Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Sydney builders since the 1970s Residential.
Remedial.
Commercial.

From home renovations to multi-million dollar builds, one licensed Sydney team. You deal directly with the director, from first site visit to final handover.

  • Licensed and fully insured
  • DBP General Unrestricted
  • Free site assessments
40+
Years of hands-on building experience
3
Generations of builders in the family
$20M
Public liability insurance cover
$0
Site visit and detailed quotation
What we build

Construction services across Sydney

From engineered retaining walls to full structural remediation, one licensed team handles the whole job. No subbing out the hard parts.

View all services
METCON team reviewing a heritage sandstone site with the client
40+ Years on the tools
Why METCON

Why Sydney clients choose us

A family builder with the licences, insurance and engineering discipline to take on the jobs other builders avoid.

General Unrestricted DBP

BUP4254812. Approved for all building classes with no project limitations.

Licensed and fully insured

Builder 384697C, Demolition AD214430, $20M public liability and iCare/HBCF cover.

Structural expertise

Over 40 years across residential, commercial, strata and civil work. We understand load paths and concrete.

Proper documentation

Compliance paperwork, engineering sign-offs, progress reports and transparent cost tracking.

Direct communication

You deal with the director and the tradespeople. One point of contact, clear accountability.

Free detailed quotes

We visit your site and give you a straight answer on cost and timeline. No obligation.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders. Read more reviews

I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
LCLisa Chen Randwick
They handled the DA, the engineer, and the build. We didn't have to chase council once. Massive wall, done in under two weeks.
MSMichael Stavros Vaucluse
We're a strata block and needed a retaining wall replaced urgently. METCON moved fast, communicated well, and the residents are very happy.
PSPriya Sharma North Sydney

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

About the company

Three generations of trade

METCON (Meteora Constructions Pty Ltd) is a Sydney-based construction company with over 40 years of hands-on building experience. We bring engineering discipline to every project: structural, remedial, residential and commercial. You deal directly with the director and the tradespeople.

We hold multi-discipline capability across structural, demolition, excavation and construction, providing single-source responsibility for the full scope of work.

Since the 1970s
Building in Sydney
About us
Three generations of METCON builders on site
Constantine Hassiotis, Director of Meteora Constructions
From the director

Built to spec.

I started building alongside my father in the 1970s. That is where I learned there are no shortcuts to quality construction. Every foundation, every pour, every steel connection. It either meets the specification or it does not.

When I founded METCON, I wanted a company that operates the same way I have always worked: correct engineering, clear communication, accountability at every stage. No project managers relaying messages. No ambiguity.

Whether it is a complex strata remediation programme or a residential extension, we bring the same discipline. The same documentation. The same commitment to getting it right from the very first time.

Con Hassiotis Director, Meteora Constructions
How we work

Our process

Five clear stages, no surprises. You know exactly what happens next and who is responsible.

Site inspection

We inspect the site, assess conditions and review engineering reports and council requirements before quoting.

Quotation

A detailed quote with a clear scope of works, methodology and timeline. Every line item defined upfront.

Engineering

We coordinate with structural engineers and prepare documentation, council applications and compliance submissions.

Execution

Experienced crew build to engineer specifications and Australian Standards, with progress documented at each milestone.

Handover

Final inspections, defect rectification, clean-up and formal handover with all compliance certificates.

One point of contact. Every project is run by the director and a dedicated site supervisor.

Licences and registration

Check us before you hire us.

Every licence and registration we hold is public. Verify them yourself on the NSW Government register before you sign anything.

Strata · Apartments · Multi-residential · Commercial · Mixed-use

Verify our licence on the NSW Government register →
Principal Contractor
Meteora Constructions Pty Ltd
Builder Licence384697C
DBP RegistrationBUP4254812 (General, Unrestricted)
PractitionerConstantine Hassiotis
Valid18 Mar 2026 to 17 Mar 2029
Demolition LicenceAD214430
Public Liability$20M
Contact0415 840 500
ABN 89 151 074 421
Get in touch

Let's talk about your project.

"We visit the site, assess the scope, and give you a straight answer. No obligation, no runaround."

Con Hassiotis, Director
Call the builder0415 840 500 Emailinfo@meteoraconstructions.com.au
Service areaSydney and surrounding regions, NSW
HoursMonday to Sunday, 7am to 7pm
Call now Free Quote