Rusted Lintels in Apartment Buildings: Signs and Repairs

20 November 2026 · 4 min read · By the METCON team

Older brick apartment blocks in Sydney have a steel lintel over every window and door opening, holding up the brickwork above. Over decades, water gets to the steel and it rusts. Rust expands, so the lintel pushes the brickwork up and cracks it. With dozens of windows per building, it is a common strata repair.

Signs of rusted lintels

  • Horizontal cracks in the mortar just above or beside window heads.
  • Stepped cracks running up from the corners of windows.
  • Brickwork bowing or displaced above openings.
  • Rust stains or flaking steel visible at the window head.
  • Windows that stick because the opening has distorted.
New steel set into masonry, primed and protected against corrosion.
New steel set into masonry, primed and protected against corrosion.

Why they rust

  • Missing or failed flashings over the lintel.
  • Blocked weep holes, so water sits on the steel.
  • Thin original galvanising, or none at all.
  • Salt air in coastal and harbourside areas.

Repair options

ConditionTypical repair
Surface rust, no crackingClean, treat and protect, fix flashings
Cracking, lintel still soundPartial exposure, treatment, crack repair
Heavy corrosionRemove brickwork above, replace lintel with galvanised or stainless steel, new flashing and weep holes, rebuild

In an occupied building

Lintel replacement is done from outside, with the brickwork above temporarily supported. The window usually stays in, protected. Each opening takes a few days. Grouping openings by elevation shares scaffold costs. See rusted lintel replacement.

Combine with other facade work

Lintels pair well with wall tie replacement, repointing and window sealant renewal. See wall ties and red brick blocks.

Lintel replacement for strata

We replace lintels across occupied apartment buildings with engineer input. See brickwork repairs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Is a cracked window head dangerous?

Usually not immediately, but bowing or loose brickwork above an opening should be checked quickly, especially at height.

Can we just fill the cracks?

Filling cracks without treating the lintel lets the rust continue. The cracks come back.

Who pays for lintels in a strata building?

Lintels are part of the external walls, usually common property, so the owners corporation.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote