When top-floor residents report a leak, the roof is the first suspect, but it is not always the culprit. Water can come through parapets, walls, windows or flashings and show up far from where it entered. Finding the real path is the key to fixing it once.
Types of apartment roofs
- Pitched tiled roofs on many 1960s and 1970s walk-ups.
- Metal roofs, often with box gutters behind parapets.
- Flat concrete roofs with membranes, common on newer and taller buildings. See flat roof waterproofing.
- Roof terraces over units. See podium and roof terrace waterproofing.

Common causes of roof leaks
- Cracked, slipped or broken tiles and failed ridge pointing.
- Rusted or poorly lapped metal sheets and fixings.
- Failed flashings at walls, chimneys, vents and plant.
- Blocked or undersized box gutters without working overflows.
- Parapets with failed cappings. See parapet leaks.
- Membranes on flat roofs that have blistered, split or reached the end of their life.
- Penetrations from antennas, solar and air conditioning added later.
Finding the leak
- Map where and when water appears, and in what weather.
- Inspect the roof, gutters, flashings and parapets.
- Water test suspect areas one at a time, from the bottom up.
- Check walls and windows if the roof tests dry.
Repair or replace?
Local repairs suit a roof that is mostly sound. Replacement is usually better value when leaks keep recurring, the material is at the end of its life, or many repairs are needed. Roof work should be in your capital works plan.
Safety and access
Roof work on apartment buildings needs edge protection or scaffold, and sometimes a crane or hoist. Residents should never be asked to go on the roof to check leaks.
Damage below
Once the roof is fixed, wet ceilings need to dry before repair. See water damaged ceiling repair and mould in apartments.
Roof leak repairs for strata
We find and fix roof, gutter, parapet and flat roof leaks on apartment buildings across Sydney. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Why does the top-floor unit leak only in heavy rain?
Often because box gutters or outlets overflow in heavy rain, or wind pushes water past flashings and cappings. Testing in the right conditions finds the path.
Is the roof common property in strata?
In most strata schemes, yes, so the owners corporation is responsible for repairs. Check your strata plan and by-laws.
Should we repair or replace our apartment roof?
Repair if the roof is mostly sound. Replace if leaks keep recurring, materials are at the end of their life, or repairs would be extensive.