesRead the guide GuideCarpark Concrete Repairs for Strata and Commercial BuildingsRead the guide GuideRoof Waterproofing: Flat Roofs, Concrete Roofs and RooftopsRead the guide GuideLeaking Office Building? A Guide for Building ManagersRead the guide GuideMixed-Use Buildings: Leaks Between Apartments and ShopsRead the guide GuideStreet Awning Repairs: What Building Owners Should CheckRead the guide GuideCommercial Kitchen Floor Leaks: Waterproofing RestaurantsRead the guide GuideAsbestos in Remedial Works: Older Homes and Strata BuildingsRead the guide GuidePool Deck Leaks in Apartment Buildings: Causes and RepairsRead the guide GuideBalcony Repairs for Hotels and Serviced ApartmentsRead the guide GuideBalcony Repairs on High-Rise Towers: Access and LogisticsRead the guide GuidePenthouse and Roof Terrace Leaks Into Apartments BelowRead the guide GuideCommercial Waterproofing Sydney: Roofs, Podiums, Car ParksRead the guide
Where we work

Commercial remedial works across NSW.

Commercial and mixed-use buildings across Sydney, Newcastle, the Central Coast and regional NSW.

Let's get started

Send us the report or the problem.

An engineer's report, a defect list or a few photos is enough for us to give you a straight answer and an itemised quote.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote