Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Balcony Repairs ยท Sydney Balconies fixed, sealed and safe.

Leaking into the unit below, drummy tiles, rust stains, cracked edges or a loose balustrade. We repair the whole balcony system: structure, waterproofing, drainage, tiles and balustrade.

  • Leaking balcony repairs
  • Balcony waterproofing
  • Concrete cancer repairs
  • Balustrade repairs
  • Strata and residential
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Why balconies fail

Most leaks start underneath the tiles.

A balcony is exposed to more weather than almost any other part of a building. Sun, rain and movement break down the waterproofing membrane under the tiles over time, and once water gets through it finds the slab, the steel and the ceiling of the unit below.

The usual culprits are a failed or missing membrane, poor falls to the drain, a blocked or undersized outlet, a missing waterstop at the door, or tiles laid straight over an old leaking surface. Surface sealers can buy time, but they rarely fix a balcony that is leaking through the slab.

We start by finding out why it is leaking. Then we fix it properly: strip back, repair any concrete damage, set correct falls, install a compliant membrane to AS 4654.2, re-tile and make good the balustrade. You get a dry balcony and a documented repair.

Water staining under a leaking balcony slab
DBPRegistered builder
Is this you?

Six signs your balcony needs repair

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Water stains on the ceiling below

Stains, bubbling paint or drips in the room or unit under the balcony.

Drummy or cracked tiles

Hollow-sounding, lifting or cracked tiles usually mean water is trapped underneath.

White powder on grout or edges

Efflorescence is salt carried out by water moving through the balcony.

Rust stains and cracked edges

Signs of concrete cancer in the slab edge from long-term water entry.

Water pooling after rain

Poor falls or blocked drains keep water sitting on the membrane.

Loose or corroded balustrade

Movement or rust at the fixings is a safety issue and often lets water into the slab.

Balcony leaking into the unit below? Send us photos of the balcony and the ceiling and we will tell you what we think is going on.

What we repair

Every part of the balcony.

We treat the balcony as one system. Fixing the tiles without the membrane, or the membrane without the concrete, is how leaks come back.

01

Leak Investigation

Visual inspection, water testing and moisture readings to find where water is getting in before any work starts.

02

Membrane Replacement

Strip back to the slab and install a new compliant membrane with correct upturns, waterstops and outlet details.

03

Falls & Drainage

Screeds re-graded to fall to the outlet, new or upsized drains and overflow provision where needed.

04

Concrete Cancer Repairs

Break out and repair corroded slab edges and soffits as part of the same job, not as a separate call-out.

05

Re-Tiling

New tiles on a correct bed with movement joints, matched as closely as possible to the rest of the building.

06

Balustrade Repairs

Repair or replace corroded balustrade fixings and frames, re-fixed to be secure and compliant.

Recent work

Balcony Repairs projects.

A selection of recent balcony repairs projects across Sydney.

View all projects
Our process

Dry balconies. Documented.

Every balcony follows the same five steps, from leak investigation to handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

A balcony that stays dry.

Membrane product data, photos at every stage including the membrane before tiling, flood testing where appropriate, and your statutory warranty.

Why choose METCON

Sydney's balcony repair builders.

Tiling over a leak or painting on a sealer is not a repair. We fix the membrane, the concrete and the drainage underneath, because that is where balconies fail.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
We're a strata block and needed a retaining wall replaced urgently. METCON moved fast, communicated well, and the residents are very happy.
PSPriya Sharma North Sydney
Balcony Repairs FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

What is remedial building?

Remedial building is the repair of defects, damage and deterioration in existing buildings, such as concrete cancer, leaking balconies, failed waterproofing, rising damp and cracked facades. The aim is to fix the underlying cause and restore the building's performance, not just its appearance.

Do I need a DBP registered builder for strata remedial work?

For Class 2 apartment buildings in NSW, remedial work is regulated under the Design and Building Practitioners Act 2020. METCON holds DBP General Unrestricted registration (BUP4254812), so we can carry out that work and lodge the required declarations.

How much does remedial building work cost?

It depends entirely on the defect, its extent, access and the specification. A small concrete cancer patch is very different from a whole-building balcony programme. We inspect for free and provide an itemised written quote so you can see exactly where the money goes.

Is remedial work covered by warranty?

Residential building work in NSW carries statutory warranties under the Home Building Act 1989: six years for major defects and two years for other defects. We provide full documentation at handover.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

GuideBalcony Slab Replacement vs Repair: When Is a Balcony Beyond Repair?Read the guide GuideBalcony Remediation Week by Week: What Owners Will SeeRead the guide GuideBalcony Balustrade Heights and Gaps: NSW Rules for Older BuildingsRead the guide GuideGlass Balustrade Problems on Apartment BalconiesRead the guide GuideBalcony Repair and Waterproofing Cost in SydneyRead the guide GuideFailing Balcony? 9 Warning Signs of an Unsafe BalconyRead the guide GuideHow to Waterproof a Balcony Properly: Step by StepRead the guide GuideLeaking Balcony Repairs in Sydney: Causes, Waterproofing and CostRead the guide GuideBalcony Waterproofing in NSW: Standards, Details and WarrantyRead the guide GuideLoose or Rusted Balcony Balustrades: Repair and ReplacementRead the guide GuideBalcony Leaking Into the Room Below? Leak Detection and RepairRead the guide GuideBalcony Balustrade Height Rules in NSW and AustraliaRead the guide GuideBalcony Door Thresholds and Step-Downs: Why Water Gets InRead the guide GuideRe-tiling Your Apartment Balcony: Strata ApprovalRead the guide GuideYour Apartment Is Leaking Into the Unit Below: What To DoRead the guide GuideHow Long Do Strata Remedial Works Take? Typical TimelinesRead the guide GuideEmergency Balcony Repairs in Sydney: Making It Safe FastRead the guide GuideBalcony Soffit Repairs: Stained Ceilings Under BalconiesRead the guide GuideBalcony Balustrade Replacement for Strata BuildingsRead the guide GuideBalcony Remediation for Strata Buildings: The Complete GuideRead the guide GuideBalcony Condition Surveys for Apartment BuildingsRead the guide GuideHow Long Does Balcony Waterproofing Last?Read the guide GuideChoosing Balcony Tiles for Apartment Buildings That LastRead the guide GuidePedestal Pavers on Apartment Balconies and TerracesRead the guide GuideBalcony Self-Inspection Checklist for Apartment OwnersRead the guide
Where we work

Balcony repairs across Sydney.

Apartment blocks, terraces and houses across the Eastern Suburbs, North Shore, Inner West and beyond.

Let's get started

Send us photos of your balcony.

Photos of the balcony surface, the drain and any staining below are enough for an initial view. We will book an inspection from there.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote