Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Remedial

Penthouse and Roof Terrace Leaks Into Apartments Below

10 November 2026 · 4 min read · By the METCON team

Penthouse terraces and roof terraces sit directly over apartments, with large areas of membrane, planters and drains. A leak can damage the apartment below and lead to disputes between owners.

Common causes

  • Failed membranes at edges, upstands and penetrations.
  • Leaking planters. See planter leaks.
  • Blocked drains and missing overflows.
  • Door sills and level thresholds. See thresholds.
  • Fixings for pergolas, screens and plant.
  • Spas and water features. See spas and heavy loads.
Water staining below a leaking terrace.
Water staining below a leaking terrace.

Finding the leak

Big terraces have many possible sources. Testing one area at a time is the reliable way to isolate it. See leak detection.

Who is responsible?

Terrace waterproofing is often common property, but some terraces are part of the lot or covered by by-laws, especially where owners have made changes. Check the strata plan. See who is responsible.

Repair options

  • Targeted repairs at the failed detail.
  • Re-waterproofing the whole terrace, often with pedestal pavers to protect the new membrane. See pedestal pavers.
  • Rebuilding planters with proper drainage.

Protecting finishes

Penthouse terraces often have expensive finishes. Plan removal, storage and reinstatement carefully.

How fixing it helps

A sound terrace protects the apartment below, keeps the peace between neighbours and protects a premium space.

Terrace leak repairs

We investigate and re-waterproof terraces over apartments. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Why is the penthouse terrace leaking into my apartment?

Common causes are failed membranes at edges and penetrations, leaking planters, blocked drains and door sill details.

Who pays for a leaking penthouse terrace?

It depends on the strata plan and by-laws. Terrace waterproofing is often common property, but not always.

Can a terrace be fixed without removing everything?

Sometimes, if testing finds a specific failure. Widespread failure usually needs full re-waterproofing.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote