Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Building Restoration ยท Sydney Older buildings, restored and strengthened.

Corroded steel, spalling concrete, failing brickwork, tired facades and layouts that no longer work. We restore the structure and fabric of older buildings so they are sound, safe and ready for the next fifty years.

  • Building restoration services
  • Structural steel replacement
  • Concrete cancer repairs
  • Brickwork & facades
  • Residential & commercial
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
What building restoration involves

Structure first, finishes last.

Building restoration is the work of bringing an older building back to sound condition. It is different from a renovation. A renovation changes how a building looks and is used; a restoration deals with what has deteriorated inside it: corroded steel, cracked and spalling concrete, failing brickwork, water damage and past repairs that did not work.

The order matters. We start with the structure: propping, replacing failed beams and lintels, repairing concrete and stabilising masonry. Then we make the building weathertight, and only then move on to finishes. Doing it the other way round means paying twice.

Restoration is also where layouts can be reworked. Old doorways can be infilled, new openings cut with engineered steel over them, and rooms reconfigured, all while the building stays structurally sound.

New steel beam installed during a building restoration
DBPRegistered builder
Is this you?

When a building needs restoration

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Corroded beams or lintels

Rust stains, cracked render or brickwork above openings, or sagging over windows and doors.

Spalling concrete

Cracked or falling concrete with rusting steel showing, especially on slabs, balconies and ceilings.

Fretting brickwork

Bricks and mortar that crumble or wash out, often with salt staining.

Water getting in

Leaks through roofs, facades, windows or balconies that have damaged the structure behind.

Failed past repairs

Patches that keep cracking, sealants that keep failing, and repairs that hid the problem rather than fixing it.

Layout no longer works

Buildings changing use that need walls removed, openings formed and the structure upgraded to suit.

Planning to buy, refurbish or re-use an older building? Talk to us before you commit to a budget.

What we restore

Building restoration, from structure to finish.

We have restored everything from heritage hotels to walk-up apartment blocks and family homes.

01

Structural Steel Replacement

Propping, removal of corroded beams and lintels, and new engineered steel installed into the existing structure.

02

Concrete Cancer & Slab Repairs

Break-out, steel treatment and reinstatement of spalled slabs, beams, columns and ceilings.

03

Brickwork & Masonry

Repointing, brick replacement, crack stitching and infilling old openings in matching brick.

04

Wall Removal & New Openings

Internal walls removed and new openings cut with engineered steel, to reconfigure layouts safely.

05

Facade & Weatherproofing

Render, brickwork, window and roof repairs to stop water getting back into the restored structure.

06

Heritage Fabric

Sandstone, face brick and original details repaired with methods and materials that suit the original building.

Recent work

Building Restoration projects.

A selection of recent building restoration projects across Sydney.

View all projects
Our process

Restored in the right order.

Every restoration follows the same five steps, from diagnosis to documented handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

One builder from strip-out to handover.

Demolition, structural steel, concrete, masonry and finishes under one licensed builder, so nothing falls between trades.

Why choose METCON

Sydney building restoration specialists.

Restoration needs structural knowledge, not just trades. We bring engineers, licences and decades of experience with older buildings.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
We have been undertaking a considerable repair and restoration of our 1850 residence in Darlinghurst. Constatine and his team completed outstanding work, all at a very competitive price. Every deadline was met with no increase to the original quote. Their knowledge, gathered over many years, and their incredible eye for detail significantly improved the final outcome beyond what was originally proposed. I rate them very highly and would recommend them wholeheartedly.
NDNicholas Davie Darlinghurst
Excellent communication throughout. Constatine and his team were able to assist us immediately on an urgent government project, improved the plans we already had, and provided multiple options to suit our needs. Highly recommended.
MMish Annandale
Building Restoration FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

What is the difference between restoration and renovation?

Restoration repairs what has deteriorated in a building, such as corroded steel, spalling concrete and failing masonry, so it is structurally sound again. Renovation changes its look or layout. Many projects need both, and restoration should come first.

Do you work on heritage buildings?

Yes. We restore heritage hotels, terraces and sandstone buildings using methods and materials that suit the original fabric, and work alongside heritage consultants where a building is listed.

Can a building stay occupied during restoration?

Often, yes. We stage work, prop and protect occupied areas and plan noisy work around the people using the building.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Building restoration across Sydney and NSW.

Residential, strata, heritage and commercial buildings across Sydney, the Central Coast, Newcastle and regional NSW.

Let's get started

Tell us about the building.

The address, a few photos and what you want the building to become is enough for us to start.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote