Builder's Rectification Quotes ยท Sydney A fixed-price quote to fix it properly.

When a dispute turns on what it will cost to fix defective or incomplete work, you need a real builder's quote, not a guess. We scope the rectification and price every item at a fixed price, laid out so a Tribunal, court or insurer can see exactly how the figure was reached.

  • Fixed-price, itemised quotes
  • For NCAT, court and insurers
  • Scope of works for each defect
  • Current Sydney building rates
  • Preliminaries, margin and GST shown
  • Licensed builder 384697C
Talk directly with the builder0415 840 500

Request a report or quote

We call you back

Confidential. We confirm a fixed fee before any work starts.
40+
Years building and repairing in Sydney
Fixed
Report fee agreed before we start
PD3
Written to the NCAT expert code of conduct
DBP
Registered builder, including Class 2
Why the quote matters

The cost of rectification decides the order.

Under the Home Building Act, the Tribunal's preferred outcome is for the builder responsible to come back and fix the defects. But when that is not appropriate, for example because the relationship has broken down or the builder is not licensed to do the work, the Tribunal can make a money order for the cost of rectification. The amount awarded depends on the evidence of what the work will really cost.

A single lump sum from a builder who has not inspected the site, or a quote that leaves out access, scaffolding, waste, supervision or the builder's margin, is easy for the other side to attack. NCAT's expert evidence rules ask for the scope of the recommended works, the likely cost and how that cost was calculated. Our quotes are built to meet that standard.

We are a working remedial and residential builder. The rates in our quotes are the rates we would actually charge to do the work in Sydney today, and each item is tied to a defect, a photo and a scope. If you want us to carry out the work once the dispute is resolved, the same quote is the price.

Defective concrete opened up to scope the rectification
40+Years building in Sydney
Is this you?

When you need a rectification quote

If any of these sound familiar, it is worth a call. We will tell you which report or quotation will help, and confirm a fixed fee before we start.

Your NCAT claim needs a cost

You have a defect report but no reliable figure for what it will cost to fix.

The other side's figure is too low

The builder says the defects are worth a few thousand dollars and you know they are not.

Incomplete work after a termination

The contract ended and you need the cost to complete the remaining work.

An insurer or HBCF claim

An insurer, assessor or the Home Building Compensation Fund has asked for a builder's quote.

A settlement offer to test

You need a realistic cost to decide whether an offer is fair.

A strata defect claim

The owners corporation needs costs for common property defects to support a claim or a bond call.

Already have an expert report? Send it through and we will price its scope item by item at a fixed price.

What every quote shows

Every dollar explained, item by item.

Our quotes are set out so a member, judge, assessor or the other side's expert can follow every figure.

01

Scope for Each Item

What will be done to fix each defect: removal, replacement, materials and the standard it will be built to.

02

Itemised Pricing

A fixed price for every item, so the Tribunal can allow or disallow items one at a time.

03

Preliminaries and Access

Site setup, scaffolding, protection, waste, supervision and insurances priced separately and openly.

04

Margin, Contingency and GST

Builder's margin, any allowance for unknowns and GST shown separately, never buried.

05

Assumptions and Exclusions

What the price is based on and what it does not include, such as approvals, engineering or provisional sums.

06

Ties to the Expert Report

Item numbers that match your expert report or Scott Schedule, so nothing gets lost in translation.

Our process

Inspected, scoped, priced.

We inspect before we price. A quote prepared from photos alone does not carry the same weight.

Brief & Fixed Fee

Tell us what the report is for and send the contract, plans, photos, correspondence and any Tribunal directions. We confirm the scope, timing and a fixed fee in writing before we attend.

Site Inspection

We inspect, measure and photograph every item, take moisture readings and carry out non-destructive checks where they help. Each item is numbered and located.

Assessment

Each item is assessed against the contract, the approved plans, the National Construction Code, Australian Standards and the manufacturer's instructions, and we identify the cause, not just the symptom.

Report & Costing

You receive a written report with our opinion and reasons for each item, the scope of work to fix it and an itemised, fixed-price costing that shows how every figure was calculated.

Support to Resolution

We answer questions, prepare supplementary reports if new information comes to light, and attend an expert conclave, joint report or hearing when directed, with those fees agreed in advance.

The quote you can rely on, and build from.

A fixed, itemised price based on real rates. If you want us to do the rectification once the dispute is settled, that is the price.

Why choose METCON

Quotes from builders who do the work.

We rectify defects in houses and apartment buildings every week, so our prices reflect what the work actually costs, not what looks good on paper.

A Builder, Not Just an Inspector

We have built and repaired buildings in Sydney for over 40 years, so our scopes are buildable and our costs come from what the work really takes.

Licensed & DBP Registered

Builder licence 384697C and DBP General Unrestricted registration BUP4254812, including Class 2 apartment buildings.

Written for the Tribunal

Reports follow the structure NCAT and the courts expect: instructions, facts and assumptions, reasons for each opinion and the code of conduct acknowledgement.

Fixed Fee, Agreed Upfront

You know the cost of the inspection and report before we attend. No hourly meter running in the background.

Itemised, Defensible Costs

Every item is scoped and priced separately, with preliminaries, access, waste, supervision, margin and GST shown, so the numbers stand up to scrutiny.

Evidence You Can Use

Dated photos, measurements, readings and references to the relevant standards for every item, laid out so a member or judge can follow it.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from METCON clients.

We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
KLKaren Lawson Bondi Junction
I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
LCLisa Chen Randwick
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Rectification Quotes FAQ

Common questions.

Straight answers. Anything else, just ask.

Is your quote a fixed price?

Yes. Each item is priced at a fixed amount based on our inspection and the scope set out in the quote, with any assumptions, exclusions and provisional sums stated clearly.

Can NCAT use a builder's quote as evidence?

Yes. Quotes are commonly used as evidence of the cost of rectification. The more detailed the scope and the clearer the pricing, the more weight it is likely to carry. For larger claims, the costing is usually part of an expert report that follows Procedural Direction 3.

Will you do the work if we win?

Yes, if you want us to. If the scope has not changed, the price in our quote is the price for the work.

Why is your quote higher than the original builder's price?

Rectification usually costs more than doing it right the first time. Defective work has to be removed before it can be redone, the site has to be set up again, and access and protection are needed around finished work.

How much does a report cost?

It depends on the size of the property, the number of items and what the report is for. We confirm a fixed fee in writing before we attend, based on your documents and a short call, so there are no surprises.

More reports and quotes

Other report services.

Most disputes need more than one document: a defect report, a costing, a Scott Schedule and sometimes a hearing. We can prepare them all from one inspection.

Back to Inspections & Reports
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Rectification quotes across Sydney.

Houses, terraces, townhouses and apartment buildings across Sydney and surrounding NSW.

Let's get started

Need a cost of rectification?

Send photos, any defect report and the deadline you are working to. We will confirm what is needed and the fee before we attend.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Request Report