On many apartment buildings, scaffold, swing stages or other access are a large share of the cost of facade and balcony work. Paying for access twice, for two separate jobs, is one of the most common ways strata buildings waste money.
What can be bundled
- Concrete cancer and slab edge repairs.
- Render and brickwork repairs, repointing and crack repairs.
- Balcony waterproofing, tiling and balustrade replacement.
- Window sealant replacement or window replacement.
- Wall tie replacement in cavity brick buildings.
- Box gutter, downpipe and roof edge repairs.
- Protective coatings and full repainting.
- Replacing old services on the facade: lights, conduits, abandoned brackets.
Plan the order
Work from the top down and from the structure out. Roof edges and gutters first, then structural and concrete repairs, then waterproofing and sealants, then coatings and paint last, so finished surfaces are not damaged.
Think ahead
If the building will need repainting in the next few years, consider doing it while the scaffold is up, rather than paying for access again. The same goes for windows reaching the end of their life. See fix these before repainting.
Approvals for scaffold
Scaffold over a footpath or on a neighbour's land may need council approval or neighbour agreement. Allow time for this in the program. See neighbour access for scaffold.
One contractor, one program
Using one builder to coordinate all the trades under one access setup keeps the program tight and avoids trades damaging each other's work. See whole-of-building remedial programs.
Bundled remedial works
We coordinate facade, balcony, window and roof works under one access setup on Sydney apartment buildings. See facade repairs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Is scaffold always the best access?
Not always. Swing stages, boom lifts or rope access can suit some buildings. The choice depends on height, the work and site constraints.
Can we add work once the scaffold is up?
Often yes, as a variation, but it is better to plan it from the start so it is priced competitively.
Who coordinates multiple trades?
The head contractor. One builder managing all trades avoids gaps and finger-pointing.