If you are taking a builder to NCAT, or defending a claim, the expert report usually decides the case. We inspect the work, set out each defect with our reasons, and cost the rectification line by line, written to the Tribunal's expert evidence rules.
In a home building dispute, the Tribunal member is not a builder. They rely on expert evidence to decide whether work is defective or incomplete, what caused it, what is needed to fix it and what that will cost. A complaint letter, a handful of photos or a quote with one lump sum figure rarely carries much weight.
For Home Building Act claims over $30,000, NCAT Procedural Direction 3 applies. It sets a code of conduct for experts and says what a report must contain: the expert's qualifications, the instructions and documents relied on, the facts and assumptions, the reasons for each opinion, and an acknowledgement that the expert has read the code and agrees to be bound by it. Where rectification is recommended, the report must also give the scope of work, the likely cost and how that cost was calculated.
An expert's duty is to the Tribunal, not to the person paying for the report. That is exactly what makes a well-prepared report persuasive. We give an honest, reasoned opinion on each item, including the ones that are not defects, so the report holds up when the other side's expert reads it.

If any of these sound familiar, it is worth a call. We will tell you which report or quotation will help, and confirm a fixed fee before we start.
You have raised defects in writing and the builder has refused, ignored you or disputes that anything is wrong.
NCAT expects applicants to have their expert reports ready before they lodge, not after.
You are a homeowner defending a payment claim and need evidence of defective or incomplete work.
You need an independent view of the alleged defects and a fair cost of any genuine rectification.
You have a deadline to file expert evidence, a Scott Schedule or a joint report.
A Fair Trading inspection or mediation did not settle the dispute and the next step is the Tribunal.
Have a hearing date or a direction to file evidence? Call us now with the date and we will tell you what can be done in the time.
Each report is set out so a member can follow every item from the photo, to the opinion, to the scope, to the cost.
Acknowledgement of the NCAT experts' code, our qualifications, any relationship with the parties and the instructions we were given.
Each defect numbered, located, photographed and described, with the standard, plan or contract term it fails to meet.
Why the defect exists and how we reached our view, including any tests, readings or assumptions we relied on.
The work needed to fix each item properly, and whether a reasonable alternative remedy exists.
A fixed-price costing for each item at current Sydney rates, with preliminaries, margin and GST shown.
Items and costs laid out so they drop straight into a Scott Schedule if the Tribunal directs one.
Every NCAT report follows the same five steps, with the fee fixed before we start.
Tell us what the report is for and send the contract, plans, photos, correspondence and any Tribunal directions. We confirm the scope, timing and a fixed fee in writing before we attend.
We inspect, measure and photograph every item, take moisture readings and carry out non-destructive checks where they help. Each item is numbered and located.
Each item is assessed against the contract, the approved plans, the National Construction Code, Australian Standards and the manufacturer's instructions, and we identify the cause, not just the symptom.
You receive a written report with our opinion and reasons for each item, the scope of work to fix it and an itemised, fixed-price costing that shows how every figure was calculated.
We answer questions, prepare supplementary reports if new information comes to light, and attend an expert conclave, joint report or hearing when directed, with those fees agreed in advance.
Reports that overstate defects get picked apart in a conclave. We give a reasoned opinion on every item, so what is left standing is solid.
We are licensed builders who fix defects for a living, so we know how defects happen, what it really takes to fix them and what that costs in Sydney today.
We have built and repaired buildings in Sydney for over 40 years, so our scopes are buildable and our costs come from what the work really takes.
Builder licence 384697C and DBP General Unrestricted registration BUP4254812, including Class 2 apartment buildings.
Reports follow the structure NCAT and the courts expect: instructions, facts and assumptions, reasons for each opinion and the code of conduct acknowledgement.
You know the cost of the inspection and report before we attend. No hourly meter running in the background.
Every item is scoped and priced separately, with preliminaries, access, waste, supervision, margin and GST shown, so the numbers stand up to scrutiny.
Dated photos, measurements, readings and references to the relevant standards for every item, laid out so a member or judge can follow it.
Real reviews from METCON clients.
We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
Excellent communication throughout. Constatine and his team were able to assist us immediately on an urgent government project, improved the plans we already had, and provided multiple options to suit our needs. Highly recommended.
Straight answers. Anything else, just ask.
For most defect claims, yes. NCAT expects applicants to have their expert reports before they lodge, and for Home Building Act claims over $30,000, expert evidence must follow Procedural Direction 3. Without an expert report, it is hard to prove what is defective and what it will cost to fix.
It is NCAT's direction on expert evidence. It includes a code of conduct for experts and lists what a report must include, such as the expert's qualifications, the instructions, the facts and assumptions, the reasons for each opinion and, for building work, the scope and likely cost of any recommended rectification.
Yes. When we act as an expert, our duty is to the Tribunal or court, not to the person who engaged us, and we say so in the report. We disclose any relationship with the parties and whether we have been asked to quote for the rectification work, as the expert code of conduct requires.
It depends on the size of the property, the number of items and what the report is for. We confirm a fixed fee in writing before we attend, based on your documents and a short call, so there are no surprises.
Yes, when the Tribunal or court directs it or you ask us to. Attendance, joint reports and conclaves are quoted separately and agreed in advance.
Most disputes need more than one document: a defect report, a costing, a Scott Schedule and sometimes a hearing. We can prepare them all from one inspection.
Back to Inspections & ReportsPlain-language guides from our team on the questions we are asked most.
Houses, terraces, townhouses and apartment buildings across Sydney and surrounding NSW.
Send the contract, photos, any defect list and your Tribunal directions or hearing date. We will confirm what report you need and a fixed fee.