Restumping an Old House in Sydney: Signs, Process and Cost

5 November 2026 · 4 min read · By the METCON team

Many older timber-floored homes around Sydney, including weatherboard cottages and houses in suburbs such as Rozelle, Naremburn and Concord, sit on timber stumps or brick piers. When stumps rot or sink, floors drop. Restumping, also called reblocking, replaces the supports and brings the floor back to a more level position.

Signs you may need restumping

  • Floors that slope, sag or bounce. See sagging floors.
  • Doors and windows that stick.
  • Cracks in plaster, particularly above doors.
  • Gaps between skirtings and floors.
  • Rotted, leaning or sunken stumps when you look underneath.
Temporary propping keeps the structure supported during repairs.
Temporary propping keeps the structure supported during repairs.

Restumping or underpinning?

RestumpingUnderpinning
Replaces stumps supporting timber floorsDeepens or strengthens footings under walls
Common on weatherboard homes and internal floorsCommon on brick walls that have moved

Many brick homes also have timber floors on internal stumps, so one house can need both. See underpinning.

How the process works

  1. Inspection: check stumps, bearers, joists, drainage and any termite damage. An engineer may be required.
  2. Approvals and plan: check for council, heritage or engineering requirements.
  3. Access: through the subfloor, or by lifting floorboards where the space is too tight.
  4. Prop and lift: the floor is supported and gradually lifted with jacks.
  5. New stumps: old supports are replaced with new concrete or steel stumps on suitable footings.
  6. Timber repairs: rotten bearers and joists are replaced.
  7. Finishing: plaster cracks and doors are adjusted once the floor settles.

What affects the cost

  • How many stumps need replacing: part of the home or all of it.
  • Height and access under the house.
  • Whether bearers and joists also need replacing.
  • Soil conditions and footing design.
  • Plaster, plumbing and floor repairs after the lift.
  • Asbestos or hazards under the floor.

Fix the cause at the same time

Stumps usually rot because of damp. Improve drainage and ventilation while you have access, and your new stumps and timbers will last longer. See damp subfloors and musty smells.

How restumping helps your home

  • Level, solid floors, and doors that work properly.
  • Less cracking and fewer ongoing repairs.
  • A sound base for renovations.
  • Fewer concerns in a building report when you sell.

Restumping and subfloor repairs

We inspect, repair and restore older homes across Sydney. Call 0415 840 500 or book a free inspection.

Frequently asked questions

How do I know if my house needs restumping?

Sloping or bouncy floors, sticking doors, cracks in plaster and visibly rotted or sunken stumps are the main signs.

Can you live in a house during restumping?

Often, yes, but it depends on the job. Expect noise, some disruption and a need to take care around lifted floors.

How long do new stumps last?

Concrete and galvanised steel stumps generally last a long time, particularly if drainage and ventilation are good.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote