Most balcony problems develop slowly, but some need action today. Falling concrete, a loose balustrade or water pouring into the apartment below are safety and damage risks that should be dealt with quickly.
Signs of a balcony emergency
- Concrete falling from the slab edge or soffit.
- A balustrade that moves, leans or has loose fixings. See loose balustrades.
- Large cracks, sagging or a slab that feels springy.
- Water pouring into the unit below, especially near electrics.
- Timber balconies with rotten joists or soft boards. See timber balcony repairs.

What to do straight away
- Keep people off the balcony and away from the area below.
- Barricade and sign the area if you can do so safely.
- Report it to the strata manager, building manager or owner, in writing.
- Turn off power to affected circuits if water is near electrics, and call an electrician.
- Call a builder who can attend and make it safe.
What make-safe involves
- Removing loose concrete and render.
- Temporary propping under a damaged slab, to an engineer's advice where needed.
- Temporary barriers or bracing for unsafe balustrades.
- Temporary waterproofing, tarps or diverting water away from the leak.
- Protection for footpaths and entries below.
Make-safe buys time. It is not the final repair.
After the emergency
- Engineer's inspection where structure may be affected.
- Scope of permanent repairs: concrete, waterproofing, balustrades.
- Quote and approval, including strata approval where needed.
- Permanent repair, with photos and records.
See signs of balcony failure and falling concrete.
Insurance and strata
Tell your insurer quickly if there is damage. In strata buildings, balconies' structure and waterproofing are often common property, so the owners corporation usually leads. See strata emergencies.
How fast action helps
Acting fast protects people, limits damage and liability, and usually means a smaller permanent repair.
Balcony emergency?
We make balconies safe and carry out permanent repairs across Sydney. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What is a balcony emergency?
Falling concrete, a loose balustrade, a sagging or badly cracked slab, or water pouring into the unit below are all reasons for urgent action.
Can a builder make a balcony safe the same day?
Often, yes. Make-safe can include removing loose concrete, temporary propping, barriers and temporary waterproofing.
Is make-safe the final repair?
No. It protects people and property until a proper inspection and permanent repair can be done.


