Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Heritage Restoration ยท Sydney Heritage buildings, restored with care.

Sandstone foundations, lime mortars, old footings and a century of repairs layered on top. We restore Sydney's older homes and buildings with the right methods and materials for their age.

  • Sandstone repairs
  • Lime mortar repointing
  • Heritage structural repairs
  • Rising damp treatment
  • Victorian and Federation homes
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Heritage restoration

Old buildings need the right methods.

Sydney's Victorian terraces, Federation homes and sandstone buildings were built with lime mortars, soft bricks and sandstone footings that behave very differently to modern materials. Using cement-based repairs on them often traps moisture and speeds up the damage.

We have spent over 40 years working on older Sydney buildings, from an 1850 residence in Darlinghurst to an 1880 property in Enmore and a 1920s semi in Vaucluse with complex sandstone foundations. These are the jobs where experience matters most.

Restoration work is planned around what is original and worth keeping. We repair sandstone, repoint in lime, treat rising damp, stabilise footings and fix previous defective work, coordinating with engineers and heritage requirements where they apply.

METCON director inspecting heritage sandstone walls
DBPRegistered builder
Is this you?

Six signs your heritage home needs work

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Fretting sandstone

Stone that is powdering, flaking or losing its face, often at the base of walls.

Crumbling mortar joints

Old lime mortar that has eroded or been patched with hard cement.

Rising damp and salt damage

Tide marks, bubbling paint and crumbling plaster at the base of walls.

Cracking and movement

Cracks in walls and around openings from settling footings or failed lintels.

Previous poor repairs

Cement render, patches or alterations that are now causing damage.

Rotting timber elements

Floors, joists and verandahs affected by damp and poor ventilation.

Restoring an older home? Send us photos of the areas of concern and we will give you an honest view of what is involved.

What we restore

Heritage restoration works.

We keep what is original and worth saving, and repair it with materials that suit the building.

01

Sandstone Repairs

Repair, dress back or replace weathered sandstone in walls, sills, steps and footings.

02

Lime Repointing

Rake out cement and failed joints and repoint with lime mortars that let old walls breathe.

03

Structural Stabilisation

Engineer-designed footing, underpinning and wall repairs for older buildings.

04

Rising Damp Treatment

DPC injection, salt-resistant render systems and improved drainage and ventilation.

05

Remediating Past Work

Removing and correcting defective previous repairs and alterations.

06

Verandahs & Timber

Repairs to verandahs, floors and joists affected by damp or decay.

Recent work

Heritage Restoration projects.

A selection of recent heritage restoration projects across Sydney.

View all projects
Our process

Restored, not just repaired.

Every heritage project follows the same five steps, from inspection to handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

Your heritage home, restored properly.

A full photo record, materials schedule and documentation of what was repaired, replaced and kept. Valuable for heritage approvals, insurers and future owners.

Why choose METCON

Sydney's heritage restoration builders.

Heritage restoration is where 40+ years on Sydney sites shows. We know how older buildings were built and how to repair them without causing new problems.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

We have been undertaking a considerable repair and restoration of our 1850 residence in Darlinghurst. Constatine and his team completed outstanding work, all at a very competitive price. Every deadline was met with no increase to the original quote. Their knowledge, gathered over many years, and their incredible eye for detail significantly improved the final outcome beyond what was originally proposed. I rate them very highly and would recommend them wholeheartedly.
NDNicholas Davie Darlinghurst
Constatine and his team were outstanding from start to finish. They responded quickly, arrived on time for the quote, and once awarded the project, completed everything on schedule. The property was built in 1880 and presented a very difficult scope of work, but the team handled it expertly. We received regular updates, excellent advice, and the quality of workmanship was exceptional. They were also extremely tidy throughout the process. I could not recommend METCON highly enough.
MMatthew Enmore
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Heritage Restoration FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

What is remedial building?

Remedial building is the repair of defects, damage and deterioration in existing buildings, such as concrete cancer, leaking balconies, failed waterproofing, rising damp and cracked facades. The aim is to fix the underlying cause and restore the building's performance, not just its appearance.

How much does remedial building work cost?

It depends entirely on the defect, its extent, access and the specification. A small concrete cancer patch is very different from a whole-building balcony programme. We inspect for free and provide an itemised written quote so you can see exactly where the money goes.

Is remedial work covered by warranty?

Residential building work in NSW carries statutory warranties under the Home Building Act 1989: six years for major defects and two years for other defects. We provide full documentation at handover.

Can you work from our engineer's report?

Yes. We regularly price and deliver remedial scopes written by independent engineers, and we can also help you engage one if you do not have a report yet.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Heritage restoration across Sydney.

Terraces and older homes in Paddington, Darlinghurst, Surry Hills, Balmain, Enmore, Newtown, Vaucluse and right across Sydney.

Let's get started

Tell us about your building.

The age of the building, what you are seeing and a few photos is enough for an initial view. We will book an inspection from there.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote