We demolish, design, and build new homes on existing blocks across Sydney. When renovation isn't enough, start fresh. A brand new home on the land you already love.
When the existing house has too many problems, structural issues, asbestos throughout, a floor plan that can't be fixed, or renovation costs that approach new-build prices, it makes more sense to start again. You keep the block you love and get the home you actually want.
METCON manages knock-down rebuilds from demolition through to handover. One builder handles the demolition, site clearing, council approvals, engineering, construction, and final certification. No gaps between contractors, no coordination headaches.
Whether it's a modest family home or a high-end custom build, starting from scratch on your own block lets you design exactly the home you need, built to current standards and energy codes.
If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.
Once renovation reaches this threshold, a new build gives you a better home for similar or less money.
When foundations, framing, and roofing all need work, the existing structure has no value to save.
Homes built before 1990 often contain asbestos in multiple locations. Full removal plus renovation can exceed rebuild cost.
Some layouts are fundamentally wrong, low ceilings, poor orientation, structural walls in all the wrong places.
A new build meets current NCC energy, accessibility, and structural standards automatically.
Many older homes don't maximise the block. A new design can capture views, light, and outdoor space the old home misses.
Considering a knock-down rebuild? Send us photos of the existing home and we'll advise whether rebuilding is the smarter option.
One builder manages the entire process, no gaps, no finger-pointing, no coordination problems between contractors.
Full residential demolition including asbestos removal, disconnection of services, demolition, site clearing, and waste disposal. All permits and notifications managed.
Excavation, compaction, site levelling, and service connections. Preparing the cleared site for new construction with proper engineering and survey control.
New home design coordinated with architects, engineers, and council. DA or CDC submission managed through to approval. Energy ratings and BASIX included.
Complete new home build from footings to handover. Structural frame, roofing, cladding, services, fit-out, and finishes. One builder, one contract.
Driveways, paths, retaining walls, fencing, and basic landscaping to complete the property. Coordinated as part of the overall build.
Final inspections, compliance certificates, and full documentation handover. New home warranty and maintenance guides. Keys in your hand.
A selection of recent knock-down & rebuild projects across Sydney.
View all projectsEvery knock-down rebuild follows our structured five-step process. From the first site visit to handing over the keys, one builder manages it all.
We inspect the existing home and block, assess demolition requirements, review planning controls, and advise on what can be built. You know the full picture before committing.
Working with architects and engineers, we design your new home to suit the block, your needs, and council requirements. DA or CDC submission managed to approval.
Existing home demolished, site cleared, services disconnected and reconnected. Excavation and site preparation completed ready for new construction.
Your new home is built from footings to finishes. One builder, coordinated trades, documented progress, and regular updates throughout construction.
Final inspections, occupation certificate, compliance certificates, and warranty documentation. Your new home is ready to move into.
Current building standards, new home warranty, full documentation, and a home designed exactly for how you live. Built from scratch, done right.
A knock-down rebuild needs a builder who can handle demolition, new construction, and everything in between. One builder, one contract, one responsibility. That's how we do it.
We manage demolition, site prep, construction, and handover. No gaps between contractors.
New home structurally engineered from the ground up, designed for the specific block and soil conditions.
Meteora Constructions Pty Ltd, fully licensed in NSW with all required insurances.
All approvals, permits, and certifications managed by us. One point of contact for the entire process.
Properly licensed demolition including asbestos handling, waste disposal, and environmental compliance.
Hands-on Sydney building experience going back to the 1970s.
Real reviews from homeowners, strata and builders.
I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
They handled the DA, the engineer, and the build. We didn't have to chase council once. Massive wall, done in under two weeks.
Straight answers from the builder. Anything else, just ask.
It depends on the scope. Typical durations:
We provide a detailed project timeline with your quote so you know exactly what to expect.
In many cases, home extensions and granny flats can be approved through a Complying Development Certificate (CDC), which is faster than a full DA.
This depends on factors like your property's zoning, heritage overlays, flood mapping, bushfire risk and the scope of the work.
We handle the approval process and can advise you on the fastest path to getting your project started.
In most cases, yes. For smaller renovations like bathrooms or kitchens, you can usually stay in the home.
For major structural works, first floor additions or knock-down rebuilds, you may need to move out temporarily. We will advise you during the planning stage and do everything we can to minimise disruption.
Every METCON quote is fully itemised and includes:
There are no hidden costs. What we quote is what you pay, unless you request changes to the scope.
We cover the full scope of residential work with one licensed team.
Back to Residential ConstructionPlain-language guides from our team on the questions we are asked most.
We deliver knock-down rebuilds across Sydney, from inner-city sites to suburban blocks and semi-rural properties.
A few photos of the existing home, the block, and a note on what you're hoping to achieve. We'll give you an honest assessment of whether rebuilding is the smarter path. No commitment.