Excavating Near a Boundary: Shoring and Neighbour Protection

20 November 2026 · 4 min read · By the METCON team

Excavating for a basement, pool, garage or retaining wall right next to a boundary removes the support that the neighbouring land and buildings rely on. If the soil moves, the neighbour's footings, paths and walls move with it. Excavation near boundaries has to be planned and engineered.

The duty to support

An owner excavating their land must not remove the support that neighbouring land needs. Development consents commonly include conditions requiring the person excavating to protect and support adjoining buildings and land, and to give the neighbour notice before excavating below the level of their footings. Read your consent conditions carefully.

An engineered retaining wall supporting a cut next to a boundary.
An engineered retaining wall supporting a cut next to a boundary.

Ways to support the excavation

MethodTypical use
Battering backWhere there is room to slope the excavation safely
Contiguous or secant pilesBasements next to boundaries
Soldier piles and shotcreteCommon in Sydney soils over sandstone
Sheet pilesSoft or wet ground
Underpinning the neighbour's footingWhere their footing sits close to and above the dig, with their agreement
Staged excavation in panelsShort sections dug and supported one at a time

The structural and geotechnical engineers choose the method. See underpinning methods.

Before you dig

  1. Geotechnical investigation of soil, rock and groundwater.
  2. Engineering design for shoring and the permanent walls.
  3. Dilapidation report on the neighbour's property. See dilapidation reports.
  4. Notice to the neighbour as required by the consent.
  5. Locate services with Before You Dig Australia and a service locator.

During excavation

  • Follow the engineer's staging and hold points.
  • Monitor movement and vibration where required.
  • Keep water out of the excavation.
  • Stop and call the engineer if anything unexpected appears.

Boundary excavation

We excavate next to boundaries to engineered designs, with shoring, piling and underpinning. See excavation and underpinning. METCON is a licensed NSW builder (384697C) delivering civil works, excavation and retaining walls across Sydney. Call 0415 840 500 or request a quote.

Frequently asked questions

Does my neighbour have to agree to underpinning?

Work on their land or footings needs their agreement, or another legal basis. Plan it early.

Who pays if the neighbour's house cracks?

The person excavating may be responsible for damage caused by loss of support. A dilapidation report shows what was already there.

Is shoring removed afterwards?

Some shoring is temporary, some becomes part of the permanent wall. The engineer decides.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote