Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Concrete Cancer ยท Sydney Concrete cancer, fixed at the source.

Rusting reinforcement, cracked and falling concrete, rust stains on balconies and carpark soffits. We remove the damaged concrete, treat the steel and rebuild the section properly, so it does not come back in five years.

  • Concrete cancer specialists
  • Spalling concrete repair
  • Engineer-specified repairs
  • Class 2 strata experience
  • DBP registered BUP4254812
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
What is concrete cancer

Rusting steel, cracking concrete.

Concrete cancer is the everyday name for spalling caused by corroding steel reinforcement. When moisture and salt, or carbonation over many years, reach the steel inside the concrete, the steel rusts and expands. That expansion cracks the concrete from the inside and eventually pushes pieces off the surface.

It is extremely common in Sydney, particularly in coastal suburbs and in apartment buildings from the 1960s to the 1990s, where cover to the steel is often thin and waterproofing has failed. Balcony slab edges, carpark soffits, columns, beams and window heads are the usual places it shows.

Left alone it only gets worse. Every wet season lets more water reach the steel, the section loses strength, and loose concrete becomes a safety risk for anyone below. Treated properly and early, the repair is smaller, cheaper and lasts.

Concrete cancer: spalled ceiling slab above a corroded steel beam
DBPRegistered builder
Is this you?

Six signs of concrete cancer

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Rust stains on concrete

Brown streaks running from cracks or the edge of a slab are often the first sign that steel inside is corroding.

Cracks along the steel line

Straight cracks that follow the line of the reinforcement, especially at slab edges and beams.

Drummy or hollow concrete

Tapping the surface gives a hollow sound where concrete has delaminated from the steel behind it.

Pieces falling off

Chunks of concrete dropping from balconies, soffits or columns. This is a safety issue and needs urgent attention.

Exposed reinforcement

Visible rusted steel bars where the concrete cover has already spalled away.

Leaking balconies above

Failed waterproofing above a slab is one of the main causes. Water in means concrete cancer is not far behind.

Seeing rust stains or loose concrete? Send us a few photos and we will tell you how urgent it is.

What we repair

Concrete cancer repairs for every structure.

From a single balcony edge to a whole carpark, the method is the same: find every affected area, remove the damaged concrete, treat the steel, rebuild and protect.

01

Balcony Slab Edges

The most common location in Sydney apartments. We break out, treat the steel, reinstate the edge and re-waterproof the balcony so it stays dry.

02

Carpark Soffits & Columns

Underside repairs to carpark and basement slabs, beams and columns, with propping and staged work so the carpark can stay in use.

03

Beams, Lintels & Window Heads

Structural elements over openings where corroded steel has cracked the concrete face or rendered finish.

04

Steel Treatment & Replacement

Grit or mechanical cleaning, corrosion inhibitor and primer, and new bars lapped in where section loss is too great.

05

Repair Mortars & Recasting

Polymer-modified repair mortars for smaller areas, formwork and recasting for larger sections, matched to the engineer's specification.

06

Protective Coatings

Anti-carbonation coatings and penetrating sealers to slow future corrosion and extend the life of the whole structure.

Recent work

Concrete Cancer Repair projects.

A selection of recent concrete cancer repair projects across Sydney.

View all projects
Our process

Repaired properly. Not patched.

Every concrete cancer job follows the same five steps, from diagnosis to documented handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

A repair that lasts, with the paperwork to prove it.

Photos of every break-out, steel treatment records, product data and engineer sign-off where required. Exactly what your strata committee, insurer or buyer will ask for.

Why choose METCON

Sydney's concrete cancer specialists.

Concrete cancer repairs fail when the damaged concrete is not fully removed or the steel is not properly treated. We do the part you cannot see properly, because that is the part that matters.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Concrete Cancer Repair FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

What is remedial building?

Remedial building is the repair of defects, damage and deterioration in existing buildings, such as concrete cancer, leaking balconies, failed waterproofing, rising damp and cracked facades. The aim is to fix the underlying cause and restore the building's performance, not just its appearance.

Do I need a DBP registered builder for strata remedial work?

For Class 2 apartment buildings in NSW, remedial work is regulated under the Design and Building Practitioners Act 2020. METCON holds DBP General Unrestricted registration (BUP4254812), so we can carry out that work and lodge the required declarations.

How much does remedial building work cost?

It depends entirely on the defect, its extent, access and the specification. A small concrete cancer patch is very different from a whole-building balcony programme. We inspect for free and provide an itemised written quote so you can see exactly where the money goes.

Is remedial work covered by warranty?

Residential building work in NSW carries statutory warranties under the Home Building Act 1989: six years for major defects and two years for other defects. We provide full documentation at handover.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Concrete cancer repairs across Sydney.

Coastal and harbourside suburbs see the most concrete cancer, but we repair it right across Sydney and surrounding NSW.

Let's get started

Send us photos of the damage.

A few photos of the cracking or rust staining and the location in the building is enough for us to give you an initial view and book an inspection.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote