Quotes for waterproofing can look very different, and a price per square metre rarely tells you the whole story. On a remedial job, the membrane is often a smaller part of the cost than stripping out, repairing what is underneath and putting everything back.
What affects the cost
- Demolition: removing tiles, screeds and old membranes takes time, and waste must be carried out, often through a lift or down stairs.
- Substrate repairs: cracks, poor falls or concrete cancer must be fixed before a membrane goes on.
- Membrane type: different systems suit different situations. See waterproofing membrane types.
- Details: door sills, drains, balustrade posts and upstands take much of the skill. See door thresholds.
- Access: scaffold, swing stages and working in occupied apartments add cost. See access options.
- Finishes: tiles, screeds, coatings, planters and landscaping may need replacing.
- Testing and paperwork: flood tests, photos, certificates and, for Class 2 buildings, DBP Act requirements.

Costs by area
| Area | What usually drives the price |
|---|---|
| Balcony | Tile removal, falls, door sills, drains and balustrades. See balcony repair cost. |
| Bathroom | Removing the old fit-out, walls, plumbing and new tiling. See bathroom waterproofing. |
| Flat roof | Area, plant and penetrations, and whether old membranes can stay. See flat roofs. |
| Podium or garden | Removing soil, paving and plants, then putting them back. See podium waterproofing. |
| Basement | Whether it can be stopped by injection or needs drainage. See crack injection. |
Why remedial costs more than new work
New work happens on an empty site with clean surfaces. Remedial work happens in a finished building, often with people living there, and hidden damage is common. That is why rates for extra work are important: see scope of works.
Can it be done without removing tiles?
Sometimes, for the right reasons. Coatings and injection can buy time, but they will not fix a bad fall, failed drain or broken slab. See waterproofing without removing tiles.
How to compare quotes
- Check that each quote covers the same scope.
- Check how many membrane coats, what brand, and how details are treated.
- Ask about flood testing, warranties and records.
- Check rates for concrete repairs and other hidden items.
- Check licence and insurance. See checking a builder's licence.
How doing it right saves money
Leaks that come back mean paying again, along with damage below. A proper job protects concrete, ceilings and finishes, and helps avoid disputes with neighbours and owners.
Get an itemised waterproofing quote
We inspect, test where needed and give a clear, itemised quote. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How much does waterproofing cost per square metre?
A rate per square metre can be misleading on remedial work, because demolition, repairs, details, access and finishes make up much of the cost. An itemised quote after inspection is more reliable.
Why is re-waterproofing a balcony so expensive?
Tiles and screed must usually come off, the substrate repaired and details fixed. Then new membrane, tiles and testing follow, often in an occupied building with limited access.
Can I get a warranty on waterproofing?
Ask for details of workmanship and product warranties in writing, and keep flood test records and certificates.