When you buy an apartment, you are not just buying the unit. You are buying a share of the whole building, including its balconies, roof, facade, car park and waterproofing. If the building has defects, the cost of fixing them will be shared by the owners, and that includes you.
This article is general information. Talk to your conveyancer or lawyer before you buy.
Why defects matter to buyers
- Special levies. Major remedial work is often funded by a special levy on every owner.
- Disruption. Scaffold, noise and balconies out of use can last months.
- Insurance and finance. Some defects affect insurance premiums or a lender's view of the building.
- Resale. Known defects can affect value until they are fixed.

Step 1: get a strata report
A strata inspection report looks through the owners corporation's records. Ask the inspector to look specifically for:
- Minutes of recent AGMs and strata committee meetings that mention leaks, concrete cancer, balconies or defects.
- Defect reports, engineer reports and building condition reports.
- Special levies raised or proposed.
- The capital works fund balance and the 10-year plan.
- Any legal action against a builder or developer.
- Correspondence about orders from council or Building Commission NSW, including rectification orders.
- For newer buildings, the status of the strata building bond.
Step 2: get a building inspection
A pre-purchase inspection of the unit will pick up visible problems inside it. Ask the inspector to look closely at:
- The balcony: cracking, rust stains, drummy tiles, water pooling and the door threshold.
- Ceilings and walls for staining, especially under balconies and bathrooms above.
- Bathroom floors and shower walls for signs of leaks.
- Windows and doors for water marks and swelling.
- Common areas you can access: car park, stairwells, roof.
A unit inspection cannot see inside slabs or under tiles, so the strata records matter as much as the inspection.
Step 3: look at the building yourself
Walk around the outside. Signs of balcony failure and concrete cancer are often visible from the street: rust stains, cracked slab edges, patched concrete, scaffold, or tarps on balconies.
Step 4: ask the right questions
- Are there any known defects or planned remedial works?
- Have any special levies been raised or discussed?
- Has there been any recent water damage or insurance claim?
- Is there any dispute or claim against the builder?
- For a newer building, when was it completed?
Newer buildings
A building only a few years old can still have serious defects, most often in waterproofing. Statutory warranties may still be running, which can help owners recover costs. See time limits for claims.
Already bought into a building with defects?
Encourage your committee to get an engineer's report, plan the work and budget for it. Our guides on getting owners to approve remedial works and the tender process can help. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How do I find out if an apartment building has defects?
Get a strata report that reviews meeting minutes, defect and engineer reports, special levies and the capital works fund, plus a building inspection of the unit and a walk around the outside.
Will I have to pay for defects that existed before I bought?
Usually you share in the cost of common property repairs as an owner, including levies raised after you buy. Ask about planned works and levies before you exchange.
Is a new apartment safe from defects?
Not necessarily. Waterproofing defects are common in newer buildings. Statutory warranties may help, so check the completion date and any defect reports.