Piers and Piles for Sloping Sites in Sydney

20 November 2026 · 4 min read · By the METCON team

On sloping blocks, filled ground or reactive clay, normal strip footings may not reach soil or rock strong enough to carry the building. Piers and piles take the load down to good ground. They are also used for retaining walls, decks, extensions and underpinning.

Common types

TypeHow it worksSuits
Bored piersDrilled holes filled with reinforced concreteMost residential sites, down to rock or firm clay
Screw pilesSteel shafts with helices screwed into the groundFast installation, light structures, tight access, no concrete curing
CFA pilesContinuous flight auger, concrete pumped as the auger is withdrawnLarger projects and unstable ground
Driven pilesPrecast or steel piles driven inLarger civil works, less common near houses due to vibration

Piling design in Australia follows AS 2159. Your structural and geotechnical engineers choose the type, size and depth.

Why sloping sites need them

  • The downhill side of a building is far above good ground.
  • Fill placed to level the site cannot carry footings on its own.
  • Slopes can creep, so footings must reach stable material.

See types of footings.

Inspection

Pier holes are usually inspected by the engineer before concrete, to confirm the depth and the bearing material. Screw piles are checked by installation torque against the design. Do not pour before the inspection.

Access

Piling rigs come in many sizes. Tight sites may need small rigs or screw piles, which affects cost and program. We check access before pricing.

Pier and pile footings

We install pier and pile footings for houses, retaining walls and extensions on sloping sites. See excavation and footings and civil works. METCON is a licensed NSW builder (384697C) delivering civil works, excavation and retaining walls across Sydney. Call 0415 840 500 or request a quote.

Frequently asked questions

Are screw piles as strong as concrete piers?

Both can be designed for the loads. The engineer chooses based on the ground, the loads and access.

How deep do piers go?

To the founding material in the engineer's design. On Sydney sites that is often sandstone, which can be shallow or deep.

Can piers fix an existing house that is sinking?

Yes, underpinning often uses piers or piles. See our underpinning guides.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote