Partial Demolition ยท Sydney Remove part. Keep the rest. No surprises.

We plan, engineer, and execute partial demolition across Sydney. Selective wall removal, section demolition, and structural modifications. Controlled precision, not a wrecking ball.

  • Licensed NSW Builder
  • Selective Wall Removal
  • Section Demolition
  • Load-Bearing Wall Engineering
  • Temporary Propping Systems
  • Structural Modification
Talk directly with the builder0415 840 500

Free partial demolition quote

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
When only part of the building needs to go

Precision demolition demands engineering.

Partial demolition is harder than knocking everything down. You're removing specific elements while keeping the rest of the building standing, safe, and undamaged. Load-bearing walls, shared party walls, upper floors above, and live services all need to be considered before a single hit is taken.

METCON coordinates partial demolition with structural engineers. We assess what's load-bearing, design temporary support, plan the demolition sequence, and execute with precision. The structure you're keeping stays safe throughout.

Whether it's removing a wall for an open-plan layout, taking out a section of building for an extension, or demolishing one part of a structure while the rest stays occupied, we plan the engineering first, then execute the demolition.

New opening cut through a masonry wall
40+Years on the tools
Is this you?

Six situations that need partial demolition expertise

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Removing a load-bearing wall

Load-bearing walls support the structure above. Removal requires engineering design, temporary propping, and a new beam or lintel.

Demolishing a section for an extension

When extending a building, part of the existing structure often needs to come out to connect old to new properly.

Opening up a shared or party wall

Party wall modifications have specific legal and structural requirements. Engineering and neighbour coordination needed.

Upper floors remain while ground floor is modified

Removing ground-floor elements while the upper level stays requires careful propping and load-path management.

Occupied building with adjacent tenants

Partial demolition in occupied buildings needs vibration control, dust management, and structural monitoring.

Heritage building requiring selective removal

Heritage buildings need careful, selective demolition that preserves significant fabric while removing what's no longer needed.

Need to remove part of a building? Send us photos and we'll advise on the engineering and demolition approach.

What we demolish

Selective removal. Structural control.

From single wall removal to multi-section demolition, we handle every type of partial demolition with engineering precision.

01

Load-Bearing Wall Removal

Structural assessment, temporary propping design, demolition, and new beam or lintel installation. The structure above stays safe and supported throughout.

02

Section Demolition

Removing defined sections of a building, rooms, wings, levels, or portions, while maintaining the structural integrity of everything that remains.

03

Upper-Level Removal

Taking off an upper level or partial storey while maintaining the structural stability of the lower levels. Roof, framing, and services stripped in sequence.

04

Foundation Modifications

Partial foundation removal, undercutting, and modification for basement extensions, lowered floor levels, or service installations.

05

Temporary Support Systems

Design and installation of temporary propping, shoring, and bracing to maintain structural stability during demolition and modification works.

06

Structural Cutting

Precision concrete cutting, core drilling, and steel cutting for controlled openings, penetrations, and selective removal without vibration damage.

Recent work

Partial Demolition projects.

A selection of recent partial demolition projects across Sydney.

View all projects
Our process

Engineered removal. Nothing left to chance.

Every partial demolition follows our structured five-step process. The engineering comes first, the demolition follows the plan exactly.

Structural Assessment

We inspect the structure, identify load paths, locate services, and determine what's load-bearing versus non-structural. This drives every decision that follows.

Engineering Design

Structural engineer designs the demolition sequence, temporary support, and permanent modifications. Nothing is removed without an engineered plan.

Safety & Staging

Safety plan, dust and vibration management, neighbour notifications, and construction staging developed. Permits and approvals obtained.

Controlled Demolition

Demolition executed per the engineer's sequence. Temporary supports installed before removal, structural elements protected, and work documented at hold points.

Structural Completion

New beams, lintels, or connections installed as designed. Temporary supports removed per engineer's instruction. Structure certified safe and stable.

Precise removal, with the engineering behind it.

Structural engineering, demolition documentation, photographic records, and engineer certification. Everything needed for the next stage of your project.

Why choose METCON

Sydney's partial demolition specialists.

Partial demolition is where building knowledge matters most. We understand structures, how they carry load, where the critical paths are, and how to safely modify them.

Engineer Coordinated

Every partial demolition is coordinated with a structural engineer. The plan comes before the hammer.

Structural Builders

We build structures as well as demolish them, we understand both sides of the equation.

Licensed Builder

Meteora Constructions Pty Ltd, fully licensed in NSW with all required insurances.

Propping & Shoring

We design and install temporary support systems to maintain stability during demolition.

Occupied Buildings

We execute partial demolition in occupied buildings with proper vibration, dust, and noise management.

40+ Years Experience

Hands-on Sydney building experience going back to the 1970s.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

We're a strata block and needed a retaining wall replaced urgently. METCON moved fast, communicated well, and the residents are very happy.
PSPriya Sharma North Sydney
I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
LCLisa Chen Randwick
We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
KLKaren Lawson Bondi Junction
Partial Demolition FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Do I need a permit for demolition work?

Yes, most demolition work in NSW requires approval. Internal strip-outs may be exempt in some cases, but partial and full demolition typically require a Development Application or Complying Development Certificate.

Additional requirements may include:

  • Asbestos surveys
  • Waste management plans
  • Notification to adjoining property owners

We handle all permits and compliance requirements.

Can you remove asbestos?

We coordinate licensed asbestos removal as part of our demolition and renovation services. All asbestos work is carried out by licensed removalists in line with SafeWork NSW regulations.

If your property was built before 1990, there is a chance it contains asbestos, so we always arrange appropriate testing before starting demolition or renovation work.

What is included in your quotes?

Every METCON quote is fully itemised and includes:

  • Scope of work
  • Materials and specifications
  • Labour costs
  • Excavation and site preparation
  • Drainage (where applicable)
  • Engineering fees
  • Council application fees
  • Project timeline and payment schedule

There are no hidden costs. What we quote is what you pay, unless you request changes to the scope.

What happens if something goes wrong during the build?

Construction can sometimes uncover unexpected issues, especially on older properties or difficult sites.

If we find something outside the original scope, such as hidden asbestos, unstable soil or structural defects, we tell you immediately, explain the options and give you a clear cost for any additional work before proceeding.

You are never hit with surprise bills.

Other demolition & excavation services

More demolition & excavation services.

We cover the full scope of demolition & excavation work with one licensed team.

Back to Demolition & Excavation
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Sydney-wide partial demolition services.

We deliver partial demolition across Sydney, from inner-city terraces to commercial buildings and industrial facilities.

MosmanManlyCremorneLane CoveChatswoodHornsbyParramattaStrathfieldBurwoodConcordHunters HillDrummoyneFive DockLeichhardtNewtownSurry HillsPaddingtonBondiRandwickCoogeeMaroubraSutherlandHurstvilleKogarahCronullaEngadinePenrithLiverpoolCampbelltownWollongongCentral Coast+ Greater Sydney
Let's get started

Send us photos & plans.

Photos of what you want removed, existing plans if you have them, and a note on the broader project context. We'll assess the structural implications and come back with an approach and price.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote