Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Mascot ยท City Fringe Balcony & strata remedial builders in Mascot.

Remedial building for Mascot apartment towers and strata schemes: defect rectification, concrete and structural repairs, basement leaks, balcony and podium waterproofing.

  • Free inspection in Mascot
  • Itemised written quote
  • Class 2 and strata experience
  • Licensed builder 384697C
  • DBP registered BUP4254812
  • Photos and records for your strata
Talk directly with the builder0415 840 500

Free inspection in Mascot

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Inspection in Mascot
DBP
Registered for Class 2 work
$20M
Public liability insurance cover
Remedial building in Mascot

Apartment towers on low, sandy ground.

Mascot has seen a large number of apartment towers built around the station and near the airport, on low-lying land with sandy soils and relatively high groundwater in places.

That makes basements, lift pits and drainage particularly important. Owners should also keep an eye on cracks, balcony leaks and podium waterproofing, and get qualified advice early if something does not look right.

Common problems we fix in Mascot

  • Basement and lift pit water entry
  • Cracks in slabs and transfer structures
  • Podium and balcony leaks
  • Facade sealant failure
  • Class 2 building defects
Spalled concrete and corroded steel, remediated by METCON
MascotCity Fringe

Mascot at a glance

RegionCity Fringe
CouncilBayside Council
Building classClass 2 apartments, strata and homes
InspectionFree, usually within a few days

Most Mascot apartment buildings are modern and not heritage listed. Council approval may still be needed for some external works.

Remedial services in Mascot

One builder for the whole problem.

Leaking balconies cause concrete cancer, failed render lets water into walls. We fix the cause and the damage, so you deal with one licensed builder.

Why METCON

Strata remedial work, done once.

We work to your engineer's or consultant's specification, photograph every hold point and hand over the records your strata committee, insurer and future buyers will ask for. For Class 2 buildings we handle the DBP Act requirements with your design practitioner.

You deal directly with the builder, from the first inspection in Mascot to the final flood test and handover.

Principal Contractor
Meteora Constructions Pty Ltd
Builder Licence384697C
DBP RegistrationBUP4254812
Demolition LicenceAD214430
Public Liability$20M
ServicingMascot and City Fringe
ABN 89 151 074 421
What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from strata buildings and homeowners.

I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Helpful guides

Know more before you start.

Plain-language guides for owners and strata committees.

Mascot FAQ

Remedial building in Mascot: questions.

Straight answers from the builder. Anything else, just call.

We have noticed new cracks in our Mascot apartment building. What should we do?

Report them to your strata manager in writing with dated photos. New or growing cracks should be looked at by a structural engineer. We can then carry out any repairs to the engineer's design.

Do you do balcony repairs and waterproofing in Mascot?

Yes. We repair and re-waterproof balconies, terraces, podiums and wet areas on Mascot apartment buildings and homes, and repair concrete cancer and balustrades at the same time where needed.

Are you registered for Class 2 apartment work in Mascot?

Yes. METCON is a licensed builder (384697C) and a registered building practitioner under the Design and Building Practitioners Act (BUP4254812), so we can carry out remedial work on Class 2 apartment buildings.

Do remedial works in Mascot need council approval?

Many repairs are maintenance and do not, but some works can. Most Mascot apartment buildings are modern and not heritage listed. Council approval may still be needed for some external works. The council is Bayside Council. We check what applies before quoting.

How much do remedial repairs cost in Mascot?

It depends on what is under the tiles or render, access and the size of the job. We inspect, test where needed and give an itemised quote, with rates for anything hidden.

Nearby areas

Also servicing near Mascot.

We work right across City Fringe and the rest of Sydney. See all service areas.

Leaking balcony or concrete cancer in Mascot?

Free inspection and a straight answer from a licensed, DBP registered Sydney builder.

Call now Free Quote