A sudden leak through a ceiling or wall is stressful for residents and messy for strata. What happens in the first two days decides how much damage is done, whether insurance responds and how quickly the real cause gets fixed.
Hour 0 to 2: make safe
- Turn off water to the unit or building if a pipe has burst.
- Turn off power to wet areas if water is near electrics, and call an electrician.
- Move belongings, put down buckets and towels.
- Keep people away from sagging ceilings, which can collapse.

Hour 0 to 24: notify and document
- Tell the strata manager and building manager straight away.
- Take photos and video of the water, the damage and the weather.
- Note the time, what was happening (rain, a shower upstairs, a washing machine) and which rooms are affected.
- The strata manager notifies the building insurer. See strata insurance and leaks.
Hour 24 to 48: find the source
Drying a ceiling without stopping the leak just repeats the damage. A leak detection specialist or remedial builder traces the source:
- Plumbing leaks: pressure testing, thermal imaging.
- Shower and bathroom leaks from above. See water leaking from the unit above.
- Balcony leaks. See balcony leak detection.
- Roof, gutter and wall leaks. See apartment roof leaks.
After 48 hours: dry, then repair
- Dry out with fans and dehumidifiers, and check for mould. See mould in apartments.
- Fix the cause: plumbing, membrane, roof or wall.
- Repair ceilings, walls and finishes once dry.
Who pays?
It depends on the source and whether it is common property or lot property. See who is responsible for strata repairs.
Strata manager tip
Have an emergency contact list ready: plumber, electrician, leak detection and a remedial builder. Decide in advance what the manager can approve without a committee meeting, within limits.
Leak response and repairs
We find and fix the cause of leaks in apartment buildings and handle the repairs that follow. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What should I do first when water comes through my apartment ceiling?
Make it safe: stop the water if you can, keep away from sagging ceilings and electrics, move belongings, then tell the strata manager.
Should the ceiling be repaired straight away?
Not until the source is found and fixed and the area has dried. Otherwise the damage will repeat.
Who pays for a leak into my apartment?
It depends where the water came from and who is responsible for that part of the building. Insurance may cover sudden damage.