Piled Retaining Walls for Basements: Secant, Contiguous, Soldier

23 November 2026 · 4 min read · By the METCON team

Digging a basement or deep driveway cut right next to a boundary, footpath or neighbour's house is one of the riskiest parts of a Sydney project. In soils, the ground must be supported before excavation goes down. Piled retaining walls are the usual answer.

Soldier pile walls

Steel or concrete piles are installed at spacings along the line of the wall. As the excavation goes down, the gaps between them are filled with infill panels, timber lagging or shotcrete. They are economical where ground water is low and soils can stand briefly between piles.

Contiguous pile walls

Bored concrete piles are drilled close together in a line, with small gaps between them. The gaps are usually sealed with shotcrete as the excavation proceeds. Good for soils with limited water.

Secant pile walls

Piles overlap each other, forming a continuous wall. Softer "female" piles are drilled first, then "male" reinforced piles are drilled cutting into them. Secant walls control groundwater better and suit wet sites near creeks, harbour or sandy soils.

Support for the wall

Piled walls may be cantilevered for shallow cuts, but deeper walls usually need temporary ground anchors or props until the basement floors and slabs are built to brace them permanently. See anchors.

Protecting the neighbours

  • A dilapidation report on neighbouring properties before work. See dilapidation reports.
  • Monitoring for movement and vibration during piling and excavation.
  • Neighbour consent for any anchors under their land.

Design

The choice between types comes from the geotechnical report, groundwater, depth, nearby structures and cost. See excavation near boundaries.

Basement and boundary excavation

We deliver excavation and retention works with specialist piling partners, to the engineer's design. See excavation. METCON is a licensed NSW builder (384697C) delivering civil works, excavation and retaining walls across Sydney. Call 0415 840 500 or request a quote.

Frequently asked questions

Which piled wall is cheapest?

Usually soldier piles, then contiguous, then secant. The ground and groundwater decide what is suitable.

Do piled walls stay in permanently?

Usually yes. They often form part of the permanent basement wall, sometimes with a lining in front.

Will piling damage my neighbour's house?

Properly designed and monitored work keeps risk low. Dilapidation reports record the condition before and after.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote