Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Excavation & Footings ยท Sydney Where every build begins.

We excavate, form, and pour footings for retaining walls, buildings, and civil structures across Sydney. Proper site preparation, engineered footings. The foundation your project needs to stand on.

  • Licensed NSW Builder
  • Site Excavation Specialists
  • Strip & Pad Footings
  • Retaining Wall Foundations
  • Engineer-Certified Works
  • Rock Excavation
Talk directly with the builder0415 840 500

Free excavation quote

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Getting the ground right

Everything above ground depends on what's below.

Skip the site preparation and you pay for it later. Insufficient excavation, poor compaction, wrong footing depth, inadequate drainage, these are the problems that show up as cracked walls, leaning retaining structures, and settling buildings. Foundations don't fail visibly until the damage is done.

METCON carries out excavation and footing works across Sydney for retaining walls, residential builds, and civil projects. We work from engineer's specifications with proper survey control, documented hold points, and quality materials. Every footing is engineered, inspected, and certified.

From a simple strip footing for a garden retaining wall to deep rock excavation for a multi-level basement, we bring proper planning, the right equipment, and experienced operators to every job.

Excavated trench and footing alongside a new retaining wall
DoneRight underneath
Is this you?

Six situations that need professional excavation

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Retaining wall construction on a slope

Retaining walls need engineered footings at the right depth, with proper drainage behind and below.

New build on reactive or unstable soils

Clay soils, fill, or soft ground require deeper footings and sometimes ground improvement before building.

Rock encountered during excavation

Sydney sandstone and shale need the right equipment and techniques, standard excavators won't cut it.

Council or engineer requiring inspections

Most building work requires footing inspections at hold points before concrete is placed.

Sloping or terraced site requiring cut and fill

Level pads, benched cuts, and controlled fill placement need experienced operators working to survey levels.

Drainage and services coordination

Stormwater, sewer, and utility trenching often runs alongside footing works and needs coordinated excavation.

Got a site that needs excavation? Send us the plans, we'll give you a clear scope and competitive quote.

What we deliver

Excavation & footings for every project.

From simple trench footings to complex multi-level excavations, we handle the full range of groundworks.

01

Site Excavation

Bulk excavation, cut and fill, bench cutting, and level pad preparation. GPS-controlled machine work to survey levels with documented compaction testing.

02

Strip Footings

Continuous strip footings for retaining walls, boundary walls, and building perimeters. Excavated, formed, and poured to engineer's specification.

03

Pad Footings

Individual pad footings for posts, columns, and point loads. Sized and reinforced per structural design with documented depth and bearing verification.

04

Pier & Bored Footings

Drilled pier footings for deep foundations, steep sites, and areas with limited access. Machine-bored or hand-dug to engineer's specification.

05

Rock Excavation

Sydney sandstone and shale excavation using hydraulic hammers, rock saws, and controlled methods. Clean faces for retaining walls and basement construction.

06

Drainage & Subsoil Works

Ag drains, subsoil drainage, sump pits, and stormwater connections. Coordinated with footing works for a complete below-ground solution.

Recent work

Groundwork we've done.

A selection of recent excavation and footing works across Sydney.

View all projects
Our process

Dig right. Build right.

Every excavation and footing project follows our structured five-step process. No guesswork, just proper planning and execution.

Site Survey

We survey the site, confirm levels, locate services, assess soil conditions, and identify access and staging requirements before any digging starts.

Engineering Review

We review the structural and geotechnical engineer's specifications for footing type, depth, reinforcement, and any ground improvement requirements.

Excavation

Our operators excavate to the specified levels using appropriate equipment for the ground conditions. Depths are verified and documented at hold points.

Forming & Pouring

Footings are formed, reinforcement is placed per the bar schedule, and concrete is poured to specification. Inspected before every pour.

Inspection & Certification

Engineer inspects completed footings before backfill or construction proceeds. You receive full documentation and certification.

Solid foundations, with full documentation.

Compaction test results, footing inspection records, pour documentation, and engineer certification. Everything your certifier and council need.

Why choose METCON

Sydney's excavation & footing specialists.

The difference between a good build and a bad one usually starts underground. We get the ground right first. Every excavation is controlled, every footing is engineered, and everything is documented.

Engineer-Certified

Every footing is designed and signed off by a qualified structural engineer.

Right Equipment

From mini excavators to 20-tonne machines and rock breakers, the right tool for the site.

Licensed Builder

Meteora Constructions Pty Ltd, fully licensed in NSW with all required insurances.

Survey Controlled

All excavation to survey levels with documented depth and compaction verification.

Services Aware

Dial Before You Dig, potholing, and careful excavation around existing services.

40+ Years Experience

Hands-on Sydney building experience going back to the 1970s.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

We're a strata block and needed a retaining wall replaced urgently. METCON moved fast, communicated well, and the residents are very happy.
PSPriya Sharma North Sydney
We needed a large gabion wall for a steep commercial block. Engineered, certified, and done on time. Professional from start to finish.
AMAnthony Moretti Parramatta
I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
LCLisa Chen Randwick
Excavation & Footings FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Do I need council approval for this wall?

It depends on the height and location. As a general guide in NSW:

Under 600mmUsually exempt, no approval required.
600mm to 900mmMay need a CDC or DA, depending on your council.
Over 900mmAlmost always a DA, engineering drawings and possibly a geotechnical report.

We check your council's rules and handle the application for you.

Do I need drainage behind the wall?

In almost every case, yes. Poor drainage is the number one cause of retaining wall failure. We install ag-drainage, gravel backfill and weep holes as standard on every wall.

Do you remove the soil from site?

Yes. We arrange machinery, spoil removal and disposal as part of the job, and any fill is compacted in controlled layers to engineer specifications.

How long does it take to build?

A standard residential wall typically takes 3 to 10 working days, depending on length, height, access and whether excavation or engineering is involved. Walls that need council approval can add 4 to 8 weeks for the approval process.

Other wall types

Compare other walls.

Not sure this is the right wall for your site? Compare the other systems we build, or ask the builder.

Back to Retaining Walls
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Sydney-wide excavation & footing services.

We service all of Sydney and surrounding regions, from tight inner-city sites to large suburban and semi-rural projects.

MosmanManlyCremorneLane CoveChatswoodHornsbyParramattaStrathfieldBurwoodConcordHunters HillDrummoyneFive DockLeichhardtNewtownSurry HillsPaddingtonBondiRandwickCoogeeMaroubraSutherlandHurstvilleKogarahCronullaEngadinePenrithLiverpoolCampbelltownWollongongCentral Coast+ Greater Sydney
Let's get started

Send us the plans.

Whether it's a retaining wall footing, a building slab, or a full site excavation, send us the plans and we'll give you a clear, itemised quote. Honest pricing from experienced builders.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote