The first question most owners ask about a building expert report is what it will cost. The honest answer is that it depends on the job, but you should never have to guess. A good expert will tell you the fee before they set foot on site, and hold to it.
What decides the fee
- The size of the property. A single bathroom is quicker to inspect and report on than a whole house, and a house is quicker than an apartment building.
- The number of defects. Each defect needs to be located, photographed, explained and costed. Thirty items take longer than five.
- The documents to review. Contracts, plans, specifications, variations, certificates and correspondence all have to be read. The more there is, the more time it takes.
- What the report is for. A report for NCAT over $30,000 or for a court must follow formal expert evidence rules. A report to guide a negotiation can be simpler.
- Whether costing is included. An itemised, fixed-price rectification quote adds value and time. It is often what wins or settles the case.
- Testing or opening up. Flood tests, moisture mapping or removing a tile to see the membrane may be needed to prove a cause.
- The deadline. A report needed for a hearing next week has to be prioritised.

Why a fixed fee matters
Hourly billing on an open-ended brief can run well past what you expected, especially if the other side responds and your expert has to reply. The fee is fixed and agreed in writing before the inspection, so you know the cost of the report before you commit. If the brief changes later, for example a conclave or a supplementary report is ordered, a good expert quotes that separately before doing it.
What you get for the fee
- A site inspection by a licensed builder.
- A photo log with each defect located on a plan or room list.
- For each item: what is wrong, why it is defective, how to fix it and what it costs.
- A total rectification figure you can put to the builder, insurer or Tribunal.
- Formal declarations where the report is for NCAT or a court.
How to keep the cost down
- Send organised documents. One folder, in date order, saves review time.
- Make a defect list first. Walk the property and note what worries you, room by room.
- Be clear on the purpose. Tell the expert if the report is for negotiation, Fair Trading, NCAT or court.
- Tell them your deadlines up front. Rushed reports cost more.
Is it worth it?
In a defect dispute, the expert report is usually the evidence that decides the outcome. A claim without one often fails or settles for far less than the work will really cost. Compare the fee with the cost of fixing the defects yourself.
Fixed-fee reports in Sydney
We prepare building defect reports, NCAT expert reports and fixed-price rectification quotes across Sydney. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.
This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.
Frequently asked questions
Can you tell me the report fee over the phone?
We can usually give a fixed fee once we know the property, the number of issues, the documents involved and what the report is for. The fee is confirmed in writing before the inspection.
Is the rectification quote included in the report fee?
If you ask for costing, the itemised rectification cost is included in the agreed fee. It is the part that tells the Tribunal or insurer what the fix is worth.
Will the fee change if the other side responds?
The agreed fee covers the agreed brief. If a reply report, conclave or joint report is needed later, we quote it separately before starting.