Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Concrete & Steel Works ยท Sydney The heavy structure specialists.

We fabricate, erect, and construct concrete and steel structures for commercial and industrial projects across Sydney. Frames, slabs, columns, beams, and connections. Structural capability for serious construction.

  • Licensed NSW Builder
  • Structural Steel Erection
  • Reinforced Concrete Construction
  • Commercial & Industrial
  • Engineer-Specified Works
  • Welding & Bolted Connections
Talk directly with the builder0415 840 500

Request a free quote

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Commercial-grade structure

Concrete and steel are what buildings stand on.

Commercial and industrial construction demands structural capability that residential builders can't provide. Heavier loads, longer spans, tighter tolerances, and strict documentation requirements. This is where construction meets engineering, and both need to be right.

METCON delivers concrete and steel structural works for commercial builders, developers, and industrial clients. We work from engineer's drawings with qualified formworkers, steel fixers, riggers, and welders. Every element is built to specification and documented.

Whether it's a structural steel frame for a commercial fitout, a reinforced concrete slab for a warehouse, or a complete structure for a new building, we bring the heavy structural capability to your project.

Commercial rooftop concrete and steel works
40+Years on the tools
Is this you?

Six projects that need concrete & steel specialists

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Commercial building structural frame

Steel or concrete structural frames for new commercial buildings need specialist erection and construction capability.

Industrial slab or hardstand construction

Heavy-duty slabs for warehouses, workshops, and hardstands require specific mix designs, reinforcement, and joint details.

Structural steel installation in existing building

Adding steel beams, columns, or bracing inside an existing building needs precision fabrication and careful installation.

Suspended concrete floors or decks

Formwork, propping, and reinforcement for suspended slabs in multi-level commercial construction.

Loading docks, ramps, and access structures

Heavy-duty concrete and steel structures designed for vehicle and equipment loads with specific durability requirements.

Crane bases, equipment pads, and foundations

Engineered concrete foundations for cranes, heavy equipment, and industrial plant with specific load and vibration criteria.

Got a commercial structural project? Send us the drawings and we'll price the concrete and steel works.

What we build

Concrete & steel for commercial projects.

From individual structural elements to complete building structures, we handle every type of commercial concrete and steel work.

01

Structural Steel Frames

Fabrication and erection of structural steel frames for commercial buildings. Columns, beams, bracing, purlins, and connections per engineer's specification.

02

Reinforced Concrete Structures

Formwork, steel fixing, and concrete placement for commercial structures. Slabs, walls, columns, beams, and transfer structures built to engineering standard.

03

Suspended Slabs & Decks

Propped formwork, post-tensioned, and composite metal deck systems for suspended commercial floors. Full documentation and hold-point inspections.

04

Retaining & Basement Walls

Commercial retaining walls and basement construction in reinforced concrete. Waterproofing, drainage, and structural certification included.

05

Industrial Slabs & Hardstands

Heavy-duty concrete slabs for warehouses, workshops, loading areas, and industrial hardstands. Specific mix designs, joints, and surface finishes.

06

Connections & Welding

Structural steel connections, site welding, and bolted assemblies. Qualified welders, inspection and testing, and documented compliance.

Recent work

Concrete & Steel Works projects.

A selection of recent concrete & steel works projects across Sydney.

View all projects
Our process

From drawings to structure.

Every concrete and steel project follows our structured five-step process. Built from engineer's drawings with full documentation and quality control.

Drawing Review & Planning

We review the structural engineer's drawings, connection details, and specifications. Construction methodology, lifting plans, and staging developed before we start.

Material Procurement

Steel fabrication, concrete mix designs, reinforcement supply, and material certification coordinated. Everything verified against the specification before delivery.

Construction

Structural works executed per the engineer's specification. Formwork, steel fixing, erection, welding, and concrete placement. Hold points inspected and documented.

Testing & Inspection

Concrete testing, weld inspection, bolt tensioning verification, and dimensional checks. All documentation compiled for the engineer and certifier.

Engineer Certification

Structural engineer inspects and certifies the completed works. Full documentation package provided for BCA compliance and building certification.

Commercial structure, built and certified to spec.

Material certificates, test results, inspection records, and engineer certification. Everything the certifier, council, and client need.

Why choose METCON

Sydney's concrete & steel specialists.

Commercial structural work needs builders who understand engineering drawings and work to tolerances measured in millimetres. That's our core capability.

Structural Specialists

Concrete and steel structural construction is our primary trade, not a sideline to residential work.

Qualified Trades

Formworkers, steel fixers, riggers, and qualified welders. Trade-specific skills for structural construction.

Licensed Builder

Meteora Constructions Pty Ltd, fully licensed in NSW with all required insurances.

Documentation

Full QA documentation, material certificates, test results, and inspection records on every project.

Commercial Capacity

Equipment, labour, and project management capability for commercial-scale structural works.

40+ Years Experience

Hands-on Sydney building experience going back to the 1970s.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

We needed a large gabion wall for a steep commercial block. Engineered, certified, and done on time. Professional from start to finish.
AMAnthony Moretti Parramatta
We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
KLKaren Lawson Bondi Junction
I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
LCLisa Chen Randwick
Concrete & Steel Works FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Do you handle council approvals and engineering?

Yes. We manage the entire process, including:

  • Coordinating with structural engineers
  • Preparing documentation
  • Lodging Development Applications or Complying Development Certificates
  • Liaising with council on your behalf

You do not need to deal with council directly. We handle it all.

What is included in your quotes?

Every METCON quote is fully itemised and includes:

  • Scope of work
  • Materials and specifications
  • Labour costs
  • Excavation and site preparation
  • Drainage (where applicable)
  • Engineering fees
  • Council application fees
  • Project timeline and payment schedule

There are no hidden costs. What we quote is what you pay, unless you request changes to the scope.

What payment terms do you offer?

We use a progress payment structure, which means you pay in stages as the work is completed. This is standard practice in the NSW building industry and protects both parties.

The exact payment schedule depends on the project size and is set out clearly in your quote. We never ask for full payment upfront.

What happens if something goes wrong during the build?

Construction can sometimes uncover unexpected issues, especially on older properties or difficult sites.

If we find something outside the original scope, such as hidden asbestos, unstable soil or structural defects, we tell you immediately, explain the options and give you a clear cost for any additional work before proceeding.

You are never hit with surprise bills.

Other commercial services

More commercial services.

We cover the full scope of commercial work with one licensed team.

Back to Commercial Construction
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Sydney-wide concrete & steel services.

We deliver commercial concrete and steel works across Sydney and greater NSW, for builders, developers, and industrial clients.

MosmanManlyCremorneLane CoveChatswoodHornsbyParramattaStrathfieldBurwoodConcordHunters HillDrummoyneFive DockLeichhardtNewtownSurry HillsPaddingtonBondiRandwickCoogeeMaroubraSutherlandHurstvilleKogarahCronullaEngadinePenrithLiverpoolCampbelltownWollongongCentral Coast+ Greater Sydney
Let's get started

Send us the drawings.

Structural drawings, specifications, and project timeline. We'll price the concrete and steel works, confirm methodology, and give you a clear programme. Structural specialists who deliver.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote