Leaking balconies, cracked facades, failed waterproofing, fire safety defects and concrete cancer. We inspect common property, document every defect and cost the rectification, so your owners corporation can deal with the developer, the builder, the bond or the Tribunal with real evidence.
Owners corporations have a duty under the Strata Schemes Management Act 2015 to maintain and repair common property. When defects appear in a newer building, the committee also has to decide whether to pursue the developer or builder under the Home Building Act warranties, and it needs to move before time limits expire. Both decisions need a clear picture of what is wrong and what it will cost.
Defects in apartment buildings are often spread across many lots and areas, and the visible damage is rarely where the problem started. Water staining in one unit may come from a balcony, planter or facade above. We trace defects to their source, record them by location and set them out so the committee, the strata manager and the lawyers can follow them.
We are a DBP registered Class 2 builder, so we understand the regulated design and building compliance requirements that apply to apartment buildings, and our rectification scopes and costs reflect what it really takes to fix defects in an occupied building, including access, scaffolding and staging.

If any of these sound familiar, it is worth a call. We will tell you which report or quotation will help, and confirm a fixed fee before we start.
Leaks, cracking or failed finishes in the first years after completion, while warranties still apply.
The owners corporation is considering a claim and its lawyers need expert evidence.
Defects identified under the strata building bond scheme that need a rectification cost.
Leaks that keep coming back despite repairs, often from balconies, planters or the facade.
Fire separation, fire stopping or structural issues raised by an inspection or an order.
The committee needs a defect schedule and costs to plan levies and works.
Strata managers: send the defect history, any previous reports and the AGM or deadline dates, and we will scope the inspection and fee.
Reports organised by location and element, so committees, lawyers and other experts can work from one document.
Balconies, roofs, podiums, facades, carparks, basements, services areas and lot access where needed.
Every defect numbered, photographed and located by level, lot and element.
Where leaks and damage actually start, so the rectification scope fixes the cause.
Which items are likely to need regulated designs, engineers or approvals under the DBP Act.
A buildable scope with access, scaffolding and staging for an occupied building.
Fixed-price costs by item and location, ready for a claim, a Scott Schedule or a levy plan.
We plan access with the strata manager and building manager, then report in a format the committee can act on.
Tell us what the report is for and send the contract, plans, photos, correspondence and any Tribunal directions. We confirm the scope, timing and a fixed fee in writing before we attend.
We inspect, measure and photograph every item, take moisture readings and carry out non-destructive checks where they help. Each item is numbered and located.
Each item is assessed against the contract, the approved plans, the National Construction Code, Australian Standards and the manufacturer's instructions, and we identify the cause, not just the symptom.
You receive a written report with our opinion and reasons for each item, the scope of work to fix it and an itemised, fixed-price costing that shows how every figure was calculated.
We answer questions, prepare supplementary reports if new information comes to light, and attend an expert conclave, joint report or hearing when directed, with those fees agreed in advance.
A clear, costed defect schedule helps committees decide on claims, levies and works with confidence, and keeps every owner informed.
DBP registered builders who rectify balconies, facades, waterproofing and concrete in occupied apartment buildings every week.
We have built and repaired buildings in Sydney for over 40 years, so our scopes are buildable and our costs come from what the work really takes.
Builder licence 384697C and DBP General Unrestricted registration BUP4254812, including Class 2 apartment buildings.
Reports follow the structure NCAT and the courts expect: instructions, facts and assumptions, reasons for each opinion and the code of conduct acknowledgement.
You know the cost of the inspection and report before we attend. No hourly meter running in the background.
Every item is scoped and priced separately, with preliminaries, access, waste, supervision, margin and GST shown, so the numbers stand up to scrutiny.
Dated photos, measurements, readings and references to the relevant standards for every item, laid out so a member or judge can follow it.
Real reviews from METCON clients.
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
We're a strata block and needed a retaining wall replaced urgently. METCON moved fast, communicated well, and the residents are very happy.
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
Straight answers. Anything else, just ask.
Usually the owners corporation, from its administrative or capital works fund, approved by the committee or a general meeting depending on the amount and the by-laws. Your strata manager can advise on the approval needed.
Defect reports under the strata building bond and inspections scheme are prepared by the inspector appointed under that scheme. We can scope and price the rectification of the defects they identify, and rectify them.
Often, yes, for balconies, wet areas and ceilings where leaks show. We plan access through the strata manager and give residents notice.
It depends on the size of the property, the number of items and what the report is for. We confirm a fixed fee in writing before we attend, based on your documents and a short call, so there are no surprises.
Yes. When we act as an expert, our duty is to the Tribunal or court, not to the person who engaged us, and we say so in the report. We disclose any relationship with the parties and whether we have been asked to quote for the rectification work, as the expert code of conduct requires.
Most disputes need more than one document: a defect report, a costing, a Scott Schedule and sometimes a hearing. We can prepare them all from one inspection.
Back to Inspections & ReportsPlain-language guides from our team on the questions we are asked most.
Apartment buildings across the Eastern Suburbs, City, Inner West, Lower North Shore, Northern Beaches and beyond.
Send the building address, defect history and any reports or deadlines. We will scope the inspection and confirm a fixed fee.