Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Mould Remediation ยท Sydney Mould removed. The cause fixed.

Mould keeps coming back when only the surface is cleaned. We find the water causing it, remove mould-affected linings and materials, fix the leak, damp or ventilation problem, and rebuild so it stays dry.

  • Mould remediation
  • Leaks and damp fixed at the source
  • Affected linings removed
  • Ventilation improvements
  • Class 2 strata (DBP registered)
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Why mould keeps coming back

Mould is a water problem.

Mould needs moisture to grow. In Sydney buildings that moisture usually comes from one of three places: water getting in through roofs, balconies, windows, walls or plumbing; rising or penetrating damp in masonry; or condensation from poor ventilation in bathrooms, laundries, wardrobes and subfloors.

Wiping or spraying mould off a surface treats the symptom. If the wall behind is wet, the plasterboard is saturated or the subfloor is damp, the mould grows back, often inside the wall where you cannot see it.

Mould remediation is building work: find the moisture source with inspection and moisture readings, remove the mould-affected materials, repair the leak or damp, improve ventilation where needed, and rebuild with materials suited to the area.

Room stripped back to masonry to remove damaged linings
DBPRegistered builder
Is this you?

Signs of a building mould problem

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Mould that keeps returning

Patches that come back within weeks of cleaning point to moisture in the building, not just the surface.

Musty smell

A persistent damp, earthy smell, often stronger in wardrobes, cupboards and closed rooms.

Stains and bubbling paint

Water stains, blistering paint or soft plasterboard on walls and ceilings.

Mould along walls and ceilings

Growth at ceiling corners, behind furniture or along the base of walls.

Damp subfloors

Wet soil, timber decay or mould in the subfloor of older homes.

Leaks from above

Mould in apartments below balconies, roofs and bathrooms is usually a waterproofing failure.

Mould keeps coming back? Send us photos and tell us where it is, and we will tell you where the water is likely coming from.

What we do

Mould remediation, from cause to rebuild.

We fix the building problem behind the mould and work alongside hygienists where testing or clearance is required.

01

Moisture Investigation

Inspection, moisture readings and, where needed, opening up walls and ceilings to find the source of the water.

02

Removal of Affected Materials

Mould-affected plasterboard, linings, carpet underlay and timber removed with containment to limit spread.

03

Leak & Waterproofing Repairs

Balcony, roof, bathroom, window and facade leaks repaired so water stops reaching the area.

04

Rising & Penetrating Damp

Damp proof courses, drainage and masonry repairs where moisture is coming through the walls.

05

Ventilation Improvements

Exhaust fans ducted outside, subfloor ventilation and airflow improvements to control condensation.

06

Rebuild & Make Good

New linings, moisture-resistant materials, waterproofing and finishes so the area is restored.

Recent work

Mould Remediation projects.

A selection of recent mould remediation projects across Sydney.

View all projects
Our process

Found, fixed and rebuilt.

Every mould remediation job follows the same five steps, from diagnosis to documented handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

Fix the water, and the mould stops.

Photos of the source, the removal and the repair, so owners, strata committees and tenants can see the problem has been dealt with properly.

Why choose METCON

Sydney mould remediation builders.

Cleaning companies treat surfaces. As a licensed, DBP registered remedial builder, we fix the leaks, damp and building defects that cause mould in the first place.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
Excellent communication throughout. Constatine and his team were able to assist us immediately on an urgent government project, improved the plans we already had, and provided multiple options to suit our needs. Highly recommended.
MMish Annandale
Mould Remediation FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

What is the difference between mould removal and mould remediation?

Mould removal usually means cleaning visible mould from surfaces. Mould remediation deals with the cause: finding and fixing the water, removing mould-affected building materials and rebuilding, so the mould does not come back.

Why does mould keep coming back after cleaning?

Because the moisture feeding it is still there. A leak, rising damp or condensation from poor ventilation will keep the area damp until the building problem is fixed.

Who is responsible for mould in a strata apartment?

It depends on the cause. Leaks from common property such as balconies, roofs and external walls are usually the owners corporation's responsibility. Condensation from how a unit is used may be the occupant's. We can inspect and report on the likely source.

Do you do mould testing?

We investigate and fix the building causes. Where air testing or clearance testing is required, we work alongside independent occupational hygienists.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Mould remediation across Sydney.

Houses, terraces, apartments and strata buildings across Sydney, from the Eastern Suburbs and Inner West to the North Shore and Northern Beaches.

Let's get started

Tell us where the mould is.

A few photos and a description of where the mould is and how long it has been there is enough for an initial view.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote