Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Defect Rectification ยท Sydney Building defects, properly rectified.

Leaks, cracking, failed waterproofing and non-compliant work in houses and apartment buildings. We scope, price and rectify defects to the standard they should have been built to.

  • Residential and strata
  • Waterproofing defects
  • Structural defects
  • Facade and render defects
  • DBP registered BUP4254812
  • Engineer-coordinated
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Defect rectification

Fixing what should have been right.

Building defects are usually found the hard way: a leak after the first big storm, cracking that keeps growing, or an inspection report ahead of a sale or warranty deadline. Under the Home Building Act 1989, NSW residential work carries statutory warranties of six years for major defects and two years for other defects.

Rectifying a defect properly starts with understanding it. We review inspection and engineer reports, investigate the cause on site, and price a scope that fixes the problem rather than hiding it.

For Class 2 apartment buildings, rectification is regulated building work under the Design and Building Practitioners Act 2020. METCON is DBP registered (General Unrestricted, BUP4254812) to carry out that work.

METCON team reviewing defects on site
DBPRegistered builder
Is this you?

Common defects we rectify

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Waterproofing failures

Leaking balconies, wet areas, roofs, podiums and basements.

Cracking in walls and slabs

Structural or movement cracking that keeps growing or reopening.

Facade and render defects

Cracked, drummy or detaching render and failing cladding details.

Drainage defects

Poor falls, missing overflows and water directed into the building.

Non-compliant balustrades

Balustrades that are loose, too low or climbable.

Incomplete or poor workmanship

Work that does not meet the NCC, Australian Standards or the approved plans.

Have an inspection report or defect list? Send it through and we will price the rectification line by line.

What we rectify

Defect rectification, start to finish.

Whether the original builder is gone, unwilling or simply out of their depth, we can scope and fix the problem.

01

Defect Investigation

Site investigation and review of existing reports to confirm the cause of each defect.

02

Waterproofing Rectification

Strip and replace failed membranes to wet areas, balconies, roofs and podiums.

03

Structural Rectification

Engineer-designed repairs to cracking, footings, slabs and structural elements.

04

Facade Rectification

Render, brickwork, cladding details and flashings repaired to prevent water entry.

05

Compliance Upgrades

Balustrades, drainage and fire-related items brought up to the required standard.

06

Documentation

Photos, product data and sign-offs to close out the defect properly.

Recent work

Defect Rectification projects.

A selection of recent defect rectification projects across Sydney.

View all projects
Our process

Scoped properly. Fixed properly.

Every rectification job follows the same five steps, from report to documented handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

Defects closed out, not covered up.

Every defect item documented from investigation to completion, with the records you need for warranty, insurance, strata or sale.

Why choose METCON

Sydney's defect rectification builders.

We rectify defects the way they should have been built in the first place, and we document every step so the problem is closed for good.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Excellent communication throughout. Constatine and his team were able to assist us immediately on an urgent government project, improved the plans we already had, and provided multiple options to suit our needs. Highly recommended.
MMish Annandale
We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
KLKaren Lawson Bondi Junction
Building Defect Rectification FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

What is remedial building?

Remedial building is the repair of defects, damage and deterioration in existing buildings, such as concrete cancer, leaking balconies, failed waterproofing, rising damp and cracked facades. The aim is to fix the underlying cause and restore the building's performance, not just its appearance.

Do I need a DBP registered builder for strata remedial work?

For Class 2 apartment buildings in NSW, remedial work is regulated under the Design and Building Practitioners Act 2020. METCON holds DBP General Unrestricted registration (BUP4254812), so we can carry out that work and lodge the required declarations.

How much does remedial building work cost?

It depends entirely on the defect, its extent, access and the specification. A small concrete cancer patch is very different from a whole-building balcony programme. We inspect for free and provide an itemised written quote so you can see exactly where the money goes.

Is remedial work covered by warranty?

Residential building work in NSW carries statutory warranties under the Home Building Act 1989: six years for major defects and two years for other defects. We provide full documentation at handover.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

GuideFire Stopping Defects in Apartment BuildingsRead the guide GuideThe Defects Liability Period on Strata Remedial ContractsRead the guide GuideBuilding Commission NSW Rectification Orders ExplainedRead the guide GuideClaiming Against a Builder for Defects in NSW: Time LimitsRead the guide GuideThe DBP Act and Remedial Work on Apartments, ExplainedRead the guide GuideStructural Defect Rectification Process ExplainedRead the guide GuideStrata Building Defects in NSW: A Guide for Owners CorporationsRead the guide GuideDefects Liability Period in NSW: What Owners Need to KnowRead the guide GuideGot a Building Defect Report? What to Do Next in NSWRead the guide GuideBuying an Apartment with Building Defects in NSWRead the guide GuideWaterproofing Defects in New Apartments: Your Rights in NSWRead the guide GuideFire Stopping Defects in Apartment Buildings: A Strata GuideRead the guide GuideMixed-Use Buildings: Leaks Between Apartments and ShopsRead the guide GuideWindow Wall Leaks in Apartment Towers: Causes and RepairsRead the guide GuideRAB Act Orders: What NSW Apartment Developers Need to KnowRead the guide GuidePre-Handover Defect Inspections for Apartment DevelopersRead the guide GuideThe DBP Act Duty of Care: Developers and OwnersRead the guide GuideBalcony Defects in New Apartments: What to Look ForRead the guide GuideWater From the Balcony Getting Into Walls and Floors InsideRead the guide GuideBalcony Waterproofing Warranties: What Strata Should Ask ForRead the guide GuideBefore Your Strata Warranty Ends: Defect ChecklistRead the guide GuideWhen a Lot Owner's Renovation Damages Common PropertyRead the guide GuideStair, Handrail and Balustrade Defects in ApartmentsRead the guide GuideDefect or Maintenance? Sorting Problems in a Strata BuildingRead the guide GuideRectification Works After a Strata Defect SettlementRead the guide GuideWaterproofing Defect Claims at NCAT: Proving the LeakRead the guide
Where we work

Defect rectification across Sydney.

Houses, townhouses and apartment buildings across Sydney and surrounding NSW.

Let's get started

Send us the defect report.

An inspection report, defect list or photos is enough for us to start. We will review it and come back with a scope and price.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote