Under the Home Building Act 1989, a major defect carries a six year statutory warranty. Other defects carry two years. So whether a defect is "major" can decide whether your claim is still alive. The definition in section 18E has three parts, and you need all three.
Part 1: It is in a major element
A major element is:
- An internal or external load-bearing component that is essential to the stability of the building, such as foundations, footings, floors, walls, roofs, columns and beams.
- A fire safety system.
- Waterproofing.
- Any other element prescribed by the regulations.

Part 2: It is caused by defective work
The defect must be attributable to defective design, defective or faulty workmanship, defective materials, or a failure to comply with the structural performance or fire safety requirements of the National Construction Code, or a combination of these.
Part 3: It causes, or is likely to cause, serious consequences
- The inability to inhabit or use the building, or part of it, for its intended purpose.
- The destruction of the building or any part of it.
- A threat of collapse of the building or any part of it.
"Likely to cause" matters. The consequence does not need to have happened yet if the evidence shows it is likely.
Waterproofing is not automatically major
Not every leak is a major defect. Tribunal decisions look at whether the element's purpose is to keep water out of the building, and then at the consequences. A leaking balcony membrane that is rotting framing or making a room unusable is a very different case from a small stain. The courts have said the definition should not be read narrowly, but every part still needs evidence.
Examples
| Defect | Likely major? |
|---|---|
| Failed balcony membrane leaking into the unit below, damaging framing | Often yes |
| Shower leaking into the wall cavity, making the bathroom unusable | Often yes |
| Cracking footing causing structural movement | Often yes |
| Missing fire collars where services pass through fire-rated walls | Often yes |
| Uneven paint finish or a chipped tile | No |
How to prove it
Your expert report needs to deal with each part of the test separately: identify the element and why it is a major element, explain the cause with reasons and testing where needed, then explain the consequence, current or likely. Evidence from the occupants about what they cannot use helps too.
Major defect reports in Sydney
We prepare defect reports that address the major defect test item by item, with fixed-price rectification costs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.
This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.
Frequently asked questions
Is a leaking shower a major defect?
It can be, if the waterproofing failure is caused by defective work and is likely to make the bathroom or another part of the home unusable, or to destroy part of the building. Each case depends on its evidence.
Does a major defect have to be dangerous?
Not necessarily. The consequence can be the inability to use part of the building for its intended purpose, not just collapse.
Who decides if a defect is major?
The Tribunal or court, on the evidence. An expert report that addresses all three parts of the test is the key evidence.