Few things upset a hotel guest faster than a musty smell or black spots on a bathroom ceiling. Housekeeping can keep it clean for a while, but if mould keeps returning there is usually a building problem behind it. For hotels and serviced apartments, finding that problem protects reviews, room revenue and the building.
Why hotels are prone to mould
- Bathrooms used heavily: showers run many times with poor ventilation.
- Tired waterproofing: old showers leak into walls and rooms below. See hotel bathroom leaks.
- Air conditioning: blocked condensate drains, dirty units and cold surfaces in humid weather.
- Rooms left closed: empty rooms get no airflow, and moisture builds up.
- Windows and facades: slow leaks behind curtains, wall coverings and furniture.
- Vinyl wallpaper: can trap moisture and hide mould on the wall behind.
- Older buildings: damp walls, as in heritage pubs and hotels.

Warning signs for housekeeping and maintenance
- Musty smells, particularly when a room has been closed.
- Spots on ceilings near exhaust fans or around air conditioning vents.
- Bubbling paint or lifting wall coverings.
- Stained or damp carpet at the bathroom door.
- Repeated cleaning requests for the same room or the same stack of rooms.
Track it by room
Keep a register of complaints and maintenance by room number. If it is one vertical stack of rooms, look at the riser, bathrooms or facade above. If it is one side of the building, consider weather and sun exposure.
What to do when mould is found
- Take the room out of sale if the mould is significant or a guest has complained of health symptoms.
- Find the moisture source: leak, ventilation or air conditioning.
- Repair the source.
- Remove affected materials, and clean and dry the room properly.
- Check again after a few weeks to make sure it has not returned.
Fixing it while trading
Hotels can usually fix rooms in small batches, keeping others in sale. See repairing while trading and planned maintenance. Low-occupancy periods are a great time to bring problem rooms forward.
How repairs help your hotel
- Fewer complaints, refunds and poor reviews.
- More rooms available to sell.
- A healthier environment for guests and staff.
- Less water damage to rooms below.
Help for hotels
We work with hotels to find the source of mould and repair the building, room by room. See our mould remediation service. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Why does mould keep coming back in my hotel bathrooms?
Usually because moisture is still present, for example from poor ventilation or leaking showers. Cleaning removes the mould, but not the cause.
Can mould be fixed without closing the hotel?
Yes. Rooms can usually be treated in small groups while the rest of the hotel keeps trading.
Is hotel air conditioning a cause of mould?
It can be. Blocked drains, dirty units and cold surfaces in humid conditions can all lead to mould. Regular maintenance helps.

