Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Structural

Underpinning Methods: Mass Concrete, Piers and Screw Piles

11 November 2026 · 4 min read · By the METCON team

Underpinning strengthens or deepens a building's footings when they have moved or can't carry the load. The method depends on the soil, the building, access and the engineer's design.

The main methods

MethodHow it worksOften used for
Mass concreteDigging under footings in short sections and filling with concreteShallow, stable ground below
Bored piersDrilling down to firmer ground and casting concrete piersDeeper firm ground, reactive clay
Screw pilesSteel piles screwed into the ground and connected to footingsTight access, quick installation
Resin injectionExpanding resin injected into ground under footingsSome lighter structures and specific ground conditions
Beam and baseNew beams spanning between piers or basesLarger loads or poor ground
Temporary props during structural work.
Temporary props during structural work.

How engineers choose

  • Soil type and depth to firm ground, often from a geotechnical report.
  • Cause of movement, such as clay, leaks or trees. See clay soils.
  • Building weight and structure.
  • Access, neighbours and services.

Fix the cause first

Many movement problems start with leaking pipes, stormwater or trees. Fixing these may reduce or avoid underpinning. See tree roots.

What to expect

  • Engineer's design and sometimes council approval.
  • Dilapidation reports for neighbours. See dilapidation reports.
  • Work in stages, often while you live in the home.
  • Crack repairs once the building is stable.

See underpinning cost and process and do I need underpinning?

How underpinning helps

The right method stabilises the home, stops cracks returning and protects its value.

Underpinning in Sydney

We underpin homes and buildings to engineers' designs. Call 0415 840 500 or book a free inspection.

Frequently asked questions

What is the best underpinning method?

It depends on the soil, building and access. A structural engineer chooses the method, often with a geotechnical report.

What is the difference between mass concrete and pier underpinning?

Mass concrete deepens footings in sections. Piers drill down to firmer ground deeper below.

Can I stay in my house during underpinning?

Often, yes, as work is usually done in stages from outside or under the house.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote