Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Remedial Waterproofing ยท Sydney Find the leak. Fix it for good.

Water in the wrong place causes most of the building defects we repair. We investigate where it is getting in and install waterproofing that is designed, detailed and built to last.

  • Leak investigation
  • Balcony and podium membranes
  • Basement waterproofing
  • Planter box waterproofing
  • AS 4654.2 compliant
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Remedial waterproofing

Water is behind most defects.

Concrete cancer, rising damp, mould, drummy tiles, stained ceilings and cracked render almost always trace back to water getting somewhere it should not. That is why waterproofing is at the centre of our remedial work.

Remedial waterproofing is harder than new work. The membrane has to tie into existing structures, doors, drains and walls that were not always built with water in mind. The details, not the product, are where most failures happen: upturns, laps, penetrations, outlets and terminations.

We investigate first, then specify the right system for the location: liquid and sheet membranes for balconies and roofs, tanking and drainage for basements and retaining walls, and root-resistant systems for planters. External above-ground membranes are installed to AS 4654.2.

Liquid waterproofing membrane applied before finishes
DBPRegistered builder
Is this you?

Six signs of a waterproofing failure

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Stains and bubbling paint

On ceilings under balconies, roofs and planters, or on walls next to wet areas.

Damp basement walls

Water seeping through basement or retaining walls, especially after heavy rain.

Mould and musty smells

Persistent mould in one area usually means a persistent water source nearby.

White salts on masonry

Efflorescence shows water is moving through the wall and carrying salts out.

Drummy tiles

Tiles lifting or sounding hollow over a membrane that has let water in.

Rust stains on concrete

Water reaching the steel reinforcement, the start of concrete cancer.

Got a leak you cannot find? Tell us where the water shows up and when. That is often enough for us to narrow down the source.

What we waterproof

Waterproofing for every problem area.

Each location needs a different system and different details. We match the membrane to the job, not the other way around.

01

Balconies & Terraces

Full strip and replace, with correct falls, upturns, door waterstops and outlets.

02

Roofs, Podiums & Decks

Trafficable and non-trafficable membranes for concrete roofs and podium slabs over living areas and carparks.

03

Basements & Carparks

Negative and positive side tanking, crack injection and drainage to stop water entering below ground.

04

Retaining Walls

Waterproofing and drainage behind walls that back onto habitable rooms or have started to seep.

05

Planter Boxes

Root-resistant membranes and proper drainage for planters built over slabs and living spaces.

06

Leak Investigation

Water testing and moisture mapping to find the actual entry point before we quote the fix.

Recent work

Waterproofing projects.

A selection of recent waterproofing projects across Sydney.

View all projects
Our process

Investigated. Designed. Sealed.

Every waterproofing job follows the same five steps, from finding the leak to handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

Waterproofing you can see was done right.

Photos of the membrane before it is covered, product data sheets, and flood testing where appropriate. The part that gets covered up is the part we document most.

Why choose METCON

Sydney's remedial waterproofing builders.

Remedial waterproofing is detail work. We get the upturns, laps, outlets and terminations right, because that is where leaks start.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
Excellent communication throughout. Constatine and his team were able to assist us immediately on an urgent government project, improved the plans we already had, and provided multiple options to suit our needs. Highly recommended.
MMish Annandale
Waterproofing FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

What is remedial building?

Remedial building is the repair of defects, damage and deterioration in existing buildings, such as concrete cancer, leaking balconies, failed waterproofing, rising damp and cracked facades. The aim is to fix the underlying cause and restore the building's performance, not just its appearance.

Do I need a DBP registered builder for strata remedial work?

For Class 2 apartment buildings in NSW, remedial work is regulated under the Design and Building Practitioners Act 2020. METCON holds DBP General Unrestricted registration (BUP4254812), so we can carry out that work and lodge the required declarations.

How much does remedial building work cost?

It depends entirely on the defect, its extent, access and the specification. A small concrete cancer patch is very different from a whole-building balcony programme. We inspect for free and provide an itemised written quote so you can see exactly where the money goes.

Is remedial work covered by warranty?

Residential building work in NSW carries statutory warranties under the Home Building Act 1989: six years for major defects and two years for other defects. We provide full documentation at handover.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

GuideConcrete Cancer in Roof Slabs and Top Floor CeilingsRead the guide GuideChoosing Balcony Tiles After RemediationRead the guide GuideHow to Waterproof a Balcony Properly: Step by StepRead the guide GuidePodium and Roof Terrace Waterproofing for Apartment BuildingsRead the guide GuideCan You Waterproof a Balcony Without Removing Tiles?Read the guide GuideRemedial Waterproofing: Finding and Fixing Leaks in BuildingsRead the guide GuideLeaking Lift Pit? Lift Pit Waterproofing for Strata BuildingsRead the guide GuideBasement and Planter Box Waterproofing: Why They Leak and How They Are FixedRead the guide GuideCrack Injection for Leaking Concrete: Epoxy vs PolyurethaneRead the guide GuideGarage Under the House Leaking? Fixing Slab and Driveway LeaksRead the guide GuideWater Seeping Through Sandstone Into Your BasementRead the guide GuideWaterproofing Cost in Sydney: Balconies, Roofs and BathroomsRead the guide GuideCan You Fix a Leaking Shower Without Removing Tiles?Read the guide GuidePool Deck Leaks in Apartment Buildings: Causes and RepairsRead the guide GuideAvoiding Waterproofing Defects: A Developer's GuideRead the guide GuideApartment Building Maintenance Schedule: What to CheckRead the guide GuideNew Apartment Building? The First Two Years for StrataRead the guide GuideBalcony Coatings: Clear Sealers vs Trafficable MembranesRead the guide GuideBalcony Drain Leaks: Outlet and Puddle Flange RepairsRead the guide GuideRainwater Head and Downpipe Overflows: Quick FixesRead the guide GuideBalcony Flood Testing: How It Works and Why It MattersRead the guide GuideBalcony Upstands and Hobs: Why Low Upstands LeakRead the guide GuideBalcony Planter Boxes Leaking Into ApartmentsRead the guide GuideBasement Waterproofing: Tanking vs Drainage SystemsRead the guide GuideCommercial Waterproofing Sydney: Roofs, Podiums, Car ParksRead the guide GuideBasement Car Park Flooding in Apartment BuildingsRead the guide GuideLeaks Around Roof Plant and Penetrations on Apartment RoofsRead the guide GuideSolar Panels on Apartment Roofs: Protecting the WaterproofingRead the guide GuideCourtyard Waterproofing for Ground Floor ApartmentsRead the guide
Where we work

Waterproofing across Sydney.

Apartments, houses, terraces and commercial buildings right across Sydney and surrounding NSW.

Let's get started

Tell us where the water shows up.

Where the leak appears, when it happens and a few photos is usually enough for an initial view. We will book an inspection to confirm the source.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote