Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Brickwork Repairs ยท Sydney Brickwork repaired, not just patched.

Fretting bricks, crumbling mortar, stepped cracks and bulging walls. We repoint, stitch, replace and restore brickwork so it is sound, weathertight and matches what is already there.

  • Brick fretting repairs
  • Repointing & mortar repairs
  • Cracked brick stitching
  • Brick replacement
  • Heritage brickwork
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Why brickwork fails

Water, salt and the wrong mortar.

Most brickwork damage in Sydney comes down to moisture. Salt-laden water rises from the ground or soaks in from the surface, then evaporates through the face of the brick. As the salts crystallise they break the surface apart. That is fretting: bricks that powder, flake or hollow out year after year.

Mortar is meant to be the sacrificial part of a wall. When it erodes, water gets deeper into the wall and the bricks start taking the damage instead. Repointing with a hard modern cement mortar on an older wall makes it worse, because the bricks then wear faster than the joints around them.

Cracks are a different problem. Stepped cracks through the mortar, cracks through the bricks themselves, or walls that lean or bulge usually point to movement in the footings, failed lintels or missing wall ties. Patching the crack without fixing the cause means it opens again.

Arched opening rebuilt in matching brickwork
DBPRegistered builder
Is this you?

Six signs your brickwork needs repair

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Fretting or crumbling bricks

Brick faces that powder, flake or hollow out, often low on the wall or near downpipes.

Eroded mortar joints

Joints recessed back from the brick face, sandy to the touch, or missing in places.

Stepped or diagonal cracks

Cracks running through the mortar in a staircase pattern, often from the corners of windows and doors.

Cracked bricks

Cracks running through the bricks themselves rather than around them, usually a sign of movement.

White salt deposits

Efflorescence on the surface is a sign of moisture and salts moving through the wall.

Bulging or leaning walls

Walls that are out of plumb can mean failed wall ties or footings and need urgent assessment.

Not sure if it is cosmetic or structural? Send us a few photos of the cracking and we will tell you honestly.

What we repair

Brickwork repairs for every wall.

From a single fretting pier to a full facade, the approach is the same: fix the cause, then repair the brickwork to match.

01

Repointing & Mortar Repairs

Raking out failed joints and repointing with a mortar matched in strength and colour to the wall, lime-based for older brickwork.

02

Fretting Brick Replacement

Cutting out badly fretted bricks and replacing them with matched new or reclaimed bricks, then dealing with the moisture that caused it.

03

Cracked Brick Stitching

Helical stainless steel bars bonded into the joints across the crack to tie the wall back together, designed with an engineer where needed.

04

Lintel Replacement

Rusted steel lintels over windows and doors crack the brickwork above. We prop, remove the bricks, replace the lintel and rebuild.

05

Wall Tie Replacement

Corroded cavity ties let the outer skin of brick move. We install retrofit ties to reconnect it to the structure.

06

Brickwork Restoration

Cleaning, salt treatment, repointing and brick replacement on heritage and older walls, using materials that suit the original.

Recent work

Brickwork Repairs projects.

A selection of recent brickwork repairs projects across Sydney.

View all projects
Our process

Repaired to last. Matched to the wall.

Every brickwork job follows the same five steps, from diagnosis to documented handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

Repairs that blend in and stay put.

Mortar matched in colour and strength, bricks matched or reclaimed, and the moisture or movement behind the damage dealt with first.

Why choose METCON

Sydney brickwork repair specialists.

Brickwork repairs fail when the wrong mortar is used or the cause is ignored. We diagnose first and repair with materials that suit the wall.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

We have been undertaking a considerable repair and restoration of our 1850 residence in Darlinghurst. Constatine and his team completed outstanding work, all at a very competitive price. Every deadline was met with no increase to the original quote. Their knowledge, gathered over many years, and their incredible eye for detail significantly improved the final outcome beyond what was originally proposed. I rate them very highly and would recommend them wholeheartedly.
NDNicholas Davie Darlinghurst
Constatine and his team were outstanding from start to finish. They responded quickly, arrived on time for the quote, and once awarded the project, completed everything on schedule. The property was built in 1880 and presented a very difficult scope of work, but the team handled it expertly. We received regular updates, excellent advice, and the quality of workmanship was exceptional. They were also extremely tidy throughout the process. I could not recommend METCON highly enough.
MMatthew Enmore
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Brickwork Repairs FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

What is brick fretting?

Fretting is when the face of a brick powders, flakes or hollows out. It is usually caused by salts carried in by moisture crystallising inside the brick as the wall dries. Fixing it means dealing with the moisture first, then replacing or repairing the damaged bricks and joints.

When does brickwork need repointing?

When mortar joints are eroded back from the face, crumbly or missing, or water is getting into the wall. Repointing should use a mortar softer than the bricks, especially on older walls, so the joints wear rather than the bricks.

Can cracked brickwork be repaired without rebuilding?

Often, yes. Helical crack stitching ties the wall back together across the crack. But if the crack is caused by footing movement, failed lintels or corroded wall ties, that cause needs to be fixed too or the crack will return.

Is cracked brickwork a structural problem?

Fine hairline cracks are often cosmetic. Cracks wider than a few millimetres, cracks that are growing, cracks through bricks and walls that lean or bulge should be inspected. We can tell you honestly which it is.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

GuideDecorative Breeze Block Walls: Repairs in Older Apartment BuildingsRead the guide GuideCommon Problems in 1980s Sydney Apartment BuildingsRead the guide GuideLime Mortar vs Cement: Why Cement Damages Heritage BrickworkRead the guide GuideChimney Repairs for Older Homes: Cracks, Leaks and LeaningRead the guide GuideBrick Fretting: What Causes It and How Fretting Brickwork Is RepairedRead the guide GuideRepointing Brickwork: When Mortar Needs Repair and How It Is DoneRead the guide GuideCracked Brickwork: Brick Stitching, Repairs and When to WorryRead the guide GuideWall Tie Corrosion: Signs and Wall Tie ReplacementRead the guide GuideRusted Lintels: Cracks Above Windows and Lintel ReplacementRead the guide GuideEfflorescence: White Powder on Bricks and Concrete ExplainedRead the guide GuideRemoving Paint From Old Brick: A Heritage Owner's GuideRead the guide GuideRepointing Cost in Sydney: What Affects the PriceRead the guide GuideCracked or Dropped Brick Arches: Causes and RepairsRead the guide GuideLeaning or Cracked Brick Fence? Repair or RebuildRead the guide GuideWall Tie Replacement in Sydney Apartment BuildingsRead the guide GuideStructural Cracks in Apartment Buildings: When to WorryRead the guide GuideRetaining Wall Repairs in Strata BuildingsRead the guide GuideRusted Lintels in Apartment Buildings: Signs and RepairsRead the guide GuideBoundary Walls and Fences in Strata Schemes: RepairsRead the guide GuideFacade Cleaning and Sealing for Apartment BuildingsRead the guide
Where we work

Brickwork repairs across Sydney.

Older brick homes, terraces, walk-up apartments and commercial buildings across Sydney and surrounding NSW.

Let's get started

Send us photos of the brickwork.

A few photos of the fretting, cracking or eroded joints is enough for an initial view and to book an inspection.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote