We deliver civil and structural construction across Sydney. From foundation repairs to concrete pours, every job is engineered, compliant, and built to last.
Our civil and structural division handles foundations, load-bearing walls, concrete structures, reinforcement, and remediation. Residential, commercial, and civil, across Sydney and surrounding regions.

Each discipline requires specific knowledge, equipment, and methodology. We cover the full scope of civil and structural work.

Restoring structural integrity to damaged or deteriorated buildings. Cracked walls, failed lintels, concrete cancer, and foundation defects.
Learn more
Foundation stabilisation and strengthening for buildings affected by subsidence, settlement, or increased load requirements.
Learn more
Concrete and steel staircases for residential and commercial projects. Engineered, formed, poured, and finished to BCA/NCC standards.
Learn more
Slabs, footings, columns, beams, walls, driveways, and paths. Proper preparation, formwork, reinforcement, and finishing on every pour.
Learn more
Formwork construction and reinforcement placement for concrete structures. Timber and steel systems built to engineering drawings.
Learn moreTell us about the job. We will visit the site, assess the scope and give you a straight answer, free of charge.
Book a free site visitStructural work demands precision. We work directly with structural and geotechnical engineers to deliver construction that meets Australian Standards and council requirements.
No shortcuts. No guesswork. Every joint, every pour, every connection is sized, specified, and signed off.
Four disciplined stages. Every milestone documented, every handoff signed.
We inspect the site, identify structural concerns, and review your engineering reports or arrange them if needed.
We coordinate with structural and geotechnical engineers, prepare methodology statements, and lodge council applications.
Work executed by experienced crew to engineer specifications and Australian Standards. Progress reported, milestones documented.
Final inspection, defect rectification, and formal handover with engineering certificates, as-built records, and compliance documentation.
A family builder with the licences, insurance and engineering discipline to do the job properly.
We work from structural engineer drawings and specifications. Every detail is followed. No improvising on site.
Fully licensed NSW builder (384697C) with comprehensive insurance and DBP General-Unrestricted registration. We handle the compliance so you do not have to.
We understand Sydney soils, council requirements, and site conditions. That local knowledge makes a measurable difference on every project.
Full records, inspection reports, and certification for every stage. Your engineer and certifier get exactly what they need.
A selection of recent civil & structural works work across Sydney.
View all projects
Real reviews from homeowners, strata and builders.
They handled the DA, the engineer, and the build. We didn't have to chase council once. Massive wall, done in under two weeks.
Council approval sorted, engineering sorted, wall done in a week. Could not fault the process.
We needed a large gabion wall for a steep commercial block. Engineered, certified, and done on time. Professional from start to finish.
Common questions about structural construction, concrete works, underpinning, and remediation in Sydney and NSW.
Structural work in Sydney varies significantly with scope, engineering complexity, and access. A typical concrete slab pour for a residential extension starts around $180 to $280 per m²; full underpinning to a small Sydney terrace usually sits between $25,000 and $80,000 depending on depth, soil type, and the number of piers. Concrete cancer remediation on a single apartment balcony commonly ranges $8,000 to $25,000+. We always provide a free, detailed, written quote, no estimating over the phone for structural work.
Yes, any time you remove or alter a load-bearing wall, change the foundation, add a storey, or make changes that affect the structural integrity of a building, NSW law requires a structural engineer to certify the design. Under the Design & Building Practitioners Act 2020, any "regulated design" for Class 2 buildings (apartments) must be prepared and lodged by a registered practitioner. METCON coordinates with engineers from day one, we can recommend one or work with yours.
Concrete cancer (technically "concrete spalling") occurs when steel reinforcement inside concrete rusts and expands, cracking the concrete from within. It is extremely common in coastal Sydney apartments built in the 1960s to 1990s. Treatment involves: exposing the affected steel, mechanically cleaning it, applying corrosion inhibitor and anti-carbonation coating, replacing lost concrete with engineered repair mortar, and reinstating waterproofing. Properly done, it lasts 20+ years; done poorly, it returns within five.
A typical Sydney underpinning project takes 2 to 6 weeks depending on number of piers, depth required, and site access. Mass concrete underpinning to a small residential wall might take a week; full perimeter underpinning to a two-storey home with screw piles or bored piers can run 4 to 6 weeks. We work in staged sections so structural support is never compromised, and so the home stays occupied throughout in most cases.
It depends on the work. Internal alterations that do not affect external appearance or load-bearing elements can often proceed under Exempt & Complying Development (CDC). Anything affecting structural elements, the building envelope, foundations, or in a heritage zone typically requires a Development Application (DA). METCON handles the lodgement, methodology statements, traffic management plans, and certifier coordination as part of our project management.
Structural works deal with the load-bearing elements of a building, footings, slabs, columns, beams, walls. Civil works deal with the wider site infrastructure, retaining walls, drainage, excavation, earthworks, driveways, paths, and connections to public services. Most real projects involve both. METCON delivers civil and structural together, which removes coordination friction between trades and is usually faster and cheaper than splitting them across two contractors.
Yes. Concrete cancer remediation is one of our core remedial specialties. We work with strata managers and owners corporations across Sydney to scope, engineer, and stage works around occupied apartments, including resident notifications, access scheduling, and dust/noise management. Our DBP General-Unrestricted registration (BUP4254812) clears us for any class of strata building with no height limit.
For civil and structural work, the relevant standards include AS 2159 (piling design and installation), AS 3600 (concrete structures), AS 4100 (steel structures), AS 4678 (earth-retaining structures), and the National Construction Code (NCC/BCA). All work is also Fair Trading and DBP-compliant and is signed off by registered engineers and certifiers.
Tell us what you need. We'll review the scope, coordinate with your engineer, and provide a clear quote, no obligation.
Plain-language guides from our team on the questions we are asked most.