Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Internal Strip-Outs ยท Sydney Strip it back. Start fresh. Done safely.

We plan, manage, and execute internal strip-outs for commercial and residential properties across Sydney. Controlled demolition of interiors, asbestos management, and clean handover. Ready for the next build, not a mess left behind.

  • Licensed NSW Builder
  • Commercial Strip-Outs
  • Residential Strip-Outs
  • Asbestos Identification & Removal
  • Controlled Interior Demolition
  • Waste Removal & Recycling
Talk directly with the builder0415 840 500

Free internal strip-outs quote

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Before you build, you strip

Every renovation starts with a clean slate.

Whether it's an office floor, a restaurant tenancy, a retail shop, or an old house, the existing fit-out has to come out before anything new goes in. An internal strip-out is controlled demolition that removes everything down to the base building structure, walls, ceilings, flooring, services, and fixtures.

METCON manages internal strip-outs as proper demolition projects. Asbestos identified and removed by licensed handlers, hazardous materials managed, waste sorted and disposed of correctly, and the space handed back clean, safe, and ready for the next stage.

A rushed or uncontrolled strip-out damages the structure you're keeping, spreads contamination, and creates problems that cost more to fix than the strip-out itself. We do it methodically, every time.

Internal strip-out with debris cleared back to structure
40+Years on the tools
Is this you?

Six situations that need a professional strip-out

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

End-of-lease make-good required

Returning a commercial tenancy to base building condition per your lease terms. Documented and photographed.

Building pre-dates 1990 and may contain asbestos

Any building built before 1990 may contain asbestos in walls, ceilings, flooring, or pipe lagging. Testing and licensed removal required.

Full interior needs to come out before renovation

When the renovation scope requires everything removed to the shell, a proper strip-out is faster and safer than piecemeal demolition.

Multiple materials and services to disconnect

Electrical, plumbing, mechanical, fire systems, data cabling, all need safe disconnection before demolition begins.

Load-bearing elements need protection during demo

Columns, beams, and structural walls must be identified and protected during strip-out to avoid damaging the building.

Waste disposal and recycling compliance required

Commercial waste streams need sorting, documentation, and compliant disposal. Skip bins aren't always enough.

Need a strip-out before your renovation? Send us photos and the scope, we'll quote the strip-out separately or as part of the full build.

What we strip out

Complete interior demolition.

From a single room to an entire building floor, we handle every type of internal strip-out safely and methodically.

01

Commercial Office Strip-Outs

Full floor or multi-floor office strip-outs. Partitions, ceilings, flooring, kitchen, bathrooms, and all services disconnected and removed to base building.

02

Retail & Hospitality Strip-Outs

Shop and restaurant strip-outs including commercial kitchen removal, bar demolition, shopfront removal, and compliance with landlord make-good requirements.

03

Residential Interior Strip-Outs

Whole-house or room-by-room interior demolition. Kitchens, bathrooms, internal walls, ceilings, and flooring removed for renovation or rebuild.

04

Asbestos Identification & Removal

Testing, identification, and licensed removal of asbestos-containing materials. Air monitoring, clearance certificates, and compliant disposal.

05

Waste Management & Recycling

Sorted waste disposal, recycling of metals, timber, and concrete. Waste tracking documentation and compliant disposal to licensed facilities.

06

Structural Protection

Identification and protection of structural elements during strip-out. Temporary support where required. The building stays safe while the interior comes out.

Recent work

Internal Strip-Outs projects.

A selection of recent internal strip-outs projects across Sydney.

View all projects
Our process

Methodical. Not destructive.

Every strip-out follows our structured five-step process. We plan the removal sequence, manage hazards, and hand back a clean, safe space.

Site Assessment & Scope

We inspect the site, identify hazardous materials, assess structural elements, and define exactly what stays and what goes. The scope is agreed before any work starts.

Hazard Management

Asbestos testing, hazardous material identification, and removal plans prepared. Licensed handlers engaged where required. Safety plans in place.

Service Disconnection

Electrical, plumbing, mechanical, fire, and data services safely disconnected and capped. Coordinated with building management and utility providers.

Controlled Demolition

Interior elements removed in planned sequence. Structural elements protected, dust suppressed, noise managed, and waste sorted throughout.

Clean Handover

Site cleaned, waste removed, surfaces swept and ready for the next stage. Asbestos clearance certificates and waste documentation provided.

A clean space, ready for the next build.

Asbestos clearance certificates, waste disposal records, photographic documentation, and a site that's genuinely ready for construction.

Why choose METCON

Sydney's strip-out specialists.

A strip-out done badly creates problems for the entire project that follows. We get it right the first time, safe, clean, compliant, and documented.

Hazard Managed

Asbestos and hazardous materials identified, tested, and removed by licensed handlers before any demolition.

Structural Awareness

We understand building structures, what to protect, what to prop, and what can safely come out.

Licensed Builder

Meteora Constructions Pty Ltd, fully licensed in NSW with all required insurances.

Waste Compliance

Sorted waste streams, recycling, documented disposal, and compliance with EPA requirements.

Building Management

We work within occupied buildings, coordinating with management on access, noise, dust, and timing.

40+ Years Experience

Hands-on Sydney building experience going back to the 1970s.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

We're a strata block and needed a retaining wall replaced urgently. METCON moved fast, communicated well, and the residents are very happy.
PSPriya Sharma North Sydney
I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
LCLisa Chen Randwick
We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
KLKaren Lawson Bondi Junction
Internal Strip-Outs FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Do I need a permit for demolition work?

Yes, most demolition work in NSW requires approval. Internal strip-outs may be exempt in some cases, but partial and full demolition typically require a Development Application or Complying Development Certificate.

Additional requirements may include:

  • Asbestos surveys
  • Waste management plans
  • Notification to adjoining property owners

We handle all permits and compliance requirements.

Can you remove asbestos?

We coordinate licensed asbestos removal as part of our demolition and renovation services. All asbestos work is carried out by licensed removalists in line with SafeWork NSW regulations.

If your property was built before 1990, there is a chance it contains asbestos, so we always arrange appropriate testing before starting demolition or renovation work.

What is included in your quotes?

Every METCON quote is fully itemised and includes:

  • Scope of work
  • Materials and specifications
  • Labour costs
  • Excavation and site preparation
  • Drainage (where applicable)
  • Engineering fees
  • Council application fees
  • Project timeline and payment schedule

There are no hidden costs. What we quote is what you pay, unless you request changes to the scope.

What happens if something goes wrong during the build?

Construction can sometimes uncover unexpected issues, especially on older properties or difficult sites.

If we find something outside the original scope, such as hidden asbestos, unstable soil or structural defects, we tell you immediately, explain the options and give you a clear cost for any additional work before proceeding.

You are never hit with surprise bills.

Other demolition & excavation services

More demolition & excavation services.

We cover the full scope of demolition & excavation work with one licensed team.

Back to Demolition & Excavation
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Sydney-wide strip-out services.

We deliver internal strip-outs across Sydney, from CBD office towers to suburban homes and retail tenancies.

MosmanManlyCremorneLane CoveChatswoodHornsbyParramattaStrathfieldBurwoodConcordHunters HillDrummoyneFive DockLeichhardtNewtownSurry HillsPaddingtonBondiRandwickCoogeeMaroubraSutherlandHurstvilleKogarahCronullaEngadinePenrithLiverpoolCampbelltownWollongongCentral Coast+ Greater Sydney
Let's get started

Send us the scope.

Photos of the space, a note on what needs to come out, and the building age if you know it. We'll come back with a scope, timeline, and fixed-price quote. Clean start, done safely.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote