Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Excavation ยท Sydney Dig right. Build right. From the ground up.

We plan, coordinate, and execute excavation works across Sydney. Foundation digs, basement excavation, service trenching, and bulk earthworks. Accurate, controlled, and engineer-coordinated.

  • Licensed NSW Builder
  • Foundation Excavation
  • Basement Dig-Outs
  • Pool Excavation
  • Service Trenching
  • Bulk Earthworks
Talk directly with the builder0415 840 500

Free excavation quote

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
The foundation of every build

What happens below ground determines everything above it.

Excavation sets the levels, exposes the ground conditions, and creates the space for foundations. Get the excavation wrong, wrong depth, wrong levels, disturbed soil, or damaged services, and every stage of construction above is compromised.

METCON coordinates excavation with structural engineers and surveyors. We dig to exact levels, manage ground conditions, protect adjacent structures, and hand over a properly prepared excavation ready for foundation construction.

Whether it's foundation trenches for a house extension, a basement dig-out under an existing building, or bulk earthworks for a commercial development, we bring the right machines, operators, and engineering coordination to every job.

Excavation and footings beside a new wall
40+Years on the tools
Is this you?

Six projects that need professional excavation

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

New footings and foundations for construction

Foundation trenches, pad footings, strip footings, and slab excavation all need accurate level control and clean formation.

Basement or sub-floor dig-out

Excavating under or adjacent to existing structures requires engineering, underpinning, and careful ground management.

Pool excavation in tight residential sites

Pool digs need accurate dimensions, access planning, spoil removal, and coordination with pool builders and engineers.

Service trenching for utilities

Water, sewer, stormwater, electrical, and gas trenching with proper depths, bedding, and backfill requirements.

Retaining wall foundations

Excavation for retaining wall footings needs accurate levels, drainage provisions, and engineered formation.

Cut-and-fill for level sites

Sloping blocks need cut-and-fill earthworks to create level building platforms with proper compaction and drainage.

Need excavation done right? Send us the plans or scope and we'll price the earthworks.

What we excavate

Every type of earthwork.

From single footing trenches to full basement excavations, we handle excavation at every scale with precision and control.

01

Foundation Excavation

Trenches, pads, and slab excavation for residential and commercial foundations. Accurate to design levels, clean formation, and engineer-inspected before pouring.

02

Basement Dig-Outs

Excavation under and adjacent to existing buildings for basements and sub-floor space. Engineered retention, underpinning coordination, and groundwater management.

03

Bulk Earthworks

Large-scale cut-and-fill operations for development sites. Level platforms, access roads, drainage grades, and compacted fill to engineering specification.

04

Pool Excavation

Residential and commercial pool excavation to exact dimensions. Access management on tight sites, spoil removal, and coordination with pool shell installers.

05

Service Trenching

Utility trenching for water, sewer, stormwater, electrical, and communications. Correct depths, bedding, and backfill per authority requirements.

06

Spoil Removal

Excavated material loaded, transported, and disposed of to licensed facilities. Clean fill separated and recycled where possible. Waste tracking documented.

Recent work

Excavation projects.

A selection of recent excavation projects across Sydney.

View all projects
Our process

Measured. Controlled. Certified.

Every excavation follows our structured five-step process. Survey control, engineering coordination, and documented formation, every time.

Survey & Set-Out

Registered surveyor sets out the excavation boundaries and levels. Reference points established for level control throughout the dig.

Service Location

Underground services located using plans and on-site detection. Services marked, protected, or relocated before excavation begins.

Excavation

Dig progresses to design levels with ongoing level checks. Batters, retention, and dewatering managed as ground conditions require.

Formation Inspection

Engineer inspects the excavation formation, soil bearing capacity, level accuracy, and stability. Any issues addressed before construction proceeds.

Handover

Excavation complete, formation certified, survey as-built provided. Ready for foundation construction, drainage installation, or the next stage.

Accurate excavation, certified and ready to build on.

Survey set-out, level control documentation, formation inspection records, and engineer sign-off. The foundation of a well-built project.

Why choose METCON

Sydney's excavation specialists.

Excavation is the foundation of every construction project. We dig with precision and engineering coordination, not just machine operators digging holes.

Engineer Coordinated

Excavation coordinated with structural engineers and surveyors. Levels, formation, and ground conditions verified.

Adjacent Structure Safety

We manage excavation adjacent to existing buildings with proper retention, monitoring, and underpinning where needed.

Licensed Builder

Meteora Constructions Pty Ltd, fully licensed in NSW with all required insurances.

Right Equipment

Range of machines for every site size, from tight residential access to large development sites.

Ground Knowledge

Experience with Sydney's soil conditions, sandstone, shale, clay, and fill. We know what to expect and how to manage it.

40+ Years Experience

Hands-on Sydney building experience going back to the 1970s.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

We're a strata block and needed a retaining wall replaced urgently. METCON moved fast, communicated well, and the residents are very happy.
PSPriya Sharma North Sydney
I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
LCLisa Chen Randwick
We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
KLKaren Lawson Bondi Junction
Excavation FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Do I need a permit for demolition work?

Yes, most demolition work in NSW requires approval. Internal strip-outs may be exempt in some cases, but partial and full demolition typically require a Development Application or Complying Development Certificate.

Additional requirements may include:

  • Asbestos surveys
  • Waste management plans
  • Notification to adjoining property owners

We handle all permits and compliance requirements.

Can you remove asbestos?

We coordinate licensed asbestos removal as part of our demolition and renovation services. All asbestos work is carried out by licensed removalists in line with SafeWork NSW regulations.

If your property was built before 1990, there is a chance it contains asbestos, so we always arrange appropriate testing before starting demolition or renovation work.

What is included in your quotes?

Every METCON quote is fully itemised and includes:

  • Scope of work
  • Materials and specifications
  • Labour costs
  • Excavation and site preparation
  • Drainage (where applicable)
  • Engineering fees
  • Council application fees
  • Project timeline and payment schedule

There are no hidden costs. What we quote is what you pay, unless you request changes to the scope.

What happens if something goes wrong during the build?

Construction can sometimes uncover unexpected issues, especially on older properties or difficult sites.

If we find something outside the original scope, such as hidden asbestos, unstable soil or structural defects, we tell you immediately, explain the options and give you a clear cost for any additional work before proceeding.

You are never hit with surprise bills.

Other demolition & excavation services

More demolition & excavation services.

We cover the full scope of demolition & excavation work with one licensed team.

Back to Demolition & Excavation
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Sydney-wide excavation services.

We deliver excavation works across Sydney, from residential footings in the suburbs to commercial earthworks across greater NSW.

MosmanManlyCremorneLane CoveChatswoodHornsbyParramattaStrathfieldBurwoodConcordHunters HillDrummoyneFive DockLeichhardtNewtownSurry HillsPaddingtonBondiRandwickCoogeeMaroubraSutherlandHurstvilleKogarahCronullaEngadinePenrithLiverpoolCampbelltownWollongongCentral Coast+ Greater Sydney
Let's get started

Send us the plans.

Structural plans, site survey, or even a sketch of what you need dug. We'll assess access, ground conditions, and scope, then give you a clear price and timeline.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote