Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Structural Remediation ยท Sydney Restoring structural integrity.

We diagnose, engineer, and repair structural defects in residential and commercial buildings across Sydney. Concrete cancer, structural cracking, failed lintels, foundation movement, water damage. Proper remediation, not patch jobs.

  • Licensed NSW Builder
  • Engineer-Certified Repairs
  • Concrete Cancer Specialists
  • Underpinning & Foundation Works
  • Structural Crack Repair
  • Carbon Fibre Reinforcement
Talk directly with the builder0415 840 500

Request a free quote

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
When structures fail

Buildings deteriorate. We fix them properly.

Concrete spalls. Steel corrodes. Lintels fail. Cracks open up where they shouldn't. These aren't cosmetic issues, they're structural problems that get worse with time, and they get expensive fast.

METCON carries out structural remediation across Sydney, working with qualified structural engineers to assess damage, develop remediation plans, and execute repairs that restore the building to its required capacity. Every repair is engineered, documented, and certified.

Whether it's a single cracked beam in a Federation home or a full concrete cancer treatment on a commercial strata building, we approach every job the same way: thorough assessment, proper engineering, quality execution.

Heritage sandstone remediation
40+Years on the tools
Is this you?

Six warning signs you should not ignore

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Rust stains seeping from concrete

A clear sign reinforcing steel is corroding inside the slab or column.

Cracks wider than a $2 coin (3mm+)

Anything beyond hairline cracking usually points to structural movement or load issues.

Cracks above doors or windows

Often indicates a failed or undersized lintel that needs engineered replacement.

Spalling, flaking or "popping" concrete

Classic early symptom of concrete cancer, gets worse and more expensive the longer it is left.

Doors and windows that suddenly stick

Frame distortion is one of the first signs of foundation movement.

Damp patches on internal walls

Water ingress compromises steel and timber structure, a structural risk, not just cosmetic.

Spot one of these in your building? Send us a photo, we'll tell you whether it's something to monitor or fix now.

What we remediate

The full range of structural defects.

Whatever the defect, the approach is the same, diagnose the cause, engineer the solution, execute and certify the repair.

01

Concrete Cancer

Spalling concrete caused by corroding reinforcement. We remove affected concrete, treat or replace steel, and apply protective coatings and engineered repair mortars to structural specifications.

02

Structural Cracking

Cracks in load-bearing walls, beams and columns from movement, overload or settlement. We assess root cause and execute engineered repairs, crack injection, stitching, carbon fibre reinforcement.

03

Failed Lintels

Deteriorated or undersized lintels above door and window openings. We design and install engineered replacement lintels with proper bearing, propping and load transfer.

04

Foundation Defects

Cracked or shifted foundations from reactive soils, drainage failure or tree root activity. We coordinate geotechnical and structural engineers to deliver the right underpinning method.

05

Structural Water Damage

Prolonged water ingress compromises steel reinforcement and timber members. We address the structural damage and coordinate waterproofing to prevent recurrence.

06

Load-Bearing Wall Repairs

Damaged or deteriorated load-bearing walls requiring temporary propping, demolition and engineered reconstruction. Compliant with NCC and engineer-stamped drawings.

Recent work

Structural Remediation projects.

A selection of recent structural remediation projects across Sydney.

View all projects
Our process

No guesswork. No improvising.

Every remediation project follows the same structured five-step process. Engineer-led, fully documented, and signed off in writing.

Site Inspection

We attend site, inspect the structure, document the defects with photos and measurements, and identify the most likely cause. This becomes the brief for the structural engineer.

Engineering Assessment

A qualified structural engineer reviews the inspection findings and produces a remediation specification. This document defines exactly what needs to be done and how.

Remediation Plan

We develop a detailed scope of works from the engineering specification, methodology, staging, temporary support requirements, materials, and a clear, itemised quote.

Execution On Site

Our team carries out the remediation to the engineer's specification. Work is documented at every stage with photos and inspection records you can rely on.

Certification & Handover

On completion, the structural engineer inspects and certifies the work. You receive full documentation for your records, strata reports, council, or insurance.

A full paper trail, not just a fixed building.

Inspection reports, engineer specifications, photos at every stage, and certification on completion. Useful for strata, council, insurance and resale.

Why choose METCON

Sydney's structural remediation specialists.

Most builders patch what's visible. We fix what's actually wrong. Every remediation project is engineer-led, documented end-to-end, and certified on completion, so the problem stays solved.

Engineer-Led

Every job is designed and signed off by a qualified structural engineer.

Documented

Photos, inspection notes, and certifications you can hand to strata, council or insurer.

Licensed Builder

Meteora Constructions Pty Ltd, fully licensed in NSW with all required insurances.

Honest Quoting

Itemised, fixed-price quotes. No surprise variations halfway through the job.

Strata-Friendly

Familiar with Owners Corporation requirements, committee approvals and reporting.

40+ Years Experience

Hands-on Sydney building experience going back to the 1970s.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

They handled the DA, the engineer, and the build. We didn't have to chase council once. Massive wall, done in under two weeks.
MSMichael Stavros Vaucluse
Council approval sorted, engineering sorted, wall done in a week. Could not fault the process.
DRDavid Reeves Manly
We needed a large gabion wall for a steep commercial block. Engineered, certified, and done on time. Professional from start to finish.
AMAnthony Moretti Parramatta
Structural Remediation FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Do you handle council approvals and engineering?

Yes. We manage the entire process, including:

  • Coordinating with structural engineers
  • Preparing documentation
  • Lodging Development Applications or Complying Development Certificates
  • Liaising with council on your behalf

You do not need to deal with council directly. We handle it all.

What is included in your quotes?

Every METCON quote is fully itemised and includes:

  • Scope of work
  • Materials and specifications
  • Labour costs
  • Excavation and site preparation
  • Drainage (where applicable)
  • Engineering fees
  • Council application fees
  • Project timeline and payment schedule

There are no hidden costs. What we quote is what you pay, unless you request changes to the scope.

What payment terms do you offer?

We use a progress payment structure, which means you pay in stages as the work is completed. This is standard practice in the NSW building industry and protects both parties.

The exact payment schedule depends on the project size and is set out clearly in your quote. We never ask for full payment upfront.

What happens if something goes wrong during the build?

Construction can sometimes uncover unexpected issues, especially on older properties or difficult sites.

If we find something outside the original scope, such as hidden asbestos, unstable soil or structural defects, we tell you immediately, explain the options and give you a clear cost for any additional work before proceeding.

You are never hit with surprise bills.

Other civil & structural services

More civil & structural services.

We cover the full scope of civil & structural work with one licensed team.

Back to Civil & Structural
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Sydney-wide structural remediation services.

We service all of Sydney and surrounding regions across NSW, from beachside strata buildings to inner-city heritage homes and outer-west commercial sites.

MosmanManlyCremorneLane CoveChatswoodHornsbyParramattaStrathfieldBurwoodConcordHunters HillDrummoyneFive DockLeichhardtNewtownSurry HillsPaddingtonBondiRandwickCoogeeMaroubraSutherlandHurstvilleKogarahCronullaEngadinePenrithLiverpoolCampbelltownWollongongCentral Coast+ Greater Sydney
Let's get started

Send us some photos.

We'll assess the situation, advise on next steps, and tell you honestly whether you need a full structural engineer report or just a minor repair. No pressure, no sales pitch, straight talk from people who actually build.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote